Free Access
Issue
RAIRO-Oper. Res.
Volume 54, Number 4, July-August 2020
Page(s) 961 - 979
DOI https://doi.org/10.1051/ro/2019030
Published online 28 April 2020
  • P.L. Abad, Optimal pricing and lot sizing under conditions of perishability and partial backordering. Manage. Sci. 42 (1996) 1093–1104. [Google Scholar]
  • P.L. Abad, Optimal price and order size for a reseller under partial backordering. Comput. Oper. Res. 28 (2001) 53–65. [Google Scholar]
  • M. Ben-Daya and M. Hariga, Integrated single vendor single buyer model with stochastic demand and variable lead-time. Int. J. Prod. Econ. 92 (2004) 75–80. [Google Scholar]
  • S. Bose, S.B. Goswami and K.S. Chaudhuri, An EOQ model for deteriorating items with linear time-dependent demand rate and shortages under inflation and time discounting. J. Oper. Res. Soc. 46 (1995) 771–782. [Google Scholar]
  • M. Braglia, D. Castellano and D. Song, Distribution-free approach for stochastic Joint-Replenishment Problem with backorders-lost sales mixtures, and controllable major ordering cost and lead times. Comput. Oper. Res. 79 (2017) 161–173. [Google Scholar]
  • H. Chao, The EOQ model with stochastic demand and discounting. Eur. J. Oper. Res. 59 (1992) 434–443. [Google Scholar]
  • K. Das, Integrating lean systems in the design of a sustainable supply chain model. Int. J. Prod. Econ. 198 (2018) 177–190. [Google Scholar]
  • C.H. Glock, Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int. J. Prod. Econ. 136 (2012) 37–44. [Google Scholar]
  • M.A. Hariga, Effects of inflation and time-value of money on an inventory model with time-dependent demand rate and shortages. Eur. J. Oper. Res. 81 (1995) 512–520. [Google Scholar]
  • M.A. Hariga, A stochastic inventory model with lead time and lot size interaction. Prod. Plan. Control 10 (1999) 434–438. [CrossRef] [Google Scholar]
  • M. Hasan, M. Zhang, W. Wu and T. Langrish, Discounted cash flow analysis of greenhouse-type solar kilns. Renew. Energy 95 (2016) 404–412. [Google Scholar]
  • J. Heydari, P. Zaabi-Ahmadi and T.M. Choi, Coordinating supply chains with stochastic demand by crashing lead times. Comput. Oper. Res. 100 (2018) 394–403. [Google Scholar]
  • W.T. Ho and Y.C. Hsiao, Single supplier single retailer inventory model controlled by the reorder and shipping points with sharing information. Int. J. Syst. Sci. 43 (2012) 673–681. [Google Scholar]
  • S.J. Hossain, M.M. Ohaiba and B.R. Sarker, An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness. Int. J. Prod. Econ. 188 (2017) 50–62. [Google Scholar]
  • Y.C. Hsiao, A note on integrated single vendor single buyer model with stochastic demand and variable lead time. Int. J. Prod. Econ. 114 (2008) 294–297. [Google Scholar]
  • M. Khan, M. Hussain and L.E. Cárdenas-Barrón, Learning and screening errors in an EPQ inventory model for supply chains with stochastic lead time demands. Int. J. Prod. Res. 55 (2017) 4816–4832. [Google Scholar]
  • J.S. Kim and W.C. Benton, Lot size dependent lead times in a Q, R inventory system. Int. J. Prod. Econ. 33 (1995) 41–58. [Google Scholar]
  • J.S. Kim, B. Sarkar and S. Sarkar, An inventory model with backorder price discount and stochastic lead time. DJ J. Eng. Appl. Math. 4 (2018) 34–48. [CrossRef] [Google Scholar]
  • T. Klammer, B. Koch and W. Wilner, Capital budgeting practices-A survey of corporate use. J. Manage. Acc. Res. 113 (1991) 30. [Google Scholar]
  • M.G. Kumar and R. Uthayakumar, Multi-item inventory model with variable backorder and price discount under trade credit policy in stochastic demand. Int. J. Prod. Res. 57 (2019) 298–320. [Google Scholar]
  • W.C. Lee, Inventory model involving controllable backorder rate and variable lead time demand with the mixtures of distribution, Appl. Math. Comput. 160 (2005) 701–717. [Google Scholar]
  • W.C. Lee, J.W. Wu and J.W. Hsu, Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate, Appl. Math. Comput. 175 (2006) 1125–1138. [MathSciNet] [Google Scholar]
  • Y. Li, X. Xu and F. Ye, Supply chain coordination model with controllable lead time and service level constraint. Comput. Ind. Eng. 61 (2011) 858–864. [Google Scholar]
  • R. Li, Y.L. Chan, C.T. Chang and L.E. Cárdenas-Barrón, Pricing and lot-sizing policies for perishable products with advance-cash-credit payments by a discounted cash-flow analysis. Int. J. Prod. Econ. 193 (2017) 578–589. [Google Scholar]
  • C.J. Liao and C.H. Shyu, An analytical determination of lead time with normal demand. Int. J. Oper Prod. Manage. 11 (1991) 72–78. [CrossRef] [Google Scholar]
  • Y.J. Lin, An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Comput. Ind. Eng. 56 (2009) 1597–1606. [Google Scholar]
  • P. Mandal and B.C. Giri, A single-vendor multi-buyer integrated model with controllable lead time and quality improvement through reduction in defective items. Int. J. Syst. Sci. Oper. Logist. 2 (2015) 1–14. [Google Scholar]
  • M. Mondal, A.K. Maity, M.M. Maiti and M. Maiti, A production-repairing inventory model with fuzzy rough coefficients under inflation and time value of money. Appl. Math. Model. 37 (2013) 3200–3215. [Google Scholar]
  • I.K. Moon and W. Yun, An economic order quantity model with a random planning horizon. Eng. Econ. 39 (1993) 77–86. [Google Scholar]
  • I.K. Moon and B.C. Cha, A continuous review inventory model with the controllable production rate of the manufacturer. Int. Trans. Oper. Res. 12 (2005) 247–258. [Google Scholar]
  • I. Moon and S. Choi, A note on lead time and distribution assumptions in continuous reviews inventory models. Comput. Oper. Res. 25 (1998) 1007–1012. [Google Scholar]
  • Q. Mou, Y. Cheng and H. Liao, A note on “lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand”. Int. J. Prod. Econ. 193 (2017) 827–831. [Google Scholar]
  • L.Y. Ouyang and K.S. Wu, Mixture inventory model involving variable lead time with a service level constraint. Comput. Oper. Res. 24 (1997) 875–882. [Google Scholar]
  • L.Y. Ouyang and B.R. Chuang, Mixture inventory model involving variable lead time and controllable lead time. Comput. Ind. Eng. 40 (2001) 339–348. [Google Scholar]
  • L.Y. Ouyang and H. Chang, Lot size reorder point inventory model with controllable lead time and set-up cost. Int. J. Syst. Sci. 33 (2002) 635–642. [Google Scholar]
  • L.Y. Ouyang, K.S. Wu and C.H. Ho, An integrated inventory model with quality improvement and lead time reduction. Int. J. Prod. Econ. 108 (2007) 349–358. [Google Scholar]
  • C.H. Pan and Y.C. Hsiao, Inventory models with back-order discounts and variable lead time. Int. J. Syst. Sci. 32 (2001) 925–929. [Google Scholar]
  • J.C.H. Pan and J.S. Yang, A study of an integrated inventory with controllable lead time. Int. J. Prod. Res. 40 (2002) 1263–1273. [Google Scholar]
  • J.C.H. Pan, M.C. Lo and Y.C. Hsiao, Optimal reorder point inventory models with variable lead time and backorder discount considerations. Eur. J. Oper. Res. 158 (2004) 488–505. [Google Scholar]
  • B. Ponte, J. Costas, J. Puche, R. Pino and D. Fuente, The value of lead time reduction and stabilization: A comparison between traditional and collaborative supply chains. Trans. Res. Part E Logist. Trans. Rev. 111 (2018) 165–185. [CrossRef] [Google Scholar]
  • R.Z. Rad, J. Razmi, M.S. Sangari and Z.F. Ebrahimi, Optimizing an integrated vendor-managed inventory system for a single-vendor two-buyer supply chain with determining weighting factor for vendor’s ordering cost. Int. J. Prod. Econ. 153 (2014) 295–308. [Google Scholar]
  • M.S. Sajadieh and M.R.A. Jokar, An integrated vendor–buyer cooperative model under stochastic supply lead-time. Int. J. Manuf. Technol. 41 (2009) 1043–1050. [CrossRef] [Google Scholar]
  • S. Sarkar and B.C. Giri, A vendor–buyer integrated inventory system with variable lead time and uncertain market demand. Oper. Res. 20 (2020) 491–515. [Google Scholar]
  • B. Sarkar, B. Mandal and S. Sarkar, Quality improvement and backorder price discount under controllable lead time in an inventory model. J. Manuf. Syst. 35 (2015) 26–36. [Google Scholar]
  • B.K. Sett, S. Sarkar, B. Sarkar and W.Y. Yun, Optimal replenishment policy with variable deterioration for fixed lifetime products. Sci. Iran. E 23 (2017) 2318–2329. [Google Scholar]
  • E.A. Silver, D.F. Pyke and R. Peterson, Inventory Management and Production Planning and Scheduling. John Wiley, New York (1998). [Google Scholar]
  • A.A. Taleizadeha, S.T.A. Niaki and H.M. Wee, Joint single vendor–single buyer supply chain problem with stochastic demand and fuzzy lead-time. Knowledge-Based Syst. 48 (2013) 1–9. [CrossRef] [Google Scholar]
  • R.J. Tersine, Principles of Inventory and Materials Management. North Holland, New York (1982). [Google Scholar]
  • S. Tiwari, S.S. Sana and B. Sarkar, Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost. Rev. Real. Acad. Cien. Exact., F. Nat. Serie A. Mat. 112 (2018) 1075–1099. [CrossRef] [Google Scholar]
  • H.M. Wee and S.T. Law, Replenishment and pricing policy for deteriorating items taking into account the time-value of money. Int. J. Prod. Econ. 71 (2001) 213–220. [Google Scholar]
  • H.M. Wee and G. Widyadana, Single-vendor single-buyer inventory model with discrete delivery order, random machine unavailability time and lost sales. Int. J. Prod. Econ. 143 (2013) 574–579. [Google Scholar]
  • J.C.P. Yu, H.-M. Wee, G.A. Widyadana and J.-Y. Chang, The effects of inflation and time value of money on a production model with a random product life cycle. Asia Pac. J. Oper. Res. 27 (2010) 437–456. [CrossRef] [Google Scholar]
  • X. Zhou, L.P. Shi and B.Z. Huang, Integrated inventory model with stochastic lead time and controllable variability for milk runs. J. Ind. Manage. Optim. 8 (2012) 657–672. [CrossRef] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.