Issue |
RAIRO-Oper. Res.
Volume 49, Number 4, October-December 2015
|
|
---|---|---|
Page(s) | 795 - 804 | |
DOI | https://doi.org/10.1051/ro/2015005 | |
Published online | 08 May 2015 |
On the two-stage hybrid flow shop with dedicated machines
1 LISI, INSAT, Centre Urbain Nord B.P.
N676, 1080
Tunis Cedex.
Tunisia.
hatem.hadda@esti.rnu.tn
2 Unité de Recherche OASIS, ENIT, BP.
37, Le belvédère, 1002
Tunis.
Tunisia.
h.mohamed.karim@hotmail.fr; najoua.dridi@enit.rnu.tn
Received:
18
September
2013
Accepted:
11
February
2015
In this paper we develop new elimination rules and discuss several polynomially solvable cases for the two-stage hybrid flow shop problem with dedicated machines. We also propose a worst case analysis for several heuristics. Furthermore, we point out and correct several errors in the paper of Yang [J. Yang, A two-stage hybrid flow shop with dedicated machines at the first stage. Comput. Oper. Res. 40 (2013) 2836−2843].
Mathematics Subject Classification: 90B35 / 90B30
Key words: Scheduling / hybrid flow shop / dedicated machines / worst case analysis / elimination rule
© EDP Sciences, ROADEF, SMAI 2015
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.