Economic lot scheduling problem under two different rework policies
Amir Hossein Nobil, Erfan Nobil, Leopoldo Eduardo Cárdenas-Barrón, Dagoberto Garza-Núñez, Gerardo Treviño-Garza, Armando Céspedes-Mota, Imelda de Jesús Loera-Hernández and Neale R. Smith
RAIRO-Oper. Res., 59 6 (2025) 3749-3776
DOI: https://doi.org/10.1051/ro/2025020