A bi-objective approach for the multi-skilled worker assignment of a hybrid assembly line-seru production systemYinghui Wu, Shaoyu Zeng, Bingbing Li and Yang YuRAIRO-Oper. Res., 58 2 (2024) 1187-1206DOI: https://doi.org/10.1051/ro/2024022