Multi-objective optimization of integrated lot-sizing and scheduling problem in flexible job shopsMohammad Rohaninejad, Rashed Sahraeian and Behdin Vahedi NouriRAIRO-Oper. Res., 50 3 (2016) 587-609DOI: https://doi.org/10.1051/ro/2015049