The Citing articles tool gives a list of articles citing the current article. The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program . You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).
Cited article:
Can Jiao , Xiaoyan Zhu
RAIRO-Oper. Res., 52 2 (2018) 529-542
Published online: 2018-07-20
This article has been cited by the following article(s):
8 articles
Reliability modeling and warranty optimization for products with self-healing under a dynamic shock environment
Peirui Qiao, Yizhong Ma, Ming Luo, Jingyuan Shen and Hanting Zhou Reliability Engineering & System Safety 249 110174 (2024) https://doi.org/10.1016/j.ress.2024.110174
Design of a performance-based warranty policy with replacement–repair strategy and cumulative cost threshold
Anshu Dai, Xin Wang, Yu Li, Ting Li and Shuguang He International Journal of Production Economics 255 108700 (2023) https://doi.org/10.1016/j.ijpe.2022.108700
Optimal warranty policy for repairable products with a three-dimensional renewable combination warranty
Peirui Qiao, Jingyuan Shen, Fengxia Zhang and Yizhong Ma Computers & Industrial Engineering 168 108056 (2022) https://doi.org/10.1016/j.cie.2022.108056
Optimization of product line considering compatibility and reliability via discrete imperialist competitive algorithm
Chunfeng Liu, Xiao Yang and Jufeng Wang RAIRO - Operations Research 55 (6) 3773 (2021) https://doi.org/10.1051/ro/2021173
Optimal maintenance strategies for warranty products with limited repair time and limited repair number
Peng Liu, Guanjun Wang and Peng Su Reliability Engineering & System Safety 210 107554 (2021) https://doi.org/10.1016/j.ress.2021.107554
Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy
Aditi Khanna, Prerna Gautam, Biswajit Sarkar and Chandra K. Jaggi RAIRO - Operations Research 54 (2) 435 (2020) https://doi.org/10.1051/ro/2019029
A Smart Production Process for the Optimum Energy Consumption with Maintenance Policy under a Supply Chain Management
Shaktipada Bhuniya, Sarla Pareek, Biswajit Sarkar and Bimal Kumar Sett Processes 9 (1) 19 (2020) https://doi.org/10.3390/pr9010019
Optimal extended warranty length with limited number of repairs in the warranty period
Fatemeh Hooti, Jafar Ahmadi and Maria Longobardi Reliability Engineering & System Safety 203 107111 (2020) https://doi.org/10.1016/j.ress.2020.107111