Issue |
RAIRO-Oper. Res.
Volume 52, Number 2, April–June 2018
|
|
---|---|---|
Page(s) | 415 - 427 | |
DOI | https://doi.org/10.1051/ro/2017063 | |
Published online | 22 June 2018 |
Algebraic modelling of a two level supply chain with defective items
1
Department of Information Systems, King Faisal University,
P.O. Box 78,
Al-Hufof
31982, Saudi Arabia.
2
College of Business Administration, Abu Dhabi University,
P.O. Box 59911,
Abu Dhabi, United Arab Emirates.
3
School of Engineering and Sciences, Tecnológico de Monterrey,
E. Garza Sada 2501 Sur,
C.P. 64849,
Monterrey,
Nuevo León, México
* Corresponding author: e-mail: lecarden@itesm.mx
Received:
10
January
2017
Accepted:
7
September
2017
M. Khan and M.Y. Jaber, Optimal inventory cycle in a two-stage supply chain incorporating imperfect items from suppliers. Int. J. Oper. Res. 10 (2011) 442–457, have addressed a two level supply chain of defective items. They compared three coordination mechanisms, i.e. cycle time; K–multiplier cycle time; and 2K–multiplier cycle time. This paper proposes a simpler algebraic solution for the K–multiplier cycle time mechanism without the use of differential calculus. The two level supply chain with defective items is illustrated with a numerical example. A sensitivity analysis is also provided.
Mathematics Subject Classification: 90B05
Key words: Supply chain management / integer multipliers / without derivatives / algebraic method
© EDP Sciences, ROADEF, SMAI 2018
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.