Articles citing this article

The Citing articles tool gives a list of articles citing the current article.
The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

Reliability modeling and warranty optimization for products with self-healing under a dynamic shock environment

Peirui Qiao, Yizhong Ma, Ming Luo, Jingyuan Shen and Hanting Zhou
Reliability Engineering & System Safety 249 110174 (2024)
https://doi.org/10.1016/j.ress.2024.110174

Design of a performance-based warranty policy with replacement–repair strategy and cumulative cost threshold

Anshu Dai, Xin Wang, Yu Li, Ting Li and Shuguang He
International Journal of Production Economics 255 108700 (2023)
https://doi.org/10.1016/j.ijpe.2022.108700

Optimal warranty policy for repairable products with a three-dimensional renewable combination warranty

Peirui Qiao, Jingyuan Shen, Fengxia Zhang and Yizhong Ma
Computers & Industrial Engineering 168 108056 (2022)
https://doi.org/10.1016/j.cie.2022.108056

Optimization of product line considering compatibility and reliability via discrete imperialist competitive algorithm

Chunfeng Liu, Xiao Yang and Jufeng Wang
RAIRO - Operations Research 55 (6) 3773 (2021)
https://doi.org/10.1051/ro/2021173

Optimal maintenance strategies for warranty products with limited repair time and limited repair number

Peng Liu, Guanjun Wang and Peng Su
Reliability Engineering & System Safety 210 107554 (2021)
https://doi.org/10.1016/j.ress.2021.107554

Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy

Aditi Khanna, Prerna Gautam, Biswajit Sarkar and Chandra K. Jaggi
RAIRO - Operations Research 54 (2) 435 (2020)
https://doi.org/10.1051/ro/2019029

A Smart Production Process for the Optimum Energy Consumption with Maintenance Policy under a Supply Chain Management

Shaktipada Bhuniya, Sarla Pareek, Biswajit Sarkar and Bimal Kumar Sett
Processes 9 (1) 19 (2020)
https://doi.org/10.3390/pr9010019

Optimal extended warranty length with limited number of repairs in the warranty period

Fatemeh Hooti, Jafar Ahmadi and Maria Longobardi
Reliability Engineering & System Safety 203 107111 (2020)
https://doi.org/10.1016/j.ress.2020.107111