Download citation

A multi-objective multi-agent optimization algorithm for the multi-skill resource-constrained project scheduling problem with transfer times

RAIRO-Oper. Res., 55 4 (2021) 2093-2128
DOI: https://doi.org/10.1051/ro/2021087