Free Access
Issue
RAIRO-Oper. Res.
Volume 54, Number 4, July-August 2020
Page(s) 1189 - 1213
DOI https://doi.org/10.1051/ro/2019054
Published online 12 June 2020
  • L.E. Cárdenas-Barrón, On optimal batch sizing in a multistage production system with rework consideration. Eur. J. Oper. Res. 196 (2009) 1238–1244. [Google Scholar]
  • S.W. Chiu, C.K. Ting and Y.S. Chiu, Optimal production lot sizing with rework, scrap rate, and service level constraint. Math. Comput. Model. 46 (2007) 535–549. [Google Scholar]
  • C.J. Chung, Investigating imperfect process and demand effects on inspection scheduling and supply chain replenishment policy. Comput. Ind. Eng. 64 (2013) 31–44. [Google Scholar]
  • M.A. Darwish and M. Ben-Daya, Effect of inspection errors and preventive maintenance on a two-stage production inventory system. Int. J. Prod. Econ. 107 (2013) 301–313. [Google Scholar]
  • S.O. Duffuaa and M. Khan, Impact of inspection errors on the performance measures of a general repeat inspection plan. Int. J. Prod. Res. 43 (2005) 4945–4967. [Google Scholar]
  • S.D.P. Flappera and R.H. Teunterb, Logistic planning of rework with deteriorating work-in-process. Int. J. Prod. Econ. 88 (2004) 51–59. [Google Scholar]
  • P.K. Ghosh, A.K. Manna and J.K. Dey, Deteriorating manufacturing system with selling price discount under random machine breakdown. Int. J. Comput. Eng. Manage. 20 (2017) 8–17. [Google Scholar]
  • P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Prod. Planning Control. 12 (2001) 584–590. [CrossRef] [Google Scholar]
  • J.-T. Hsu and L.-F. Hsu, An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns. Int. J. Prod. Econ. 143 (2013) 162–170. [Google Scholar]
  • C.K. Jaggi, S. Tiwari and A. Shafi, Effect of deterioration on two-warehouse inventory model with imperfect quality. Comput. Ind. Eng. 88 (2015) 378–385. [Google Scholar]
  • C.K. Jaggi, S. Tiwari and S.K. Goel, Credit financing in economic ordering policies for non-instantaneous deteriorating items with price dependent demand and two storage facilities. Ann. Oper. Res. 248 (2017) 253–280. [Google Scholar]
  • S. Jain, S. Tiwari, L.E. Cárdenas-Barrón, A.A. Shaikh and S.R. Singh, A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions. RAIRO: OR 52 (2018) 217–239. [CrossRef] [Google Scholar]
  • R. Mallick, A.K. Manna and S.K. Mondal, A Supply chain model for imperfect production system with stochastic lead time demand. J. Manage. Anal. 5 (2018) 309–333. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput. Ind. Eng. 104 (2017) 9–22. [Google Scholar]
  • A.K. Manna, B. Das, J.K. Dey and S.K. Mondal, Two layers green supply chain imperfect production inventory model under bi-level credit period. TÉKHNE – Rev. Appl. Manage. Stud. 15 (2017) 124–142. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Controlling GHG emission from industrial waste perusal of production inventory model with fuzzy pollution parameters. Int. J. Syst. Sci.: Oper. Logistics 6 (2019) 368–393. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Two layers supply chain in an imperfect production inventory model with two storage facilities under reliability consideration. J. Ind. Prod. Eng. 35 (2018) 57–73. [Google Scholar]
  • A.H. Nobil, A.H. Afshar Sedigh, S. Tiwari and H.M. Wee, An imperfect multi-item single machine production system with shortage, rework, and scrapped considering inspection, dissimilar deficiency levels, and non-zero setup times. Sci. Iran. 26 (2019) 557–570. [Google Scholar]
  • S. Panja and S.K. Mondal, Analyzing a four-layer green supply chain imperfect production inventory model for green products under type-2 fuzzy credit period. Comput. Ind. Eng. 129 (2019) 435–453. [Google Scholar]
  • E.L. Porteus, Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. [Google Scholar]
  • A. Raouf, J.K. Jain and P.T. Sathe, A cost-minimization model for multi characteristic component inspection. IIE Trans. 15 (1983) 187–194. [Google Scholar]
  • T. Raz and D. Bricker, Sequencing of inspection operations subject to errors. Eur. J. Oper. Res. 68 (1993) 251–264. [Google Scholar]
  • A.H. Rentoul, G. Mullineux and A.J. Medland, Interpretation of errors from inspection results. Comput. Integr. Manuf. Syst. 7 (1994) 173–178. [CrossRef] [Google Scholar]
  • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production process. IIE Trans. 18 (1986) 48–55. [Google Scholar]
  • M.K. Salameh and M.Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. [Google Scholar]
  • S.S. Sana, An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201 (2010) 158–170. [Google Scholar]
  • B. Sarkar, B.K. Sett and S. Sarkar, Optimal production run time and inspection errors in an imperfect production system with warranty. J. Ind. Manage. Optim. 14 (2018) 267–282. [Google Scholar]
  • S. Tiwari, L.E. Cárdenas-Barrón, A. Khanna and C.K. Jaggi, Impact of trade credit and inflation on retailer’s ordering policies for non-instantaneous deteriorating items in a two-warehouse environment. Int. J. Prod. Econ. 176 (2016) 154–169. [Google Scholar]
  • S. Tiwari, C.K. Jaggi, A.K. Bhunia, A.A. Shaikh and M. Goh, Two-warehouse inventory model for non-instantaneous deteriorating items with stock-dependent demand and inflation using particle swarm optimization. Ann. Oper. Res. 254 (2017) 401–423. [Google Scholar]
  • S. Tiwari, H.M. Wee and S. Sarkar, Lot-sizing policies for defective and deteriorating items with time-dependent demand and trade credit. Eur. J. Ind. Eng. 11 (2017) 683–703. [CrossRef] [Google Scholar]
  • S. Tiwari, C.K. Jaggi, M. Gupta and L.E. Cárdenas-Barrón, Optimal pricing and lot-sizing policy for supply chain system with deteriorating items under limited storage capacity. Int. J. Prod. Econ. 200 (2018) 278–290. [Google Scholar]
  • S. Tiwari, L.E. Cárdenas-Barrón, M. Goh and A.A. Shaikh, Joint pricing and inventory model for deteriorating items with expiration dates and partial backlogging under two-level partial trade credits in supply chain. Int. J. Prod. Econ. 200 (2018) 16–36. [Google Scholar]
  • S. Tiwari, Y. Daryanto and H.M. Wee, Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission. J. Cleaner Prod. 192 (2018) 281–292. [CrossRef] [Google Scholar]
  • S. Tiwari, W. Ahmed and B. Sarkar, Multi-item sustainable green production system under trade-credit and partial backordering. J. Cleaner Prod. 204 (2018) 82–95. [CrossRef] [Google Scholar]
  • C.H. Wang and S.H. Sheu, Optimal lot size for products under free-repair warranty. Eur. J. Oper. Res. 149 (2003) 131–141. [Google Scholar]
  • C.H. Wang and S.H. Sheu, Determining the optimal production-maintenance policy with inspection errors: using Markovchain. Comput. Oper. Res. 30 (2003) 1–17. [Google Scholar]
  • R.H. Yeh, W.T. Ho and S.T. Teng, Optimal production run length for products sold with warranty. Eur. J. Oper. Res. 120 (2005) 575–582. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.