Shipment lead time hedging and coordination in prefabricated construction supply chainZhenyi Wang, Haizi Wang, Shibin Zhang and Shuai QiuRAIRO-Oper. Res., 58 3 (2024) 2143-2166DOI: https://doi.org/10.1051/ro/2024041