The Citing articles tool gives a list of articles citing the current article. The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program . You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).
Cited article:
Grzegorz Waligóra
RAIRO-Oper. Res., 48 1 (2014) 1-24
Published online: 2013-12-05
This article has been cited by the following article(s):
17 articles
Selecting hybrids of metaheuristics for resource-constraint project scheduling problems with discounted cashflows
Tshewang Phuntsho and Tad Gonsalves Connection Science 37 (1) (2025) https://doi.org/10.1080/09540091.2024.2447365
Grzegorz Waligora 414 (2022) https://doi.org/10.1109/MMAR55195.2022.9874286
Multi-operator immune genetic algorithm for project scheduling with discounted cash flows
Md. Asadujjaman, Humyun Fuad Rahman, Ripon K. Chakrabortty and Michael J. Ryan Expert Systems with Applications 195 116589 (2022) https://doi.org/10.1016/j.eswa.2022.116589
Rafal Rozycki, Grzegorz Waligora and Tomasz Lemanski 275 (2021) https://doi.org/10.1109/MMAR49549.2021.9528448
An Immune Genetic Algorithm for Solving NPV-Based Resource Constrained Project Scheduling Problem
Md. Asadujjaman, Humyun Fuad Rahman, Ripon K. Chakrabortty and Michael J. Ryan IEEE Access 9 26177 (2021) https://doi.org/10.1109/ACCESS.2021.3057366
Handbook of Metaheuristics
Michel Gendreau and Jean-Yves Potvin International Series in Operations Research & Management Science, Handbook of Metaheuristics 272 37 (2019) https://doi.org/10.1007/978-3-319-91086-4_2
Robust resource-constrained max-NPV project scheduling with stochastic activity duration
Yangyang Liang, Nanfang Cui, Tian Wang and Erik Demeulemeester OR Spectrum 41 (1) 219 (2019) https://doi.org/10.1007/s00291-018-0533-3
Rafal Rozycki and Grzegorz Waligora 170 (2019) https://doi.org/10.1109/MMAR.2019.8864692
On a certain class of power- and energy-related scheduling problems
Rafał Różycki and Grzegorz Waligóra Discrete Applied Mathematics 264 167 (2019) https://doi.org/10.1016/j.dam.2018.10.014
Proactive and reactive resource-constrained max-NPV project scheduling with random activity duration
Weibo Zheng, Zhengwen He, Nengmin Wang and Tao Jia Journal of the Operational Research Society 69 (1) 115 (2018) https://doi.org/10.1057/s41274-017-0198-3
Rafal Rozycki and Grzegorz Waligora 943 (2018) https://doi.org/10.1109/MMAR.2018.8485995
Rafal Rozycki and Jan Weglarz 932 (2018) https://doi.org/10.1109/MMAR.2018.8486126
Rafal Rozycki and Grzegorz Waligora 453 (2017) https://doi.org/10.1109/MMAR.2017.8046870
Grzegorz Waligora 471 (2017) https://doi.org/10.1109/MMAR.2017.8046873
Grzegorz Waligora and Rafal Rozycki 971 (2016) https://doi.org/10.1109/MMAR.2016.7575269
Comparative Analysis of Some Metaheuristics for Discrete-Continuous Project Scheduling with Activities of Identical Processing Rates
Grzegorz Waligóra Asia-Pacific Journal of Operational Research 33 (03) 1650015 (2016) https://doi.org/10.1142/S0217595916500159
Grzegorz Waligora 52 (2015) https://doi.org/10.1109/MMAR.2015.7283705