Minimizing the maximum tardiness for a permutation flow shop problem under the constraint of sequence independent setup timeOualid Elissaouy and Karam AllaliRAIRO-Oper. Res., 58 1 (2024) 373-395DOI: https://doi.org/10.1051/ro/2024001