Articles citing this article

The Citing articles tool gives a list of articles citing the current article.
The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

Reentrant open shop scheduling problem with time lags and no-wait constraints

Kenza Alioui, Karim Amrouche and Mourad Boudhar
Computers & Operations Research 166 106595 (2024)
https://doi.org/10.1016/j.cor.2024.106595

New efficient algorithms for the two-machine no-wait chain-reentrant shop problem

Nazim Sami, Karim Amrouche and Mourad Boudhar
Journal of Combinatorial Optimization 47 (5) (2024)
https://doi.org/10.1007/s10878-024-01180-4

Reentrant flow shop with identical jobs and makespan criterion

Elad Shufan, Tal Grinshpoun, Ehud Ikar and Hagai Ilani
International Journal of Production Research 61 (1) 183 (2023)
https://doi.org/10.1080/00207543.2021.1957505

Fuzzy Gilmore and Gomory algorithm: Application in robotic flow shops with the effects of job-dependent transportation and set-ups

Shahabeddin Sotudian, Ali Akbar Sadat Asl and Mohammad Hossein Fazel Zarandi
RAIRO - Operations Research 55 S1515 (2021)
https://doi.org/10.1051/ro/2020121

Reducing waste in manufacturing operations: bi-objective scheduling on a single-machine with coupled-tasks

Corentin Le Hesran, Aayush Agarwal, Anne-Laure Ladier, Valérie Botta-Genoulaz and Valérie Laforest
International Journal of Production Research 58 (23) 7130 (2020)
https://doi.org/10.1080/00207543.2019.1693653

Coupled task scheduling with exact delays: Literature review and models

Mostafa Khatami, Amir Salehipour and T.C.E. Cheng
European Journal of Operational Research 282 (1) 19 (2020)
https://doi.org/10.1016/j.ejor.2019.08.045

Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraints

Hamed Samarghandi
Computers & Industrial Engineering 136 614 (2019)
https://doi.org/10.1016/j.cie.2019.07.048

Coupled Task Scheduling With Exact Delays: Literature Review and Models

Mostafa Khatami, Amir Salehipour and T.C.E. Cheng
SSRN Electronic Journal (2018)
https://doi.org/10.2139/ssrn.3333563

Effective Iterated Greedy Algorithm for Flow-Shop Scheduling Problems with Time lags

Ning ZHAO, Song YE, Kaidian LI and Siyu CHEN
Chinese Journal of Mechanical Engineering 30 (3) 652 (2017)
https://doi.org/10.1007/s10033-017-0108-2

Chain-reentrant shop with an exact time lag: new results

Karim Amrouche, Mourad Boudhar, Mohamed Bendraouche and Farouk Yalaoui
International Journal of Production Research 55 (1) 285 (2017)
https://doi.org/10.1080/00207543.2016.1205235