The Citing articles tool gives a list of articles citing the current article. The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program . You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).
Cited article:
Odile Bellenguez-Morineau , Emmanuel Néron
RAIRO-Oper. Res., 41 2 (2007) 155-170
Published online: 2007-06-15
This article has been cited by the following article(s):
98 articles
A priority rule heuristic for the multi-skilled resource-constrained project scheduling problem
Guillaume Vermeire and Mario Vanhoucke Applied Soft Computing 171 112776 (2025) https://doi.org/10.1016/j.asoc.2025.112776
Examining a multi-skilled project scheduling problem for shipyard industry through operational and tactical perspectives
Abdullah Türk, Ömer Faruk Yılmaz and Murat Özkök Computers & Operations Research 183 107150 (2025) https://doi.org/10.1016/j.cor.2025.107150
A solution framework for multi-skilled project scheduling problems with hierarchical skills
Jakob Snauwaert and Mario Vanhoucke Journal of Scheduling 28 (3) 289 (2025) https://doi.org/10.1007/s10951-025-00836-1
A multi-level rescheduling approach for a dynamic remote operations scheduling problem
Annalisa Castelletti, Lorenzo Moreschini, Marzia Corvaglia and Renata Mansini International Journal of Production Research 63 (8) 2711 (2025) https://doi.org/10.1080/00207543.2024.2408438
A Two-Layer Approach for the Decentralized Multi-Project Scheduling Problem Sharing Multi-Skilled Staff
Weibao You, Zhe Xu and Song Zhao IEEE Access 12 29204 (2024) https://doi.org/10.1109/ACCESS.2024.3369177
Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production
Jinchi Han, Chen Chen, Robert Lee Kong Tiong and Kan Wu Automation in Construction 166 105626 (2024) https://doi.org/10.1016/j.autcon.2024.105626
A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff
Weibao You, Zhe Xu, Yining Yu and Song Zhao International Transactions in Operational Research 31 (3) 1631 (2024) https://doi.org/10.1111/itor.13392
A multi-skilled staff scheduling and team configuration optimisation model for artificial intelligence project portfolio considering competence development and innovation-driven
Rong Chen, Dongxiao Gu, Changyong Liang and Li Jiang International Journal of Production Research 62 (21) 7763 (2024) https://doi.org/10.1080/00207543.2024.2328131
The Multi-Skilled Resource-Constrained Project Scheduling Problem: A Systematic Review and an Exploration of Future Landscapes
Zied Bahroun, Rami As’ad, Moayad Tanash and Raed Athamneh Management Systems in Production Engineering 32 (1) 108 (2024) https://doi.org/10.2478/mspe-2024-0012
Solving a real-life multi-skill resource-constrained multi-project scheduling problem
Rahman Torba, Stéphane Dauzère-Pérès, Claude Yugma, Cédric Gallais and Juliette Pouzet Annals of Operations Research 338 (1) 69 (2024) https://doi.org/10.1007/s10479-023-05784-7
Multi-project scheduling problem under shared multi-skill resource constraints
Meya Haroune, Cheikh Dhib, Emmanuel Neron, et al. TOP 31 (1) 194 (2023) https://doi.org/10.1007/s11750-022-00633-5
The Integrated Problem of Construction Project Scheduling and Multiskilled Staff Assignment with Learning Effect
Qian Li, Mengqin Jiang, Sha Tao, Jin Hao and Heap-Yih Chong Journal of Construction Engineering and Management 149 (8) (2023) https://doi.org/10.1061/JCEMD4.COENG-13150
Preemptive multi-skill resource-constrained project scheduling of marine power equipment maintenance tasks1
Peng Wang, Shaojun Lu, Hao Cheng, Lin Liu and Feng Pei Journal of Intelligent & Fuzzy Systems 44 (3) 5275 (2023) https://doi.org/10.3233/JIFS-221994
A three-step framework for capacity planning in a nursing home context
Nanne A. Dieleman, Martijn Buitink, René Bekker and Dennis Moeke Health Systems 12 (3) 299 (2023) https://doi.org/10.1080/20476965.2022.2062461
A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
Jakob Snauwaert and Mario Vanhoucke European Journal of Operational Research 307 (1) 1 (2023) https://doi.org/10.1016/j.ejor.2022.05.049
Heuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemption
Oliver Polo‐Mejía, Christian Artigues, Pierre Lopez, Lars Mönch and Virginie Basini International Transactions in Operational Research 30 (2) 858 (2023) https://doi.org/10.1111/itor.13063
A Two-Stage Algorithm Based on 12 Priority Rules for the Stochastic Distributed Resource-Constrained Multi-Project Scheduling Problem With Multi-Skilled Staff
Yining Yu, Zhe Xu and Song Zhao IEEE Access 11 29554 (2023) https://doi.org/10.1109/ACCESS.2023.3261139
On the complexity of efficient multi-skilled team composition
Jakob Snauwaert, Rob Van Eynde and Mario Vanhoucke Computers & Operations Research 157 106277 (2023) https://doi.org/10.1016/j.cor.2023.106277
Tabu search for proactive project scheduling problem with flexible resources
Yong Ma, Zhengwen He, Nengmin Wang and Erik Demeulemeester Computers & Operations Research 153 106185 (2023) https://doi.org/10.1016/j.cor.2023.106185
Preventive maintenance scheduling of a multi-skilled human resource-constrained project’s portfolio
G. Bocewicz, P. Golińska-Dawson, E. Szwarc and Z. Banaszak Engineering Applications of Artificial Intelligence 119 105725 (2023) https://doi.org/10.1016/j.engappai.2022.105725
A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times
Ying Liu, Shuang Jin, Jing Zhou and Qian Hu Computers & Operations Research 151 106097 (2023) https://doi.org/10.1016/j.cor.2022.106097
Multi-neighborhood simulated annealing for personalized user project planning
Yinuo Li and Jin-Kao Hao Applied Soft Computing 119 108566 (2022) https://doi.org/10.1016/j.asoc.2022.108566
Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm
Yang-Yuan Li, Jian Lin and Zhou-Jing Wang Applied Intelligence 52 (5) 5718 (2022) https://doi.org/10.1007/s10489-021-02608-8
Dynamic Optimization of the Multi-Skilled Resource-Constrained Project Scheduling Problem with Uncertainty in Resource Availability
Min Wang, Guoshan Liu and Xinyu Lin Mathematics 10 (17) 3070 (2022) https://doi.org/10.3390/math10173070
A two-stage approach with softmax scoring mechanism for a multi-project scheduling problem sharing multi-skilled staff
Yining Yu, Zhe Xu, Dongning Liu and Song Zhao Expert Systems with Applications 203 117385 (2022) https://doi.org/10.1016/j.eswa.2022.117385
Optimization of the integrated problem of employee timetabling and job shop scheduling
Mohamed Frihat, Atidel B.Hadj-Alouane and Chérif Sadfi Computers & Operations Research 137 105332 (2022) https://doi.org/10.1016/j.cor.2021.105332
Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer
James C. Chen, Yin-Yann Chen, Tzu-Li Chen and Yi-Hsuan Lin Computers & Industrial Engineering 169 108240 (2022) https://doi.org/10.1016/j.cie.2022.108240
A Project Scheduling Game Equilibrium Problem Based on Dynamic Resource Supply
Cuiying Feng, Shengsheng Hu, Yanfang Ma and Zongmin Li Applied Sciences 12 (18) 9062 (2022) https://doi.org/10.3390/app12189062
A bi-objective model for scheduling of multiple projects under multi-skilled workforce for distributed load energy usage
Shima Javanmard, Behrouz Afshar-Nadjafi and Seyed Taghi Akhavan Niaki Operational Research 22 (3) 2245 (2022) https://doi.org/10.1007/s12351-021-00633-6
Mathematical formulations for project scheduling problems with categorical and hierarchical skills
Jakob Snauwaert and Mario Vanhoucke Computers & Industrial Engineering 169 108147 (2022) https://doi.org/10.1016/j.cie.2022.108147
Meta-heuristic Solution with Considering Setup Time for Multi-Skilled Project Scheduling Problem
Behrad Barghi and Shahram Shadrokh Sikari Operations Research Forum 3 (1) (2022) https://doi.org/10.1007/s43069-021-00117-5
Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches
Yuan Tian, Tifan Xiong, Zhenyuan Liu, Yi Mei and Li Wan Computers & Industrial Engineering 167 107897 (2022) https://doi.org/10.1016/j.cie.2021.107897
Multi-skilling in scheduling problems: A review on models, methods and applications
Behrouz Afshar-Nadjafi Computers & Industrial Engineering 151 107004 (2021) https://doi.org/10.1016/j.cie.2020.107004
Application of Mathematics and Optimization in Construction Project Management
Sönke Hartmann Application of Mathematics and Optimization in Construction Project Management 25 (2021) https://doi.org/10.1007/978-3-030-81123-5_2
Problem-specific multi-objective invasive weed optimization algorithm for reconnaissance mission scheduling problem
Junqi Cai, Zhihong Peng, Shuxin Ding and Jingbo Sun Computers & Industrial Engineering 157 107345 (2021) https://doi.org/10.1016/j.cie.2021.107345
A new algorithm for resource-constrained project scheduling with breadth and depth of skills
Jakob Snauwaert and Mario Vanhoucke European Journal of Operational Research 292 (1) 43 (2021) https://doi.org/10.1016/j.ejor.2020.10.032
A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
Lei Zhu, Jian Lin, Yang-Yuan Li and Zhou-Jing Wang Knowledge-Based Systems 225 107099 (2021) https://doi.org/10.1016/j.knosys.2021.107099
A competence-time-quality scheduling model of multi-skilled staff for IT project portfolio
Rong Chen, Changyong Liang, Dongxiao Gu and Huimin Zhao Computers & Industrial Engineering 139 106183 (2020) https://doi.org/10.1016/j.cie.2019.106183
A genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem
Jian Lin, Lei Zhu and Kaizhou Gao Expert Systems with Applications 140 112915 (2020) https://doi.org/10.1016/j.eswa.2019.112915
A branch-and-bound embedded genetic algorithm for resource-constrained project scheduling problem with resource transfer time of aircraft moving assembly line
Yifei Ren, Zhiqiang Lu and Xinyi Liu Optimization Letters 14 (8) 2161 (2020) https://doi.org/10.1007/s11590-020-01542-x
Optimization of planned solutions based on network models for large-scale problems
Yu N Kondrashov and A A Ermakov IOP Conference Series: Materials Science and Engineering 862 (5) 052074 (2020) https://doi.org/10.1088/1757-899X/862/5/052074
Product Service Scheduling Problem with Service Matching Based on Tabu Search Method
Liu Cheng Hao, Wang Yan Hong, Qiu Jia Wei, Dong Wei Zhao and Shan Rui Journal of Advanced Transportation 2020 1 (2020) https://doi.org/10.1155/2020/5748680
Optimization of Complex Systems: Theory, Models, Algorithms and Applications
Simon Caillard, Laure Brisoux Devendeville and Corinne Lucet Advances in Intelligent Systems and Computing, Optimization of Complex Systems: Theory, Models, Algorithms and Applications 991 1033 (2020) https://doi.org/10.1007/978-3-030-21803-4_102
Software Engineering Perspectives in Intelligent Systems
Yuri Kondrashov, Olga Glushkova and Dmitry Kobzev Advances in Intelligent Systems and Computing, Software Engineering Perspectives in Intelligent Systems 1294 998 (2020) https://doi.org/10.1007/978-3-030-63322-6_86
A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
Lei Zhu, Jian Lin and Zhou-Jing Wang Applied Soft Computing 85 105805 (2019) https://doi.org/10.1016/j.asoc.2019.105805
A general variable neighborhood search based on path relinking algorithm for multi-skill resource-constrained project scheduling problem with multiple restrictions
H Dai and W Cheng Journal of Physics: Conference Series 1341 (5) 052006 (2019) https://doi.org/10.1088/1742-6596/1341/5/052006
Multi-skill project scheduling problem under time-of-use electricity tariffs and shift differential payments
Hamid Najafzad, Hamed Davari-Ardakani and Reza Nemati-Lafmejani Energy 168 619 (2019) https://doi.org/10.1016/j.energy.2018.11.070
Preemptive multi-skilled resource constrained project scheduling problem with hard/soft interval due dates
Hamidreza Maghsoudlou, Behrouz Afshar-Nadjafi and Seyed Taghi Akhavan Niaki RAIRO - Operations Research 53 (5) 1877 (2019) https://doi.org/10.1051/ro/2018103
An effective teaching-learning-based optimization algorithm for the multi-skill resource-constrained project scheduling problem
Dheeraj Joshi, M.L. Mittal, Milind Kumar Sharma and Manish Kumar Journal of Modelling in Management 14 (4) 1064 (2019) https://doi.org/10.1108/JM2-07-2018-0108
Modeling of the time-dependent multi-skilled RCPSP considering learning effect
Amir Hossein Hosseinian, Vahid Baradaran and Mahdi Bashiri Journal of Modelling in Management 14 (2) 521 (2019) https://doi.org/10.1108/JM2-07-2018-0098
Project Staff Scheduling with Theory of Coalition
Oğuzhan Ahmet Arık, Erkan Köse and Jeffrey Yi-Lin Forrest Group Decision and Negotiation 28 (4) 827 (2019) https://doi.org/10.1007/s10726-019-09617-6
Demand-Driven Task-Scheduling in a Nursing Home Setting: A Genetic Algorithm Approach
René Bekker, Dennis Moeke, Nanne Dieleman, et al. SSRN Electronic Journal (2019) https://doi.org/10.2139/ssrn.3367017
Multi-skill project scheduling with skill evolution and cooperation effectiveness
Qian Li, Qinshan Sun, Sha Tao and Xinglin Gao Engineering, Construction and Architectural Management 27 (8) 2023 (2019) https://doi.org/10.1108/ECAM-06-2019-0294
Virginia Yannibelli 11288 33 (2018) https://doi.org/10.1007/978-3-030-04491-6_3
A knowledge-guided multi-objective fruit fly optimization algorithm for the multi-skill resource constrained project scheduling problem
Ling Wang and Xiao-long Zheng Swarm and Evolutionary Computation 38 54 (2018) https://doi.org/10.1016/j.swevo.2017.06.001
Principles and Practice of Constraint Programming
Kenneth D. Young, Thibaut Feydy and Andreas Schutt Lecture Notes in Computer Science, Principles and Practice of Constraint Programming 10416 308 (2017) https://doi.org/10.1007/978-3-319-66158-2_20
A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution
Rong Chen, Changyong Liang, Dongxiao Gu and Joseph Y-T. Leung International Journal of Production Research 55 (21) 6207 (2017) https://doi.org/10.1080/00207543.2017.1326641
Skills management in the optimization of aircraft maintenance processes
Dorota Stadnicka, Dmitry Arkhipov, Olga Battaïa and R.M. Chandima Ratnayake IFAC-PapersOnLine 50 (1) 6912 (2017) https://doi.org/10.1016/j.ifacol.2017.08.1216
Priority-based heuristics for the multi-skill resource constrained project scheduling problem
Bernardo F. Almeida, Isabel Correia and Francisco Saldanha-da-Gama Expert Systems with Applications 57 91 (2016) https://doi.org/10.1016/j.eswa.2016.03.017
Intelligent Data Engineering and Automated Learning – IDEAL 2015
Virginia Yannibelli and Analía Amandi Lecture Notes in Computer Science, Intelligent Data Engineering and Automated Learning – IDEAL 2015 9375 340 (2015) https://doi.org/10.1007/978-3-319-24834-9_40
Dongwon Seo, Donghwan Shin and Doo-Hwan Bae 269 (2015) https://doi.org/10.1109/APSEC.2015.47
Workforce planning incorporating skills: State of the art
Philippe De Bruecker, Jorne Van den Bergh, Jeroen Beliën and Erik Demeulemeester European Journal of Operational Research 243 (1) 1 (2015) https://doi.org/10.1016/j.ejor.2014.10.038
Quality-Based Software Project Staffing and Scheduling with Project Deadline
Dongwon Seo, Donghwan Shin and Doo-Hwan Bae Journal of KIISE 42 (7) 878 (2015) https://doi.org/10.5626/JOK.2015.42.7.878
Advances in Artificial Intelligence and Soft Computing
Virginia Yannibelli and Analía Amandi Lecture Notes in Computer Science, Advances in Artificial Intelligence and Soft Computing 9413 401 (2015) https://doi.org/10.1007/978-3-319-27060-9_33
Task scheduling in long-term care facilities: A client-centered approach
Alexander Lieder, Dennis Moeke, Ger Koole and Raik Stolletz Operations Research for Health Care 6 11 (2015) https://doi.org/10.1016/j.orhc.2015.06.001
A Multi-Objective Immune Genetic Algorithm for Project Scheduling on Multi-Skill Resources
Lu Cheng, Guang Rui Liao and Zhen Yuan Liu Applied Mechanics and Materials 719-720 1268 (2015) https://doi.org/10.4028/www.scientific.net/AMM.719-720.1268
Handbook on Project Management and Scheduling Vol.1
Cheikh Dhib, Ameur Soukhal and Emmanuel Néron Handbook on Project Management and Scheduling Vol.1 603 (2015) https://doi.org/10.1007/978-3-319-05443-8_28
Considering skills evolutions in multi-skilled workforce allocation with flexible working hours
El-Awady Attia, Philippe Duquenne and Jean-Marc Le-Lann International Journal of Production Research 52 (15) 4548 (2014) https://doi.org/10.1080/00207543.2013.877613
Intelligent Data Engineering and Automated Learning – IDEAL 2014
Virginia Yannibelli and Analía Amandi Lecture Notes in Computer Science, Intelligent Data Engineering and Automated Learning – IDEAL 2014 8669 412 (2014) https://doi.org/10.1007/978-3-319-10840-7_50
Multiagent System Technologies
Ferran Torrent-Fontbona, Albert Pla and Beatriz López Lecture Notes in Computer Science, Multiagent System Technologies 8732 57 (2014) https://doi.org/10.1007/978-3-319-11584-9_5
Simulation of project scheduling through the rule-based coordination in indirect collaboration design
W Jinghua, Z Liyi and X Hongxiang Journal of Simulation 8 (4) 251 (2014) https://doi.org/10.1057/jos.2013.25
Nanlin Jin and Xin Yao 3016 (2014) https://doi.org/10.1109/CEC.2014.6900527
S. Divyalakshmi and D. Sivakumar 1333 (2014) https://doi.org/10.1109/ICCSP.2014.6950066
Guang-Rui Liao, Zhen-yuan Liu and Yang Bi 4885 (2014) https://doi.org/10.1109/CCDC.2014.6853048
Workforce Planning Incorporating Skills: State of the Art
Philippe De Bruecker, Jorne Van den Bergh, Jeroen Beli n and Erik Demeulemeester SSRN Electronic Journal (2014) https://doi.org/10.2139/ssrn.2437372
Integrated Project Scheduling and Staff Assignment with Controllable Processing Times
Victor Fernandez-Viagas and Jose M. Framinan The Scientific World Journal 2014 1 (2014) https://doi.org/10.1155/2014/924120
The impact of fixed and variable costs in a multi-skill project scheduling problem: An empirical study
Isabel Correia and Francisco Saldanha-da-Gama Computers & Industrial Engineering 72 230 (2014) https://doi.org/10.1016/j.cie.2014.03.020
Stable multi-skill workforce assignments
Murat Fırat, C. A. J. Hurkens and Alexandre Laugier Annals of Operations Research 213 (1) 95 (2014) https://doi.org/10.1007/s10479-012-1224-0
Project scheduling: A multi-objective evolutionary algorithm that optimizes the effectiveness of human resources and the project makespan
Virginia Yannibelli and Analía Amandi Engineering Optimization 45 (1) 45 (2013) https://doi.org/10.1080/0305215X.2012.658782
Hui Nie and Bo Liu 1150 (2013) https://doi.org/10.1109/ICCIS.2013.305
Ant Colony Optimization for Software Project Scheduling and Staffing with an Event-Based Scheduler
Wei-Neng Chen and Jun Zhang IEEE Transactions on Software Engineering 39 (1) 1 (2013) https://doi.org/10.1109/TSE.2012.17
Chen Di, Sun Fu-quan, Liu Shi-xin and Wang Yi-fan 1846 (2013) https://doi.org/10.1109/CCDC.2013.6561233
Wang Yi-fan, Sun Fu-quan, Liu Shi-xin and Chen Di 2408 (2013) https://doi.org/10.1109/CCDC.2013.6561342
Optimal methods for resource allocation and scheduling: a cross-disciplinary survey
Michele Lombardi and Michela Milano Constraints 17 (1) 51 (2012) https://doi.org/10.1007/s10601-011-9115-6
Project scheduling with flexible resources: formulation and inequalities
Isabel Correia, Lídia Lampreia Lourenço and Francisco Saldanha-da-Gama OR Spectrum 34 (3) 635 (2012) https://doi.org/10.1007/s00291-010-0233-0
The Research on the Optimization of Transportation Routing for Fresh Food by Improved Genetic Algorithm
Ying Wu, Zi Bo Meng and Min Peng Applied Mechanics and Materials 178-181 1790 (2012) https://doi.org/10.4028/www.scientific.net/AMM.178-181.1790
Yifan Wang, Di Chen, Shixin Liu and Qingfu Zeng 3430 (2012) https://doi.org/10.1109/CCDC.2012.6244546
An improved MIP-based approach for a multi-skill workforce scheduling problem
Murat Fırat and C. A. J. Hurkens Journal of Scheduling 15 (3) 363 (2012) https://doi.org/10.1007/s10951-011-0245-x
Hybrid Artificial Intelligent Systems
Virginia Yannibelli and Analía Amandi Lecture Notes in Computer Science, Hybrid Artificial Intelligent Systems 7208 159 (2012) https://doi.org/10.1007/978-3-642-28942-2_15
The Research on Location of Multi-Level Network Distribution Centers
Ying Wu, Yi Lu and Yang Li Applied Mechanics and Materials 97-98 653 (2011) https://doi.org/10.4028/www.scientific.net/AMM.97-98.653
Virginia Yannibelli and Analia Amandi 205 (2011) https://doi.org/10.1109/ICI.2011.41
A knowledge-based evolutionary assistant to software development project scheduling
Virginia Yannibelli and Analía Amandi Expert Systems with Applications 38 (7) 8403 (2011) https://doi.org/10.1016/j.eswa.2011.01.035
Wu Ying and Cheng Cisheng 264 (2011) https://doi.org/10.1109/SOLI.2011.5986567
Scheduling and staffing multiple projects with a multi-skilled workforce
Christian Heimerl and Rainer Kolisch OR Spectrum 32 (2) 343 (2010) https://doi.org/10.1007/s00291-009-0169-4
Ying Wu and Cisheng Cheng 1405 (2010) https://doi.org/10.1061/41139(387)193
Scheduling technicians and tasks in a telecommunications company
Jean-François Cordeau, Gilbert Laporte, Federico Pasin and Stefan Ropke Journal of Scheduling 13 (4) 393 (2010) https://doi.org/10.1007/s10951-010-0188-7
279 (2008) https://doi.org/10.1002/9780470611227.biblio
Methods to solve multi-skill project scheduling problem
Odile Bellenguez-Morineau 4OR 6 (1) 85 (2008) https://doi.org/10.1007/s10288-007-0038-4