Single machine group scheduling problem with makespan objective and a proportional linear shorteningJi-Bo Wang, Xue Jia, Jia-Xuan Yan, Si-Han Wang and Jin QianRAIRO-Oper. Res., 56 3 (2022) 1523-1532DOI: https://doi.org/10.1051/ro/2022078