Multi-objective permutation and non-permutation flow shop scheduling problems with no-wait: a systematic literature reviewHarpreet Singh, Jaspreet Singh Oberoi and Doordarshi SinghRAIRO-Oper. Res., 55 1 (2021) 27-50DOI: https://doi.org/10.1051/ro/2020055