Articles citing this article

The Citing articles tool gives a list of articles citing the current article.
The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

Scheduling a two-stage assembly problem with separated setup time to minimise total tardiness

JianChao Luo, ZhiQiang Liu, JiaLi Fan, Jun-Qiang Wang, YanXiang Feng and Jun Xu
International Journal of Production Research 63 (7) 2456 (2025)
https://doi.org/10.1080/00207543.2024.2403766

Production scheduling problem with assembly flow shop systems: mathematical optimisation models

José Renatho da Silva Santana and Helio Yochihiro Fuchigami
International Journal of Production Research 62 (7) 2483 (2024)
https://doi.org/10.1080/00207543.2023.2217938

Three-Stage Assembly Flow Shop Scheduling Problem with a Fixed Maintenance Period

Yuan Yuan, Xin Han, Yong Zhou and Xingwu Liu
Asia-Pacific Journal of Operational Research 40 (05) (2023)
https://doi.org/10.1142/S0217595923400195

Lot streaming for a two-stage assembly system in the presence of handling costs

Niloy J. Mukherjee, Subhash C. Sarin and Daniel A. Neira
Journal of Scheduling 26 (4) 335 (2023)
https://doi.org/10.1007/s10951-023-00777-7

Heuristics for a Two-Stage Assembly-Type Flow Shop with Limited Waiting Time Constraints

Jun-Hee Han and Ju-Yong Lee
Applied Sciences 11 (23) 11240 (2021)
https://doi.org/10.3390/app112311240

Scheduling two-stage assembly flow shop with random machines breakdowns: integrated new self-adapted differential evolutionary and simulation approach

Hany Seidgar, Hamed Fazlollahtabar and Mostafa Zandieh
Soft Computing 24 (11) 8377 (2020)
https://doi.org/10.1007/s00500-019-04407-3

Deterministic assembly scheduling problems: A review and classification of concurrent-type scheduling models and solution procedures

Jose M. Framinan, Paz Perez-Gonzalez and Victor Fernandez-Viagas
European Journal of Operational Research 273 (2) 401 (2019)
https://doi.org/10.1016/j.ejor.2018.04.033

Flow shop scheduling problems with assembly operations: a review and new trends

G. M. Komaki, Shaya Sheikh and Behnam Malakooti
International Journal of Production Research 57 (10) 2926 (2019)
https://doi.org/10.1080/00207543.2018.1550269

Hybrid branch and bound algorithms for the two-stage assembly scheduling problem with separated setup times

JianChao Luo, ZhiQiang Liu and KeYi Xing
International Journal of Production Research 57 (5) 1398 (2019)
https://doi.org/10.1080/00207543.2018.1489156

Memetic social spider optimization algorithm for scheduling two-stage assembly flowshop in a distributed environment

Guanghui Zhang and Keyi Xing
Computers & Industrial Engineering 125 423 (2018)
https://doi.org/10.1016/j.cie.2018.09.007

Minimising maximum tardiness in assembly flowshops with setup times

Asiye Aydilek, Harun Aydilek and Ali Allahverdi
International Journal of Production Research 55 (24) 7541 (2017)
https://doi.org/10.1080/00207543.2017.1387300

Improved discrete cuckoo optimization algorithm for the three-stage assembly flowshop scheduling problem

G.M. Komaki, Ehsan Teymourian, Vahid Kayvanfar and Zahra Booyavi
Computers & Industrial Engineering 105 158 (2017)
https://doi.org/10.1016/j.cie.2017.01.006

Simulated imperialist competitive algorithm in two-stage assembly flow shop with machine breakdowns and preventive maintenance

Hany Seidgar, Mostafa Zandieh, Hamed Fazlollahtabar and Iraj Mahdavi
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 230 (5) 934 (2016)
https://doi.org/10.1177/0954405414563554

Two-stage assembly scheduling problem for minimizing total tardiness with setup times

Ali Allahverdi, Harun Aydilek and Asiye Aydilek
Applied Mathematical Modelling 40 (17-18) 7796 (2016)
https://doi.org/10.1016/j.apm.2016.03.037

A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness

Ju-Yong Lee and June-Young Bang
Mathematical Problems in Engineering 2016 1 (2016)
https://doi.org/10.1155/2016/6409321

Minimizing the number of tardy jobs on a two-stage assembly flowshop

Ali Allahverdi, Asiye Aydilek and Harun Aydilek
Journal of Industrial and Production Engineering 33 (6) 391 (2016)
https://doi.org/10.1080/21681015.2016.1151466

Grey Wolf Optimizer algorithm for the two-stage assembly flow shop scheduling problem with release time

G.M. Komaki and Vahid Kayvanfar
Journal of Computational Science 8 109 (2015)
https://doi.org/10.1016/j.jocs.2015.03.011

The two stage assembly flowshop scheduling problem to minimize total tardiness

Ali Allahverdi and Harun Aydilek
Journal of Intelligent Manufacturing 26 (2) 225 (2015)
https://doi.org/10.1007/s10845-013-0775-5

An efficient imperialist competitive algorithm for scheduling in the two-stage assembly flow shop problem

Hany Seidgar, Morteza Kiani, Mehdi Abedi and Hamed Fazlollahtabar
International Journal of Production Research 52 (4) 1240 (2014)
https://doi.org/10.1080/00207543.2013.848490

The Two-stage Assembly Flow Shop Scheduling with an Availability Constraint: Worst Case Analysis

Hatem Hadda, Najoua Dridi and Sonia Hajri-Gabouj
Journal of Mathematical Modelling and Algorithms in Operations Research 13 (3) 233 (2014)
https://doi.org/10.1007/s10852-013-9235-7

An artificial immune system heuristic for two-stage multi-machine assembly scheduling problem to minimize total completion time

Fawaz S. Al-Anzi and Ali Allahverdi
Journal of Manufacturing Systems 32 (4) 825 (2013)
https://doi.org/10.1016/j.jmsy.2013.06.001

The two-stage assembly scheduling problem to minimize total completion time with setup times

Ali Allahverdi and Fawaz S. Al-Anzi
Computers & Operations Research 36 (10) 2740 (2009)
https://doi.org/10.1016/j.cor.2008.12.001

Méthode heuristique pour le problème de flow shop hybride avec machines dédiées

Najoua Dridi, Hatem Hadda and Sonia Hajri-Gabouj
RAIRO - Operations Research 43 (4) 421 (2009)
https://doi.org/10.1051/ro/2009024

The two-stage assembly flowshop scheduling problem with bicriteria of makespan and mean completion time

Ali Allahverdi and Fawaz S. Al-Anzi
The International Journal of Advanced Manufacturing Technology 37 (1-2) 166 (2008)
https://doi.org/10.1007/s00170-007-0950-y

A multi-objective production scheduling case study solved by simulated annealing

Taïcir Loukil, Jacques Teghem and Philippe Fortemps
European Journal of Operational Research 179 (3) 709 (2007)
https://doi.org/10.1016/j.ejor.2005.03.073

A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines

Christos Koulamas and George J. Kyparisis
European Journal of Operational Research 182 (2) 945 (2007)
https://doi.org/10.1016/j.ejor.2006.07.027

A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times

Fawaz S. Al-Anzi and Ali Allahverdi
European Journal of Operational Research 182 (1) 80 (2007)
https://doi.org/10.1016/j.ejor.2006.09.011

Evolutionary heuristics and an algorithm for the two-stage assembly scheduling problem to minimize makespan with setup times

Ali Allahverdi and Fawaz S. Al-Anzi
International Journal of Production Research 44 (22) 4713 (2006)
https://doi.org/10.1080/00207540600621029

A PSO and a Tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application

Ali Allahverdi and Fawaz S. Al-Anzi
Computers & Operations Research 33 (4) 1056 (2006)
https://doi.org/10.1016/j.cor.2004.09.002

A hybridisation of metaheuristics for flow shop scheduling

A. Noorul Haq, D. Ravindran, V. Aruna and S. Nithiya
The International Journal of Advanced Manufacturing Technology 24 (5-6) 376 (2004)
https://doi.org/10.1007/s00170-003-1665-3

Scheduling a multi-stage fabrication shop for efficient subsequent assembly operations

A.G Lagodimos, A.N Mihiotis and V.C Kosmidis
International Journal of Production Economics 90 (3) 345 (2004)
https://doi.org/10.1016/j.ijpe.2003.08.006