Articles citing this article

The Citing articles tool gives a list of articles citing the current article.
The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

Review of job shop scheduling research and its new perspectives under Industry 4.0

Jian Zhang, Guofu Ding, Yisheng Zou, Shengfeng Qin and Jianlin Fu
Journal of Intelligent Manufacturing 30 (4) 1809 (2019)
https://doi.org/10.1007/s10845-017-1350-2

Reducing efficiently the search tree for multiprocessor job-shop scheduling problems

Lester Carballo, Nodari Vakhania and Frank Werner
International Journal of Production Research 51 (23-24) 7105 (2013)
https://doi.org/10.1080/00207543.2013.837226

Deadlock prevention and performance oriented supervision in flexible manufacturing cells: A hierarchical approach

Sherif Fahmy, Subramaniam Balakrishnan and Tarek ElMekkawy
Robotics and Computer-Integrated Manufacturing 27 (3) 591 (2011)
https://doi.org/10.1016/j.rcim.2010.10.006

A generic deadlock-free reactive scheduling approach

Sherif A. Fahmy, Subramaniam Balakrishnan and Tarek Y. ElMekkawy
International Journal of Production Research 47 (20) 5657 (2009)
https://doi.org/10.1080/00207540802112652

Computing lower and upper bounds for a large-scale industrial job shop scheduling problem

Márton Drótos, Gábor Erdős and Tamás Kis
European Journal of Operational Research 197 (1) 296 (2009)
https://doi.org/10.1016/j.ejor.2008.06.004

A survey of scheduling problems with setup times or costs

Ali Allahverdi, C.T. Ng, T.C.E. Cheng and Mikhail Y. Kovalyov
European Journal of Operational Research 187 (3) 985 (2008)
https://doi.org/10.1016/j.ejor.2006.06.060

Feasible job insertions in the multi-processor-task job shop

Heinz Gröflin, Andreas Klinkert and Nguyen Pham Dinh
European Journal of Operational Research 185 (3) 1308 (2008)
https://doi.org/10.1016/j.ejor.2005.10.077

Feasible insertions in job shop scheduling, short cycles and stable sets

Heinz Gröflin and Andreas Klinkert
European Journal of Operational Research 177 (2) 763 (2007)
https://doi.org/10.1016/j.ejor.2005.12.025

Analysis of reactive deadlock-free scheduling in flexible job shops

Sherif A. Fahmy, Tarek Y. ElMekkawy and Subramaniam Balakrishnan
International Journal of Flexible Manufacturing Systems 19 (3) 264 (2007)
https://doi.org/10.1007/s10696-007-9026-4

Schedule Generation Schemes for the Job-Shop Problem with Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis

Christian Artigues, Pierre Lopez and Pierre-Dimitri Ayache
Annals of Operations Research 138 (1) 21 (2005)
https://doi.org/10.1007/s10479-005-2443-4

Heuristics for hybrid flow shops with controllable processing times and assignable due dates

Jatinder N.D. Gupta, Karin Krüger, Volker Lauff, Frank Werner and Yuri N. Sotskov
Computers & Operations Research 29 (10) 1417 (2002)
https://doi.org/10.1016/S0305-0548(01)00040-5

An efficient algorithm for operation insertion in a multi-resource job-shop schedule with sequence-dependent setup times

Christian Artigues and Ois Roubellat
Production Planning & Control 13 (2) 175 (2002)
https://doi.org/10.1080/09537280110069757

A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times

Christian Artigues and François Roubellat
International Journal of Production Economics 74 (1-3) 63 (2001)
https://doi.org/10.1016/S0925-5273(01)00107-4

Minimizing total flow time in a two-machine flowshop problem with minimum makespan

Jatinder N.D Gupta, Venkata R Neppalli and Frank Werner
International Journal of Production Economics 69 (3) 323 (2001)
https://doi.org/10.1016/S0925-5273(00)00039-6

A comparison of heuristic algorithms for flow shop scheduling problems with setup times and limited batch size

D. Danneberg, T. Tautenhahn and F. Werner
Mathematical and Computer Modelling 29 (9) 101 (1999)
https://doi.org/10.1016/S0895-7177(99)00085-0