Issue |
RAIRO-Oper. Res.
Volume 54, Number 6, November-December 2020
|
|
---|---|---|
Page(s) | 1723 - 1756 | |
DOI | https://doi.org/10.1051/ro/2019107 | |
Published online | 16 September 2020 |
Integrated production inventory model with variable production rate on quality of products involving probabilistic defective under variable setup cost
The Gandhigram Rural Institute (Deemed to be University), Gandhigram, Dindigul District, Tamil Nadu, India
* Corresponding author: hemapriya9194@gmail.com
Received:
21
January
2019
Accepted:
10
November
2019
A predetermined production rate in a supply chain model with economic production lot size is quite appropriate for this type of situations as production rate can be changed in some cases to fulfill demand of customers. This paper investigates an integrated production inventory model with variable production rate on quality of products involving probabilistic defective under variable setup cost. As a rate of production has a direct impact on system performance, the production rate is considered as a variable along with the production cost. This production process gone through a long run system as a result after some specific time the production gone out-of-control state due to different issues and produced defective items. In addition, we consider that the defective follows three types of probability distribution function such as, (i) uniform, (ii) triangular and (iii) beta distributions. Two types of lead time crashed concept considering in this model and also we consider three types of continuous probabilistic defective function to find the associated cost of the system. The main objective is to find an optimal solution for an order quantity, safety factor, production cost, setup cost and to analyze how the flexibility of the production rate affects the process quality. An efficient iterative algorithm is designed to obtain the optimal solution of the model numerically and sensitivity analysis table formulate to show the impact of different parameter.
Mathematics Subject Classification: 90B05
Key words: Production rate / quality management / probabilistic defective / inspection / lead time reduction
© EDP Sciences, ROADEF, SMAI 2020
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.