Scheduling job shop problems with operators with respect to the maximum latenessImène Benkalai, Djamal Rebaine and Pierre BaptisteRAIRO-Oper. Res., 54 2 (2020) 555-568DOI: https://doi.org/10.1051/ro/2019116