Free Access
Issue
RAIRO-Oper. Res.
Volume 54, Number 2, March-April 2020
Page(s) 435 - 450
DOI https://doi.org/10.1051/ro/2019029
Published online 27 February 2020
  • E.L. Porteus, Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. [Google Scholar]
  • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Trans. 18 (1986) 48–55. [Google Scholar]
  • C.H. Kim and Y. Hong, An optimal production run length in deteriorating production processes. Int. J. Prod. Econ. 58 (1999) 183–189. [Google Scholar]
  • M. Ben-Daya and M. Hariga, Economic lot scheduling problem with imperfect production processes. J. Oper. Res. Soc. 51 (2000) 875–881. [Google Scholar]
  • M.K. Salameh and M.Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. [Google Scholar]
  • C.K. Huang, An integrated vendor–buyer cooperative inventory model for items with imperfect quality. Prod. Plan. Control 13 (2002) 355–361. [CrossRef] [Google Scholar]
  • K.J. Chung and K.L. Hou, An optimal production run time with imperfect production processes and allowable shortages. Comput. Oper. Res. 30 (2003) 483–490. [Google Scholar]
  • R.H. Yeh, W.T. Ho and S.T. Tseng, Optimal production run length for products sold with warranty. Eur. J. Oper. Res. 120 (2000) 575–582. [Google Scholar]
  • M. Ben-Daya and A. Rahim, Optimal lot-sizing, quality improvement and inspection errors for multistage production systems. Int. J. Prod. Res. 41 (2003) 65–79. [Google Scholar]
  • C.K. Huang, An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration. Int. J. Prod. Econ. 91 (2004) 91–98. [Google Scholar]
  • D. Ha and S.L. Kim, Implementation of JIT purchasing: an integrated approach. Prod. Plan. Control 8 (1997) 152–157. [CrossRef] [Google Scholar]
  • C.C. Hsieh and Z.Z. Lee, Joint determination of production run length and number of standbys in a deteriorating production process. Eur. J. Oper. Res. 162 (2005) 359–371. [Google Scholar]
  • C.K. Chen and C.C. Lo, Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages. Math. Comput. Model. 44 (2006) 319–331. [Google Scholar]
  • S.S. Sana, S.K. Goyal and K. Chaudhuri, On a volume flexible inventory model for items with an imperfect production system. Int. J. Oper. Res. 2 (2006) 64–80. [CrossRef] [Google Scholar]
  • S.S. Sana, S.K. Goyal and K. Chaudhuri, An imperfect production process in a volume flexible inventory model. Int. J. Prod. Econ. 105 (2007) 548–559. [Google Scholar]
  • D. Ojha, B.R. Sarker and P. Biswas, An optimal batch size for an imperfect production system with quality assurance and rework. Int. J. Prod. Res. 45 (2007) 3191–3214. [Google Scholar]
  • U. Buscher, S. Rudert and C. Schwarz, A note on: an optimal batch size for an imperfect production system with quality assurance and rework. Int. J. Prod. Res. 47 (2009) 7063–7067. [Google Scholar]
  • S.S. Sana, A production–inventory model in an imperfect production process. Eur. J. Oper. Res. 200 (2010) 451–464. [Google Scholar]
  • P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control 12 (2001) 584–590. [CrossRef] [Google Scholar]
  • Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng. Optim. 35 (2003) 427–437. [CrossRef] [Google Scholar]
  • S.W. Chiu, D.C. Gong and H.M. Wee, Effects of random defective rate and imperfect rework process on economic production quantity model. Jpn J. Ind. Appl. Math. 21 (2004) 375. [Google Scholar]
  • Y.S.P. Chiu, S.W. Chiu and H.C. Chao, Numerical method for determination of reworking or scraping the defective items in a finite production rate model. Int. J. Numer. Methods Biomed. Eng. 22 (2006) 377–386. [Google Scholar]
  • S.S. Sana, An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201 (2010) 158–170. [Google Scholar]
  • B. Sarkar, S.S. Sana and K. Chaudhuri, Optimal reliability, production lot size and safety stock in an imperfect production system. Int. J. Math. Oper. Res. 2 (2010) 467–490. [CrossRef] [Google Scholar]
  • B. Sarkar, S.S. Sana and K. Chaudhuri, An economic production quantity model with stochastic demand in an imperfect production system. Int. J. Serv. Oper. Manage. 9 (2011) 259–283. [Google Scholar]
  • O. Dey and B.C. Giri, Optimal vendor investment for reducing defect rate in a vendor–buyer integrated system with imperfect production process. Int. J. Prod. Econ. 155 (2014) 222–228. [Google Scholar]
  • R.R. Inman, S. Bhaskaran and D.E. Blumenfeld, In-plant material buffer sizes for pull system and level-material-shipping environments in the automotive industry. Int. J. Prod. Res. 35 (1997) 1213–1228. [Google Scholar]
  • V.S. Kouikoglou and Y.A. Phillis, A continuous-flow model for production networks with finite buffers, unreliable machines, and multiple products. Int. J. Prod. Res. 35 (1997) 381–397. [Google Scholar]
  • Y. Dallery, An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. Int. J. Prod. Res. 37 (1999) 1093–1117. [Google Scholar]
  • E. Enginarlar, J. Li, S.M. Meerkov and R.Q. Zhang, Buffer capacity for accommodating machine downtime in serial production lines. Int. J. Prod. Res. 40 (2002) 601–624. [Google Scholar]
  • J. Miltenburg, The effect of breakdowns on U-shaped production lines. Int. J. Prod. Res. 38 (2000) 353–364. [Google Scholar]
  • M.K. Salameh and R.E. Ghattas, Optimal just-in-time buffer inventory for regular preventive maintenance. Int. J. Prod. Econ. 74 (2001) 157–161. [Google Scholar]
  • R.I. Zequeira, B. Prida and J.E. Valdés, Optimal buffer inventory and preventive maintenance for an imperfect production process. Int. J. Prod. Res. 42 (2004) 959–974. [Google Scholar]
  • T. Chakraborty and B.C. Giri, Lot sizing in a deteriorating production system under inspections, imperfect maintenance and reworks. Oper. Res. 14 (2014) 29–50. [Google Scholar]
  • S.S. Sana and K. Chaudhuri, An EMQ model in an imperfect production process. Int. J. Syst. Sci. 41 (2010) 635–646. [Google Scholar]
  • S.S. Sana, Preventive maintenance and optimal buffer inventory for products sold with warranty in an imperfect production system. Int. J. Prod. Res. 50 (2012) 6763–6774. [Google Scholar]
  • T. Nakagawa, A summary of imperfect preventive maintenance policies with minimal repair. RAIRO-Oper. Res. 14 (1980) 249–255. [CrossRef] [EDP Sciences] [Google Scholar]
  • C. Jiao and X. Zhu, Optimal design of sales and maintenance under the renewable warranty. RAIRO-Oper. Res. 52 (2018) 529–542. [CrossRef] [EDP Sciences] [Google Scholar]
  • G.Q. Cheng, B.H. Zhou and L. Li, Integrated production, quality control and condition-based maintenance for imperfect production systems. Reliab. Eng. Syst. Saf. 175 (2018) 251–264. [CrossRef] [Google Scholar]
  • S.K. Goyal, An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 15 (1977) 107–111. [Google Scholar]
  • A. Banerjee, A joint economic lot size model for purchaser and vendor. Decis. Sci. 17 (1986) 292–311. [CrossRef] [Google Scholar]
  • S.K. Goyal, “A joint economic lot size model for purchaser and vendor”: a comment. Decis. Sci. 19 (1988) 236–241. [CrossRef] [Google Scholar]
  • S.K. Goyal and Y.P. Gupta, Integrated inventory models: the buyer–vendor coordination. Eur. J. Oper. Res. 41 (1989) 261–269. [Google Scholar]
  • S.K. Goyal and F. Nebebe, Determination of economic production–shipment policy for a single-vendor-single-buyer system. Eur. J. Oper. Res. 121 (2000) 175–178. [Google Scholar]
  • S.K. Goyal, A one-vendor multi-buyer integrated inventory model: a comment’.’. Eur. J. Oper. Res. 82 (1995) 209–210. [Google Scholar]
  • R.M. Hill, The single-vendor single-buyer integrated production-inventory model with a generalised policy. Eur. J. Oper. Res. 97 (1997) 493–499. [Google Scholar]
  • K.S. Wu and L.Y. Ouyang, An integrated single-vendor single-buyer inventory system with shortage derived algebraically. Prod. Plan. Control 14 (2003) 555–561. [CrossRef] [Google Scholar]
  • A. Banerjee, A joint economic-lot-size model for purchaser and vendor. Decis. Sci. 17 (1986) 292–311. [CrossRef] [Google Scholar]
  • A. Banerjee and S.L. Kim, An integrated JIT inventory model. Int. J. Oper. Prod. Manage. 15 (1995) 237–244. [CrossRef] [Google Scholar]
  • K.J. Chung, An improvement of an integrated single-vendor single-buyer inventory model with shortage. Prod. Plan. Control 19 (2008) 275–277. [CrossRef] [Google Scholar]
  • J.T. Hsu and L.F. Hsu, An integrated vendor–buyer cooperative inventory model in an imperfect production process with shortage backordering. Int. J. Prod. Adv. Manuf. Technol. 65 (2013) 493–505. [CrossRef] [Google Scholar]
  • H.M. Wee and G.A. Widyadana, Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales. Int. J. Prod. Econ. 143 (2013) 574–579. [Google Scholar]
  • G. Treviño-Garza, K.K. Castillo-Villar and L.E. Cárdenas-Barrón, Joint determination of the lot size and number of shipments for a family of integrated vendor–buyer systems considering defective products. Int. J. Syst. Sci. 46 (2015) 1705–1716. [Google Scholar]
  • A.H. Nobil, L.E. Cárdenas-Barrón and E. Nobil, Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage. RAIRO-Oper. Res. 52 (2018) 755–778. [CrossRef] [EDP Sciences] [Google Scholar]
  • D.J. Mohanty, R.S. Kumar and A. Goswami, Vendor-buyer integrated production-inventory system for imperfect quality item under trade credit finance and variable setup cost. RAIRO-Oper. Res. 52 (2018) 1277–1293. [CrossRef] [EDP Sciences] [Google Scholar]
  • M.M. Sher, S.L. Kim, A. Banerjee and M.T. Paz, A supply chain coordination mechanism for common items subject to failure in the electronics, defense, and medical industries. Int. J. Prod. Econ. 203 (2018) 164–173. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.