Free Access
Issue
RAIRO-Oper. Res.
Volume 54, Number 4, July-Août 2020
Page(s) 1103 - 1117
DOI https://doi.org/10.1051/ro/2019015
Published online 20 May 2020
  • S. Benjaafar, Y. Li and M. Daskin, Carbon foot print and the management of supply chains: Insights from simple models. IEEE Trans. Auto. Sci. Eng. 10 (2013) 99–116. [Google Scholar]
  • L.E. Cárdenas-Barrón, On optimal batch sizing in a multistage production system with rework consideration. Eur. J. Oper. Res. 196 (2009) 1238–1244. [Google Scholar]
  • S.D.P. Flappera and R.H. Teunterb, Logistic planning of rework with deteriorating work-in-process. Int. J. Prod. Econ. 88 (2004) 51–59. [Google Scholar]
  • P.K. Ghosh, A.K. Manna and J.K. Dey, Deteriorating manufacturing system with selling price discount under random machine breakdown. Int. J. Comput. Eng. Manage. 20 (2017) 8–17. [Google Scholar]
  • S.K. Goyal and L.E. Cárdenas-Barrón, Note on: Economic production quantity model for items with imperfect quality- a practical approach. Int. J. Prod. Econ. 77 (2002) 85–87. [Google Scholar]
  • S.K. Goyal and L.E. Cárdenas-Barrón, Economic production quantity with imperfect production system. Ind. Eng. J. 34 (2005) 33–36. [Google Scholar]
  • R. Hammami, I. Nouira and Y. Frein, Carbon emissions in a multi-echelon production-inventory model with lead time constraints. Int. J. Prod. Econ. 164 (2014) 292–307. [Google Scholar]
  • F.W. Harris, How many parts to make at once factory. Mag. Manage. 10 (1913) 135–136. [Google Scholar]
  • I. Harris, M. Naim, A. Palmer, A. Potter and C. Mumford, Assessing the impact of cost optimization based on infrastructure modelling on CO2 emissions. Int. J. Prod. Econ. 131 (2011) 313–321. [Google Scholar]
  • G. Hua, T.C.E. Cheng and S. Wang, Managing carbon foot prints in inventory management. Int. J. Prod. Econ. 132 (2011) 178–185. [Google Scholar]
  • P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Prod. Plann. Control 12 (2001) 584–590. [Google Scholar]
  • K. Inderfurth, M.Y. Kovalyov, C.T. Ng and F. Werner, Cost minimizing scheduling of work and rework processes on a single facility under deterioration of reworkables. Int. J. Prod. Econ. 105 (2007) 345–356. [Google Scholar]
  • S. Jain, S. Tiwari, L.E. Cárdenas-Barrón, A.A. Shaikh and S.R. Singh, A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions. RAIRO: OR 52 (2018) 217–239. [Google Scholar]
  • M. Khan, M. Hussain and L.E. Cardenas-Barron, Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands. Int. J. Prod. Res. 55 (2017) 4816–4832. [Google Scholar]
  • G.L. Liao, Optimal economic production quantity policy for a parallel system with repair, rework, free-repair warranty and maintenance. Int. J. Prod. Res. 54 (2016) 6265–6280. [Google Scholar]
  • R. Li, Y.-L. Chan, C.-T. Chang and L.E. Cardenas-Barron, Pricing and lot-sizing policies for perishable products with advance-cash-credit payments by a discounted cash-flow analysis. Int. J. Prod. Econ. 193 (2017) 578–589. [Google Scholar]
  • R. Mallick, A.K. Manna and S.K. Mondal, A supply chain model for imperfect production system with stochastic lead time demand. J. Manage. Anal. 5 (2018) 309–333. [Google Scholar]
  • A.K. Manna, B. Das, J.K. Dey and S.K. Mondal, An EPQ model with promotional demand in random planning horizon: population varying genetic algorithm approach. J. Intell. Manuf. 27 (2016) 1–19. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput. Ind. Eng. 104 (2017) 9–22. [Google Scholar]
  • A.K. Manna, B. Das, J.K. Dey and S.K. Mondal, Two layers green supply chain imperfect productioninventory model under bi-level credit period. TÉKHNE – Rev. Appl. Manage. Stud. 15 (2017) 124–142. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Two layers supply chain in an imperfect production inventory model with two storage facilities under reliability consideration. J. Ind. Prod. Eng. 35 (2018) 57–73. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Controlling GHG emission from industrial waste perusal of production inventory model with fuzzy pollution parameters. Int. J. Syst. Sci. Oper. Logist. 6 (2019) 368–393. [Google Scholar]
  • A.H. Nobil, S. Tiwari and F. Tajik, Economic production quantity model considering warm-up period in a cleaner production environment. Int. J. Prod. Res. 57 (2016) 4547–4560. [Google Scholar]
  • T. Penkuhn, T. Spengler, H. Puchert and O. Rentz, Environmental integrated production planning for ammonia synthesis. Eur. J. Oper. Res. 97 (1997) 327–336. [Google Scholar]
  • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production process. IIE Trans. 18 (1986) 48–55. [Google Scholar]
  • M.K. Salameh and M.Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. [Google Scholar]
  • S.S. Sana, A production-inventory model in an imperfect production process. Eur. J. Oper. Res. 200 (2010) 451–464. [Google Scholar]
  • S.S. Sana, An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201 (2010) 158–170. [Google Scholar]
  • B. Sarkar, An inventory model with reliability in an imperfect production process. Appl. Math. Comput. 218 (2012) 4881–4891. [Google Scholar]
  • B. Sarkar, B.K. Sett and S. Sarkar, Optimal production run time and inspection errors in an imperfect production system with warranty. J. Ind. Manage. Opt. 14 (2018) 267–282. [Google Scholar]
  • B.K. Sett, S. Sarkar, B. Sarkar, Optimal buffer inventory and inspection errors in an imperfect production system with preventive maintenance. Int. J. Adv. Manuf. Technol. 90 (2017) 1–16. [Google Scholar]
  • A.A. Taleizadeh, D.W. Pentico, M.S. Jabalameli and M. Aryanezhad, An economic order quantity model with multiple partial prepayments and partial backordering, Math. Comput. Model. 57 (2013) 311–323. [Google Scholar]
  • A.A. Taleizadeh, An economic order quantity model for deteriorating items in a purchasing system with multiple prepayments. Appl. Math. Model. 38(23) (2014) 5357–5366. [Google Scholar]
  • J.T. Teng, L.E. Cárdenas-Barrón, H.J. Chang, J. Wu and Y. Hu, Inventory lot-size policies for deteriorating items with expiration dates and advance payments. Appl. Math. Model. 40 (2016) 8605–8616. [Google Scholar]
  • S. Tiwari, L.E. Cárdenas-Barrón, M. Goh and A.A. Shaikh, Joint pricing and inventory model for deteriorating items with expiration dates and partial backlogging under two-level partial trade credits in supply chain. Int. J. Prod. Econ. 200 (2018) 16–36. [Google Scholar]
  • C.C. Wu and N.B. Chang, Corporate optimal production planning with varying environmental costs: A grey compromise programming approach. Eur. J. Oper. Res. 155 (2004) 68–95. [Google Scholar]
  • A.X. Zhang, Optimal advance payment scheme involving fixed per-payment costs. Omega 24 (1996) 577–582. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.