Free Access
Issue
RAIRO-Oper. Res.
Volume 52, Number 3, July–September 2018
Page(s) 943 - 954
DOI https://doi.org/10.1051/ro/2017013
Published online 26 October 2018
  • K. Annadurai and R. Uthayakumar, Reducing lost-sales rate in (T, R, L) inventory model with controllable lead time. Appl. Math. Modell. 34 (2010) 3465−3477 [CrossRef] [Google Scholar]
  • A. Banerjee, A joint economic-lot-size model for purchaser and vendor. Decision Sci. 17 (1986) 292−311 [CrossRef] [Google Scholar]
  • A. Banerjee and S. Banerjee, A coordinated order-up-to inventory control policy for a single supplier and multiple buyers using electronic data interchange. Int. J. Prod. Econom. 35 (1994) 85−91 [CrossRef] [Google Scholar]
  • A. Banerjee and J.S. Burton, Coordinated versus independent inventory replenishment policies for a vendor and multiple buyers. Int. J. Prod. Econom. 35 (1994) 215−222 [CrossRef] [Google Scholar]
  • M. Ben-Daya and A. Raouf, Inventory models involving lead time as a decision variable. J. Oper. Res. Soc. 45 (1994) 579−582 [CrossRef] [Google Scholar]
  • L.E. Cárdenas-Barrón, K.J. Chung and G. Treviño-Garza, Celebrating a century of the economic order quantity model in honor of Ford Whitman Harris. Int. J. Prod. Econom. 155 (2014) 1−7 [CrossRef] [Google Scholar]
  • L.E. Cárdenas-Barrón and S.S. Sana, A production-inventory model for a two-echelon supply chain when demand is dependent on sales teams’ initiatives. Int. J. Prod. Econom. 155 (2014) 249−258 [CrossRef] [Google Scholar]
  • L.E. Cárdenas-Barrón and G. Treviño-Garza, An optimal solution to a three echelon supply chain network with multi-product and multi-period. Appl. Math. Modell. 38 (2014) 1911−1918 [CrossRef] [Google Scholar]
  • L.E. Cárdenas-Barrón and S.S. Sana, Multi-item EOQ inventory model in a two-layer supply chain while demand varies with a promotional effort. Appl. Math. Modell. 39 (2015) 6725−6737 [CrossRef] [Google Scholar]
  • H.J. Chang, R.H. Su, C.T. Yang and M.W. Weng, An economic manufacturing quantity model for a two-stage assembly system with imperfect processes and variable production rate. Comput. Industrial Eng. 63 (2012) 285−293 [CrossRef] [Google Scholar]
  • C.J. Chung, An easy method to derive the integrated vendor-buyer production-inventory model with backordering using cost-difference rate comparison approach. Math. Comput. Modell. 57 (2013) 632−640 [CrossRef] [Google Scholar]
  • C.J. Conrad and H. McClamrock, The drilling problem: a stochastic modeling and control example in manufacturing. IEEE Tran. Auto. Cont. 32 (1987) 947−958 [CrossRef] [Google Scholar]
  • A. Gholami-Qadikolaei, A. Mirzazadeh and R. Tavakkoli-Moghaddam, Lead time and ordering cost reductions in budget and storage space restricted probabilistic inventory models with imperfect items. RAIRO: OR 49 (2015) 215−242 [CrossRef] [Google Scholar]
  • B.C. Giriand T. Dohi, Computational aspects of an extended EMQ model with variable production rate. Comput. Oper. Res. 32 (2005) 3143−3161 [CrossRef] [Google Scholar]
  • C.H. Glock and T. Kim, The effect of forward integration on a single-vendor multi-retailer supply chain under retailer competition. Int. J. Prod. Econom. 164 (2015) 179−192 [CrossRef] [Google Scholar]
  • S.K. Goyal, An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 15 (1976) 107−111 [Google Scholar]
  • S.K. Goyal, Economic ordering policy for deteriorating items over an infinite time horizon. Eur. J. Oper. Res. 28 (1987) 298−301 [CrossRef] [Google Scholar]
  • S.K. Goyal, A joint economic-lot-size model for purchaser and vendor: a comment. Deci. Sci. 19 (1988) 236−241 [CrossRef] [Google Scholar]
  • R. Guan and X. Zhao, Pricing and inventory management in a system with multiple competing retailers under (r, Q) policies. Comput. Oper. Res. 38 (2011) 1294–1304 [CrossRef] [Google Scholar]
  • D. Ha and S.L. Kim, Implementation of JIT purchasing: an integrated approach. Prod. Plan. Cont. 8 (1997) 152−157 [CrossRef] [Google Scholar]
  • M.A. Hoque, Synchronization in the single-manufacturer multi-buyer integrated inventory supply chain. Eur. J. Oper. Res. 188 (2008) 811−825 [CrossRef] [Google Scholar]
  • J.K. Jha and K. Shanker, Two-echelon supply chain inventory model with controllable lead time and service level constraint. Comput. Industrial Eng. 57 (2009) 1096−1104 [CrossRef] [Google Scholar]
  • M. Khouja and A. Mehrez, Economic production lot size model with variable production rate and imperfect quality. J. Oper. Res. Soc. 45 (1994) 1405−1417 [CrossRef] [Google Scholar]
  • C.J. Liao and C.H. Shyu, An analytical determination of lead time with normal demand. Int. J. Oper. Prod. Manag. 11 (1991) 72−78 [CrossRef] [Google Scholar]
  • I. Moon, E. Sin and B. Sarkar, Min-max distribution free continuous review model with a service level constraint and variable lead time, Appl. Math. Comput. 229 (2014) 310−315 [Google Scholar]
  • L.Y. Ouyang, N.C. Yeh and K.S. Wu, Mixture inventory model with backorders and lost sales for variable lead time. J. Oper. Res. Soc. 47 (1996) 829−832 [CrossRef] [Google Scholar]
  • L.Y. Ouyang, K.S. Wu and C.H. Ho, Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. Int. J. Prod. Econom. 92 (2004) 255−266 [CrossRef] [Google Scholar]
  • J.C.H. Pan and J.S. Yang, A study of an integrated inventory with controllable lead time. Int. J. Prod. Res. 40 (2002) 1263−1273 [CrossRef] [Google Scholar]
  • B. Sarkar, A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Appl. Math. Modell. 37 (2013) 3138−3151 [CrossRef] [Google Scholar]
  • B. Sarkar and A. Majumder, Integrated vendor-buyer supply chain model with vendor’s setup cost reduction. Appl. Math. Comput. 224 (2013) 362−371 [Google Scholar]
  • B. Sarkarand I. Moon, Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int. J. Prod. Econom. 155 (2014) 2014−2013 [Google Scholar]
  • B. Sarkar, L.E. Cárdenas-Barrón, M. Sarkar and M.L. Singgih, An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J. Manufact. Syst. 33 (2014) 423−435 [CrossRef] [Google Scholar]
  • B. Sarkar and A.S. Mahapatra, Periodic review fuzzy inventory models with variable lead time and fuzzy demand. Int. Tran. Oper. Res. 24 (2017) 1197–227 [CrossRef] [Google Scholar]
  • B. Sarkar, K.S. Chaudhuri and I. Moon, Manufacturing setup cost reduction and quality improvement for the distribution free continuous-review inventory model with a service level. J. Manufact. Syst. 34 (2015) 74−82 [CrossRef] [Google Scholar]
  • B. Sarkar, B. Mondal and S. Sarkar, Quality improvement and backorder price discount under controllable lead time in an inventory model. J. Manufact. Syst. 35 (2015) 26−36 [CrossRef] [Google Scholar]
  • B. Sarkar, Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products. Math. Prob. Eng. 2016 (2016) 6318737 [CrossRef] [Google Scholar]
  • B. Sarkar, A. Majumder, M. Sarkar, B.K. Dey and G. Roy, Two-echelon supply chain model with manufacturing quality improvement and setup cost reduction. J. Indus. Manag. Optim. 13 (2017) 1085−1104 [Google Scholar]
  • S.P. Sarmah, D. Acharya and S.K. Goyal, Coordination of a single-manufacturer/multi-buyer supply chain with credit option. Int. J. Prod. Econom. 111 (2008) 676−685 [CrossRef] [Google Scholar]
  • D. Shin, R. Guchhait, B. Sarkar and M. Mittal, Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model. RAIRO-Oper. Res. 50 (2015) 921−934 [CrossRef] [Google Scholar]
  • H.N. Soni and K.A. Patel, Optimal strategy for an integrated inventory system involving variable production and defective items under retailer partial trade credit policy. Deci. Supp. Syst. 54 (2012) 235−247 [CrossRef] [Google Scholar]
  • P.S. You, Optimal times of price reductions for an inventory model with partial backorder and vertical shift demand. RAIRO: OR 41 (2007) 35−47 [CrossRef] [EDP Sciences] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.