Articles citing this article

The Citing articles tool gives a list of articles citing the current article.
The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).

Cited article:

On a bi-objective distributed permutation flow shop problem with batch processing machines

Oualid Elissaouy and Karam Allali
Flexible Services and Manufacturing Journal 37 (2) 599 (2025)
https://doi.org/10.1007/s10696-024-09548-8

Two hybrid flow shop scheduling lines with assembly stage and compatibility constraints

Rafael Muñoz-Sánchez, Iris Martínez-Salazar, José Luis González-Velarde, Yasmín Á. Ríos Solís and Mazyar Ghadiri Nejad
PLOS ONE 19 (6) e0304119 (2024)
https://doi.org/10.1371/journal.pone.0304119

Minimizing the maximum tardiness for a permutation flow shop problem under the constraint of sequence independent setup time

Oualid Elissaouy and Karam Allali
RAIRO - Operations Research 58 (1) 373 (2024)
https://doi.org/10.1051/ro/2024001

Improved formulations and new valid inequalities for a Hybrid Flow Shop problem with time-varying resources and chaining time-lag

Quoc Nhat Han Tran, Nhan Quy Nguyen, Farouk Yalaoui, Lionel Amodeo and Hicham Chehade
Computers & Operations Research 149 106018 (2023)
https://doi.org/10.1016/j.cor.2022.106018

A systematic review of multi-objective hybrid flow shop scheduling

Janis S. Neufeld, Sven Schulz and Udo Buscher
European Journal of Operational Research 309 (1) 1 (2023)
https://doi.org/10.1016/j.ejor.2022.08.009

Digital twin-driven dynamic scheduling of a hybrid flow shop

Khalil Tliba, Thierno M. L. Diallo, Olivia Penas, et al.
Journal of Intelligent Manufacturing 34 (5) 2281 (2023)
https://doi.org/10.1007/s10845-022-01922-3

Coordinated optimization of equipment operations in a container terminal

T. Jonker, M. B. Duinkerken, N. Yorke-Smith, A. de Waal and R. R. Negenborn
Flexible Services and Manufacturing Journal 33 (2) 281 (2021)
https://doi.org/10.1007/s10696-019-09366-3

Two efficient nature inspired meta-heuristics solving blocking hybrid flow shop manufacturing problem

Said Aqil and Karam Allali
Engineering Applications of Artificial Intelligence 100 104196 (2021)
https://doi.org/10.1016/j.engappai.2021.104196

Ensemble of metaheuristics for energy-efficient hybrid flowshops: Makespan versus total energy consumption

Hande Öztop, M. Fatih Tasgetiren, Levent Kandiller, Deniz Türsel Eliiyi and Liang Gao
Swarm and Evolutionary Computation 54 100660 (2020)
https://doi.org/10.1016/j.swevo.2020.100660

Local search metaheuristic for solving hybrid flow shop problem in slabs and beams manufacturing

Said Aqil and Karam Allali
Expert Systems with Applications 162 113716 (2020)
https://doi.org/10.1016/j.eswa.2020.113716

Automatic Algorithm Design for Hybrid Flowshop Scheduling Problems

Pedro Alfaro-Fernández, Rubén Ruiz, Federico Pagnozzi and Thomas Stützle
European Journal of Operational Research 282 (3) 835 (2020)
https://doi.org/10.1016/j.ejor.2019.10.004

Technological Innovations in Knowledge Management and Decision Support

Latifa Dekhici, Khaled Guerraiche and Khaled Belkadi
Advances in Knowledge Acquisition, Transfer, and Management, Technological Innovations in Knowledge Management and Decision Support 34 (2019)
https://doi.org/10.4018/978-1-5225-6164-4.ch003

Metaheuristic algorithms for the hybrid flowshop scheduling problem

Hande Öztop, M. Fatih Tasgetiren, Deniz Türsel Eliiyi and Quan-Ke Pan
Computers & Operations Research 111 177 (2019)
https://doi.org/10.1016/j.cor.2019.06.009

Scheduling hybrid flowshop with sequence-dependent setup times and due windows to minimize total weighted earliness and tardiness

Ankit Khare and Sunil Agrawal
Computers & Industrial Engineering 135 780 (2019)
https://doi.org/10.1016/j.cie.2019.06.057

Heuristic algorithms for scheduling hybrid flow shops with machine blocking and setup times

João Vitor Moccellin, Marcelo Seido Nagano, Anselmo Ramalho Pitombeira Neto and Bruno de Athayde Prata
Journal of the Brazilian Society of Mechanical Sciences and Engineering 40 (2) (2018)
https://doi.org/10.1007/s40430-018-0980-4

A genetic algorithm for the hybrid flow shop scheduling with unrelated machines and machine eligibility

Chunlong Yu, Quirico Semeraro and Andrea Matta
Computers & Operations Research 100 211 (2018)
https://doi.org/10.1016/j.cor.2018.07.025

Efficient heuristics for the hybrid flow shop scheduling problem with missing operations

Manuel Dios, Victor Fernandez-Viagas and Jose M. Framinan
Computers & Industrial Engineering 115 88 (2018)
https://doi.org/10.1016/j.cie.2017.10.034

Effective metaheuristics for scheduling a hybrid flowshop with sequence-dependent setup times

Quan-Ke Pan, Liang Gao, Xin-Yu Li and Kai-Zhou Gao
Applied Mathematics and Computation 303 89 (2017)
https://doi.org/10.1016/j.amc.2017.01.004

Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times

Xin Feng, Feifeng Zheng and Yinfeng Xu
International Journal of Production Research 54 (12) 3706 (2016)
https://doi.org/10.1080/00207543.2016.1162341

Robot move sequence determining and multiple part-type scheduling in hybrid flexible flow shop robotic cells

G. Didem Batur, Serpil Erol and Oya Ekin Karasan
Computers & Industrial Engineering 100 72 (2016)
https://doi.org/10.1016/j.cie.2016.08.006

A comparison of local search algorithms with population-based algorithms in hybrid flow shop scheduling problems with realistic characteristics

Mir Abbas Bozorgirad and Rasaratnam Logendran
The International Journal of Advanced Manufacturing Technology 83 (5-8) 1135 (2016)
https://doi.org/10.1007/s00170-015-7650-9

A Bat Algorithm with Generalized Walk for the Two-Stage Hybrid Flow Shop Problem

Latifa Dekhici and Khaled Belkadi
International Journal of Decision Support System Technology 7 (3) 1 (2015)
https://doi.org/10.4018/IJDSST.2015070101

A bi-layer optimization approach for a hybrid flow shop scheduling problem involving controllable processing times in the steelmaking industry

Shenglong Jiang, Min Liu, Jinghua Hao and Wangping Qian
Computers & Industrial Engineering 87 518 (2015)
https://doi.org/10.1016/j.cie.2015.06.002

Practical solutions for a dock assignment problem with trailer transportation

Lotte Berghman and Roel Leus
European Journal of Operational Research 246 (3) 787 (2015)
https://doi.org/10.1016/j.ejor.2015.05.057

Cyclic hybrid flow shop scheduling problem with limited buffers and machine eligibility constraints

S. Abolfazl Soltani and Behrooz Karimi
The International Journal of Advanced Manufacturing Technology 76 (9-12) 1739 (2015)
https://doi.org/10.1007/s00170-014-6343-0

Swarm Intelligence Based Optimization

Aymen Sioud, Caroline Gagné and Marc Gravel
Lecture Notes in Computer Science, Swarm Intelligence Based Optimization 8472 9 (2014)
https://doi.org/10.1007/978-3-319-12970-9_2

Application of a modified GA, ACO and a random search procedure to solve the production scheduling of a case study bakery

Florian T. Hecker, Marc Stanke, Thomas Becker and Bernd Hitzmann
Expert Systems with Applications 41 (13) 5882 (2014)
https://doi.org/10.1016/j.eswa.2014.03.047

Optimal solutions for a dock assignment problem with trailer transportation

Lotte Berghman, Roel Leus and Frits C. R. Spieksma
Annals of Operations Research 213 (1) 3 (2014)
https://doi.org/10.1007/s10479-011-0971-7

A novel discrete artificial bee colony algorithm for the hybrid flowshop scheduling problem with makespan minimisation

Quan-Ke Pan, Ling Wang, Jun-Qing Li and Jun-Hua Duan
Omega 45 42 (2014)
https://doi.org/10.1016/j.omega.2013.12.004

Flexible flowline scheduling problem with constraints for the beginning and terminating time of processing of jobs at stages

Sheida Gohari and Nasser Salmasi
International Journal of Computer Integrated Manufacturing 1 (2014)
https://doi.org/10.1080/0951192X.2014.961549

Taking advantage of a diverse set of efficient production schedules: A two-step approach for scheduling with side concerns

Selçuk Gören and Henri Pierreval
Computers & Operations Research 40 (8) 1979 (2013)
https://doi.org/10.1016/j.cor.2013.02.016

Solving a new mathematical model for a hybrid flow shop scheduling problem with a processor assignment by a genetic algorithm

Amin Ziaeifar, Reza Tavakkoli-Moghaddam and Khosro Pichka
The International Journal of Advanced Manufacturing Technology 61 (1-4) 339 (2012)
https://doi.org/10.1007/s00170-011-3701-z

An agent-based genetic algorithm for hybrid flowshops with sequence dependent setup times to minimise makespan

Pedro Gómez-Gasquet, Carlos Andrés and Francisco-Cruz Lario
Expert Systems with Applications 39 (9) 8095 (2012)
https://doi.org/10.1016/j.eswa.2012.01.158

Planning Production and Inventories in the Extended Enterprise

Abdelhakim Artiba, Valerie Dhaevers, David Duvivier and Salah E. Elmaghraby
International Series in Operations Research & Management Science, Planning Production and Inventories in the Extended Enterprise 152 489 (2011)
https://doi.org/10.1007/978-1-4419-8191-2_19

Shifting representation search for hybrid flexible flowline problems

Thijs Urlings, Rubén Ruiz and Thomas Stützle
European Journal of Operational Research 207 (2) 1086 (2010)
https://doi.org/10.1016/j.ejor.2010.05.041

Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective

Imma Ribas, Rainer Leisten and Jose M. Framiñan
Computers & Operations Research 37 (8) 1439 (2010)
https://doi.org/10.1016/j.cor.2009.11.001

Heuristic algorithms for preemptive scheduling in a two-stage hybrid flowshop with additional renewable resources at each stage

Ewa Figielska
Computers & Industrial Engineering 59 (4) 509 (2010)
https://doi.org/10.1016/j.cie.2010.06.006

An effective hybrid particle swarm optimization for batch scheduling of polypropylene processes

Bo Liu, Ling Wang, Ying Liu, Bin Qian and Yi-Hui Jin
Computers & Chemical Engineering 34 (4) 518 (2010)
https://doi.org/10.1016/j.compchemeng.2009.12.010

Due windows group scheduling using an effective hybrid optimization approach

J. Behnamian, M. Zandieh and S. M. T. Fatemi Ghomi
The International Journal of Advanced Manufacturing Technology 46 (5-8) 721 (2010)
https://doi.org/10.1007/s00170-009-2147-z

Hybrid flowshop with unrelated machines, sequence-dependent setup time, availability constraints and limited buffers

Victor Yaurima, Larisa Burtseva and Andrei Tchernykh
Computers & Industrial Engineering 56 (4) 1452 (2009)
https://doi.org/10.1016/j.cie.2008.09.004

Hybrid Flow-Shop: a Memetic Algorithm Using Constraint-Based Scheduling for Efficient Search

Antoine Jouglet, Ceyda Oğuz and Marc Sevaux
Journal of Mathematical Modelling and Algorithms 8 (3) 271 (2009)
https://doi.org/10.1007/s10852-008-9101-1

Optimal cash flow and operational planning in a company supply chain

S. Bertel, P. Fenies and O. Roux
International Journal of Computer Integrated Manufacturing 21 (4) 440 (2008)
https://doi.org/10.1080/09511920701574628

Modeling realistic hybrid flexible flowshop scheduling problems

Rubén Ruiz, Funda Sivrikaya Şerifoğlu and Thijs Urlings
Computers & Operations Research 35 (4) 1151 (2008)
https://doi.org/10.1016/j.cor.2006.07.014

Parallel Processing and Applied Mathematics

Victor Yaurima, Larisa Burtseva and Andrei Tchernykh
Lecture Notes in Computer Science, Parallel Processing and Applied Mathematics 4967 608 (2008)
https://doi.org/10.1007/978-3-540-68111-3_63

Parallel genetic algorithms with migration for the hybrid flow shop scheduling problem

K. Belkadi, M. Gourgand and M. Benyettou
Journal of Applied Mathematics and Decision Sciences 2006 1 (2006)
https://doi.org/10.1155/JAMDS/2006/65746

Sequential and Parallel Genetic Algorithms for the Hybrid Flow Shop Scheduling Problem

K. Belkadi, M. Gourgand ., M. Benyettou . and A. Aribi .
Journal of Applied Sciences 6 (4) 775 (2006)
https://doi.org/10.3923/jas.2006.775.778

A genetic algorithm for hybrid flowshops with sequence dependent setup times and machine eligibility

Rubén Ruiz and Concepción Maroto
European Journal of Operational Research 169 (3) 781 (2006)
https://doi.org/10.1016/j.ejor.2004.06.038

Resolution of Scheduling Problem of the Production Systems by Sequential and Parallel Tabu Search

K. Belkadi, M. Gourgand . and M. Benyettou .
Journal of Applied Sciences 6 (7) 1534 (2006)
https://doi.org/10.3923/jas.2006.1534.1539

A review of exact solution methods for the non-preemptive multiprocessor flowshop problem

Tamás Kis and Erwin Pesch
European Journal of Operational Research 164 (3) 592 (2005)
https://doi.org/10.1016/j.ejor.2003.12.026

Group technology in a hybrid flowshop environment: A case study

Carlos Andrés, José Miguel Albarracı́n, Guillermina Tormo, Eduardo Vicens and José Pedro Garcı́a-Sabater
European Journal of Operational Research 167 (1) 272 (2005)
https://doi.org/10.1016/j.ejor.2004.03.026

Total completion time minimization in a computer system with a server and two parallel processors

S. Guirchoun, P. Martineau and J.-C. Billaut
Computers & Operations Research 32 (3) 599 (2005)
https://doi.org/10.1016/j.cor.2003.08.007

A genetic algorithm for an industrial multiprocessor flow shop scheduling problem with recirculation

S. Bertel and J.-C. Billaut
European Journal of Operational Research 159 (3) 651 (2004)
https://doi.org/10.1016/S0377-2217(03)00434-X

Steel-making process scheduling using Lagrangian relaxation

Lixin Tang, Peter B. Luh, Jiyin Liu and Lei Fang
International Journal of Production Research 40 (1) 55 (2002)
https://doi.org/10.1080/00207540110073000

Sequencing a hybrid two-stage flowshop with dedicated machines

Fouad Riane, Abdelhakim Artiba and Salah E. Elmaghraby
International Journal of Production Research 40 (17) 4353 (2002)
https://doi.org/10.1080/00207540210159536

Automatic notation of the physical structure of a flexible manufacturing system

Claudine Tacquard and Patrick Martineau
International Journal of Production Economics 74 (1-3) 279 (2001)
https://doi.org/10.1016/S0925-5273(01)00133-5