Economic lot-size problem for a cleaner manufacturing system with warm-up period Amir Hossein Nobil, Abolfazl Kazemi and Ata Allah Taleizadeh RAIRO-Oper. Res., 54 5 (2020) 1495-1514 Published online: 23 July 2020 DOI: 10.1051/ro/2019056