Free Access
Issue
RAIRO-Oper. Res.
Volume 53, Number 4, October 2019
Page(s) 1385 - 1406
DOI https://doi.org/10.1051/ro/2018068
Published online 09 September 2019
  • B.E. Asbjørnslett, Project supply chain management: from agile to lean (2003). [Google Scholar]
  • R. Basu, Managing Project Supply Chains. Gower Publishing Ltd., Farnham (2011). [Google Scholar]
  • B.S. Blanchard and W.J. Fabrycky, Systems Engineering and Analysis. Prentice Hall, Englewood Cliffs, NJ (1998). [Google Scholar]
  • B.M. Beamon, Supply chain design and analysis: models and methods. Int. J. Prod. Econ. 55 (1998) 281–294. [Google Scholar]
  • H. Badri, S.F. Ghomi and T.H. Hejazi, A two-stage stochastic programming model for value-based supply chain network design. Sci. Iran. Trans. E Ind. Eng. 23 (2016) 348. [Google Scholar]
  • S. Chopra and P. Meindl, Supply chain management. Strategy, planning & operation. In: Das summa summarum des management. Prentice Hall, Upper Saddle River, NJ (2007) 265–275. [CrossRef] [Google Scholar]
  • P.D. Cousins and R. Spekman, Strategic supply and the management of inter-and intra-organisational relationships. J. Purchasing Supply Manage. 9 (2003) 19–29. [CrossRef] [Google Scholar]
  • E. Falatoonitoosi, Z. Leman and S. Sorooshian, Modelling for green supply chain evaluation. Math. Prob. Eng. 2013 (2013) 201208. [CrossRef] [Google Scholar]
  • M. Forozandeh, E. Teimoury and A. Makui, A model for network design of supply chain management in research projects. Uncertain Suppl. Chain Manag. 6 (2018) 407–422. [CrossRef] [Google Scholar]
  • M.H. Hugos, Essentials of Supply Chain Management. John Wiley & Sons, Hoboken, NJ (2018). [CrossRef] [Google Scholar]
  • H. Kerzner and H.R. Kerzner, Project Management: a Systems Approach to Planning, Scheduling, and Controlling. John Wiley & Sons, Hoboken, NJ (2017). [Google Scholar]
  • D. Lock (Ed.), Gower Handbook of Project Management, Gower Publishing Ltd., Farnham (1994). [Google Scholar]
  • S. Mohamed and S. Tucker, Options for applying BPR in the Australian construction industry. Int. J. Project Manage. 14 (1996) 379–385. [CrossRef] [Google Scholar]
  • A. Majumder, R. Guchhait and B. Sarkar, Manufacturing quality improvement and setup cost reduction in a vendor-buyer supply chain model. Eur. J. Ind. Eng. 11 (2017) 588–612. [CrossRef] [Google Scholar]
  • G. Nassimbeni, Network structures and co-ordination mechanisms: a taxonomy. Int. J. Oper. Prod. Manage. 18 (1998) 538–554. [CrossRef] [Google Scholar]
  • B. Sarkar, Supply chain coordination with variable backorder, inspections, and discount policy for fixed lifetime products. Math. Prob. Eng. 2016 (2016) 6318737. [CrossRef] [Google Scholar]
  • B. Sarkar, B. Ganguly, M. Sarkar and S. Pareek, Effect of variable transportation and carbon emission in a three-echelon supply chain model. Trans. Res. Part E: Logis. Trans. Rev. 91 (2016) 112–128. [CrossRef] [Google Scholar]
  • B. Sarkar, S. Saren, D. Sinha and S. Hur, Effect of unequal lot sizes, variable setup cost, and carbon emission cost in a supply chain model. Math. Prob. Eng. 2015 (2015) 469486. [CrossRef] [Google Scholar]
  • B. Sarkar, A production-inventory model with probabilistic deterioration in two-echelon supply chain management. Appl. Math. Model. 37 (2013) 3138–3151. [Google Scholar]
  • J.R. Turner, Handbook of Project-based Management, McGraw-Hill Professional Publishing, New York, NY (2008). [Google Scholar]
  • L.M. Wingate, Project Management for Research and Development: Guiding Innovation for Positive R&D Outcomes. CRC Press, Boca Raton, FL (2014). [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.