Free Access
Issue
RAIRO-Oper. Res.
Volume 54, Number 5, September-October 2020
Page(s) 1495 - 1514
DOI https://doi.org/10.1051/ro/2019056
Published online 23 July 2020
  • M. Ben-Daya and M. Hariga, Economic lot scheduling problem with imperfect production processes. J. Oper. Res. Soc. 51 (2000) 875–881. [Google Scholar]
  • Y.P. Chiu, Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging. Eng. Optimiz. 35 (2003) 427–437. [Google Scholar]
  • S.W. Chiu, S.L. Wang and Y.S.P. Chiu, Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns. Eur. J. Oper. Res. 180 (2007) 664–676. [Google Scholar]
  • M. De, B. Das and M. Maiti, Quality and pricing decisions for substitutable items under imperfect production process over a random planning horizon. Hacet. J. Math. Stat. 47 (2018) 175–201. [Google Scholar]
  • S. Eilon, Scheduling for batch production. J. Inst. Prod. Eng. 36 (1957) 549–570. [Google Scholar]
  • S.E. Elmaghraby, The economic lot scheduling problem (ELSP): review and extensions. Manage. Sci. 24 (1978) 587–598. [Google Scholar]
  • B.C. Giri, I. Moon and W.Y. Yun, Scheduling economic lot sizes in deteriorating production systems. Nav. Res. Log. 50 (2003) 650–661. [Google Scholar]
  • R. Haji and B. Haji, Optimal batch production for a single machine system with accumulated defectives and random rate of rework. J. Ind. Syst. Eng. 3 (2010) 243–256. [Google Scholar]
  • R. Haji, A. Haji, M. Sajadifar and S. Zolfaghari, Lot sizing with non-zero setup times for rework. J. Syst. Sci. Syst. Eng. 17 (2008) 230–240. [Google Scholar]
  • K. Inderfurth, G. Lindner and N.P. Rachaniotis, Lot sizing in a production system with rework and product deterioration. Int. J. Prod. Res. 43 (2005) 1355–1374. [Google Scholar]
  • K.N.F. Leung, Optimal production lot sizing with backlogging, random defective rate, and rework derived without derivatives. Proc. Inst. Mech. Eng. Part B: J. Eng. Manuf. 223 (2009) 1081–1084. [Google Scholar]
  • A.K. Manna, B. Das, J.K. Dey and S.K. Mondal, Two layers green supply chain imperfect production inventory model under bi-level credit period. Tékhne 15 (2017) 124–142. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput. Ind. Eng. 104 (2017) 9–22. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Two layers supply chain in an imperfect production inventory model with two storage facilities under reliability consideration. J. Ind. Prod. Eng. 35 (2018) 57–73. [Google Scholar]
  • A.K. Manna, B. Das and S. Tiwari, Impact of carbon emission on imperfect production inventory system with advance payment base free transportation. RAIRO-Oper. Res. (2019). DOI: 10.1051/ro/2019015. [Google Scholar]
  • I. Moon, B.C. Giri and K. Choi, Economic lot scheduling problem with imperfect production processes and setup times. J. Oper. Res. Soc. 53 (2002) 620–629. [Google Scholar]
  • A.H. Nobil, E. Nobil and L.E. Cárdenas-Barrón, Some observations to: lot sizing with non-zero setup times for rework. Int. J. Appl. Comput. Math. 3 (2017) 1511–1517. [Google Scholar]
  • A.H. Nobil, A.H.A. Sedigh and L.E. Cárdenas-Barrón, A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints. Ann. Oper. Res. (2017) 1–37. [Google Scholar]
  • A.H. Nobil, A.H. Afshar Sedigh, S. Tiwari and H.M. Wee, An imperfect multi-item single machine production system with shortage, rework, and scrapped considering inspection, dissimilar deficiency levels, and non-zero setup times. Sci. Iran. 26 (2019) 557–570. [Google Scholar]
  • A.H. Nobil, S. Tiwari and F. Tajik, Economic production quantity model considering warm-up period in a cleaner production environment. Int. J. Prod. Res. 57 (2019) 4547–4560. [Google Scholar]
  • M. Parveen and T.V.V.L.N. Rao, Optimal cycle length and number of inspections in imperfect production processes with investment on setup cost reduction and quality improvement. Int. J. Manuf. Res. 4 (2009) 17–36. [Google Scholar]
  • S.H.R. Pasandideh, S.T.A. Niaki, A.H. Nobil and L.E. Cárdenas-Barrón, A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost. Int. J. Prod. Econ. 169 (2015) 203–214. [Google Scholar]
  • J. Quenniche and F. Boctor, Sequencing, lot sizing and scheduling of several products in job shops: the common cycle approach. Int. J. Prod. Res. 36 (1998) 1125–1140. [Google Scholar]
  • J. Rogers, A computational approach to the economic lot scheduling problem. Manage. Sci. 4 (1958) 264–291. [Google Scholar]
  • S. Shafiee-Gol, M.M. Nasiri and A.A. Taleizadeh, Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework. Opsearch 53 (2016) 873–888. [Google Scholar]
  • E.W. Taft, The most economical production lot. Iron Age 101 (1918) 1410–1412. [Google Scholar]
  • A.A. Taleizadeh and H.M. Wee, Manufacturing system with immediate rework and partial backordering. Int. J. Adv. Oper. Manage. 7 (2015) 41–62. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.