The Citing articles tool gives a list of articles citing the current article. The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program . You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).
Cited article:
C. L. Monma , A. H. G. Rinnooy Kan
RAIRO-Oper. Res., 17 2 (1983) 105-119
Published online: 2017-02-06
This article has been cited by the following article(s):
43 articles
Operations Research Proceedings 2019
Kathrin Maassen and Paz Perez-Gonzalez Operations Research Proceedings, Operations Research Proceedings 2019 555 (2020) https://doi.org/10.1007/978-3-030-48439-2_67
Applications of max-plus algebra to flow shop scheduling problems
Susumu Kubo and Katsuhiro Nishinari Discrete Applied Mathematics 247 278 (2018) https://doi.org/10.1016/j.dam.2018.03.045
283 (2018) https://doi.org/10.1002/9781119262602.ch10
Reduction of permutation flowshop problems to single machine problems using machine dominance relations
Victor Fernandez-Viagas and Jose M. Framinan Computers & Operations Research 77 96 (2017) https://doi.org/10.1016/j.cor.2016.07.009
Scheduling
Michael L. Pinedo Scheduling 151 (2016) https://doi.org/10.1007/978-3-319-26580-3_6
Solution algorithms for synchronous flow shop problems with two dominating machines
Matthias Kampmeyer, Sigrid Knust and Stefan Waldherr Computers & Operations Research 74 42 (2016) https://doi.org/10.1016/j.cor.2016.04.010
A combination of flow shop scheduling and the shortest path problem
Kameng Nip, Zhenbo Wang, Fabrice Talla Nobibon and Roel Leus Journal of Combinatorial Optimization 29 (1) 36 (2015) https://doi.org/10.1007/s10878-013-9670-4
Victor Fernandez-Viagas and Jose M. Framinan 899 (2015) https://doi.org/10.1109/IESM.2015.7380262
Review of the ordered and proportionate flow shop scheduling research
S.S. Panwalkar, Milton L. Smith and Christos Koulamas Naval Research Logistics (NRL) 60 (1) 46 (2013) https://doi.org/10.1002/nav.21518
Flow Shop Scheduling
Hamilton Emmons and George Vairaktarakis International Series in Operations Research & Management Science, Flow Shop Scheduling 182 97 (2013) https://doi.org/10.1007/978-1-4614-5152-5_4
Flow shop makespan minimization scheduling with deteriorating jobs under dominating machines
Lin-Hui Sun, Lin-Yan Sun, Ming-Zheng Wang and Ji-Bo Wang International Journal of Production Economics 138 (1) 195 (2012) https://doi.org/10.1016/j.ijpe.2012.03.023
Computational Intelligence in Flow Shop and Job Shop Scheduling
E. Mokotoff Studies in Computational Intelligence, Computational Intelligence in Flow Shop and Job Shop Scheduling 230 101 (2009) https://doi.org/10.1007/978-3-642-02836-6_4
225 (2009) https://doi.org/10.1002/9780470451793.ch10
Fifty years of scheduling: a survey of milestones
C N Potts and V A Strusevich Journal of the Operational Research Society 60 (sup1) S41 (2009) https://doi.org/10.1057/jors.2009.2
Handbook on Scheduling
International Handbook on Information Systems, Handbook on Scheduling 271 (2007) https://doi.org/10.1007/978-3-540-32220-7_8
On no-wait and no-idle flow shops with makespan criterion
Pawel Jan Kalczynski and Jerzy Kamburowski European Journal of Operational Research 178 (3) 677 (2007) https://doi.org/10.1016/j.ejor.2006.01.036
Flow shop scheduling problems with decreasing linear deterioration under dominant machines
Ji-Bo Wang Computers & Operations Research 34 (7) 2043 (2007) https://doi.org/10.1016/j.cor.2005.08.008
Permutation flow shop scheduling with dominant machines to minimize discounted total weighted completion time
Ji-Bo Wang, Feng Shan, Bo Jiang and Li-Yan Wang Applied Mathematics and Computation 182 (1) 947 (2006) https://doi.org/10.1016/j.amc.2006.04.052
Flow shop scheduling problems with deteriorating jobs under dominating machines
J-B Wang and Z-Q Xia Journal of the Operational Research Society 57 (2) 220 (2006) https://doi.org/10.1057/palgrave.jors.2601959
Flow shop scheduling with deteriorating jobs under dominating machines
Ji-Bo Wang and Zun-Quan Xia Omega 34 (4) 327 (2006) https://doi.org/10.1016/j.omega.2004.10.006
Flow-shop scheduling with a learning effect
J-B Wang and Z-Q Xia Journal of the Operational Research Society 56 (11) 1325 (2005) https://doi.org/10.1057/palgrave.jors.2601856
No-wait or no-idle permutation flowshop scheduling with dominating machines
Ji-Bo Wang and Zun-Quan Xia Journal of Applied Mathematics and Computing 17 (1-2) 419 (2005) https://doi.org/10.1007/BF02936066
Nonpreemptive flowshop scheduling with machine dominance
Ondřej Čepek, Masanori Okada and Milan Vlach European Journal of Operational Research 139 (2) 245 (2002) https://doi.org/10.1016/S0377-2217(01)00356-3
Scheduling Computer and Manufacturing Processes
Jacek Błażewicz, Klaus H. Ecker, Erwin Pesch, Günter Schmidt and Jan Węglarz Scheduling Computer and Manufacturing Processes 247 (2001) https://doi.org/10.1007/978-3-662-04363-9_7
Mathematical Foundations of Computer Science 2001
Wolfgang Espelage and Egon Wanke Lecture Notes in Computer Science, Mathematical Foundations of Computer Science 2001 2136 363 (2001) https://doi.org/10.1007/3-540-44683-4_32
Non-bottleneck machines in three-machine flow shops
Jerzy Kamburowski Journal of Scheduling 3 (4) 209 (2000) https://doi.org/10.1002/1099-1425(200007/08)3:4<209::AID-JOS43>3.0.CO;2-W
On three-machine flow shops with random job processing times
Jerzy Kamburowski European Journal of Operational Research 125 (2) 440 (2000) https://doi.org/10.1016/S0377-2217(99)00222-2
Solvable cases of permutation flowshop scheduling with dominating machines
S. Xiang, G. Tang and T.C.E. Cheng International Journal of Production Economics 66 (1) 53 (2000) https://doi.org/10.1016/S0925-5273(99)00106-1
Structural Properties of Lot Streaming in a Flow Shop
C. A. Glass and C. N. Potts Mathematics of Operations Research 23 (3) 624 (1998) https://doi.org/10.1287/moor.23.3.624
Open shop scheduling with maximal machines
George J. Kyparisis and Christos Koulamas Discrete Applied Mathematics 78 (1-3) 175 (1997) https://doi.org/10.1016/S0166-218X(97)00018-8
Flow-line scheduling problem with controllable processing times
SELCUK KARABATI and PANAGIOTIS KOUVELIS IIE Transactions 29 (1) 1 (1997) https://doi.org/10.1080/07408179708966307
Scheduling Computer and Manufacturing Processes
Jacek Błażewicz, Klaus H. Ecker, Erwin Pesch, Günter Schmidt and Jan Węglarz Scheduling Computer and Manufacturing Processes 249 (1996) https://doi.org/10.1007/978-3-662-03217-6_7
The job shop scheduling problem: Conventional and new solution techniques
Jacek Błażewicz, Wolfgang Domschke and Erwin Pesch European Journal of Operational Research 93 (1) 1 (1996) https://doi.org/10.1016/0377-2217(95)00362-2
On the recognition of permuted bottleneck Monge matrices
Bettina Klinz, Rüdiger Rudolf and Gerhard J. Woeginger Discrete Applied Mathematics 63 (1) 43 (1995) https://doi.org/10.1016/0166-218X(94)00019-A
Lot streaming in the two-machine flow shop with setup times
Kenneth R. Baker Annals of Operations Research 57 (1) 1 (1995) https://doi.org/10.1007/BF02099687
P. Richard, N. Jacquet, C. Cavalier and C. Proust 1 59 (1995) https://doi.org/10.1109/ETFA.1995.496763
The interface of buffer design and cyclic scheduling decisions in deterministic flow lines
Selcuk Karabati and Panagiotis Kouvelis Annals of Operations Research 50 (1) 295 (1994) https://doi.org/10.1007/BF02085645
Les problèmes d'ordonnancement
Gotha RAIRO - Operations Research 27 (1) 77 (1993) https://doi.org/10.1051/ro/1993270100771
On the heuristic solution of the permutation flow shop problem by path algorithms
Frank Werner Computers & Operations Research 20 (7) 707 (1993) https://doi.org/10.1016/0305-0548(93)90058-Q
The permutation flow shop problem with sum-of-completion times performance criterion
Selcuk Karabati and Panagiotis Kouvelis Naval Research Logistics 40 (6) 843 (1993) https://doi.org/10.1002/1520-6750(199310)40:6<843::AID-NAV3220400608>3.0.CO;2-A
Logistics of Production and Inventory
Eugene L. Lawler, Jan Karel Lenstra, Alexander H.G. Rinnooy Kan and David B. Shmoys Handbooks in Operations Research and Management Science, Logistics of Production and Inventory 4 445 (1993) https://doi.org/10.1016/S0927-0507(05)80189-6
Open-shop scheduling problems with dominated machines
I. Adiri and N. Aizikowitz (Hefetz) Naval Research Logistics 36 (3) 273 (1989) https://doi.org/10.1002/nav.3220360305
Optimization 18 (5) 697 (1987) https://doi.org/10.1080/02331938708843282