Issue |
RAIRO-Oper. Res.
Volume 34, Number 1, January March 2000
|
|
---|---|---|
Page(s) | 61 - 83 | |
DOI | https://doi.org/10.1051/ro:2000105 | |
Published online | 15 August 2002 |
Planification des Emplois du Temps et de la Formation au Sein d'une Grande Entreprise
Département de Mathématiques, École Polytechnique
Fédérale de Lausanne, CH-1015 Lausanne,
Switzerland.
Received:
July
1997
We describe an O.R. technique which plans the allotment of time of the collaborators of a big company. The proposed method not only considers the immediate profitability of the company, but also the training of the collaborators in order to guarantee the success of the company's rising generation. The proposed method uses a greedy approach and constitutes therefore a simple and fast tool for decision makers. It has been successfully implemented in an important Swiss bank society.
Résumé
Nous décrivons une méthode issue de la Recherche Opérationnelle permettant de planifier l'emploi du temps des collaborateurs d'une grande entreprise. La méthode que nous proposons tient compte aussi bien de la rentabilité immédiate de l'entreprise que de la formation des collaborateurs, le but étant d'assurer une relève au sein de l'entreprise. Afin d'offrir au planificateur un outil simple et rapide d'aide a la décision, nous avons opté pour une approche de type glouton. La méthode a été implantée avec succès dans un important établissement bancaire helvétique.
Key words: Timetabling / minimum cost flow / critical path method / decision aid system.
© EDP Sciences, 2000
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.