Simulated Annealing and Tabu Search for Discrete-Continuous Project Scheduling with Discounted Cash FlowsGrzegorz WaligóraRAIRO-Oper. Res., 48 1 (2014) 1-24DOI: https://doi.org/10.1051/ro/2013045