Free Access
Issue
R.A.I.R.O. Recherche opérationnelle
Volume 9, Number V3, 1975
Page(s) 41 - 55
DOI https://doi.org/10.1051/ro/197509V300411
Published online 06 February 2017
  • D. PATINKIN, Note on the allocation of output, Quater. J. Econ. août 1947, p. 651-657 et
  • D. PATINKIN, Multiple-plant firms, cartels and imperfect Competition, Quater. J. Econ., février 1947, p. 173-205.
  • LEONTIEF VASSILY, Multiple-plant furms: comment: Quater. J. Econ., août 1947, p. 650-651 .
  • G. HADLEY, Linear programming, Addison-Wesley, Reading, Mass., 1962. [MR: 135622] [Zbl: 0102.36304]
  • A. VASZONY, Scientific programming in business and industry, John Wiley, New York, 1958. [MR: 95081]
  • F. L. HITCHCOCK, The distribution of a product from several sources to numerous localities, J. Math. Phys., 1941, p. 224-250. [MR: 4469] [Zbl: 0026.33904] [JFM: 67.0528.04]
  • J. F. SHARP, J. C. SNYDER et J. H. GREENE, A decomposition algorithm for solving the multifacility production-transportation problem with non-linear production costs, Econometrica, Mai 1970, p. 490-506. [Zbl: 0205.21603]
  • G. B. DANTZIG et W. M. HIRSCH, The fixed charge problem, Research Memorandum, the Rand Corporation, 1er décembre 1954;
  • W. M. HIRSCH et A. J. HOFFMAN, Extreme varieties, concave fonctions, and the fixed charge problem, Comm. pure appl. Math., 1961, p. 355-369. [MR: 131816] [Zbl: 0111.06001]
  • R. E. BELLMAN et S. E. DREYFUS, La programmation dynamique et ses applications, traduit de l'américain, Dunod, Paris, 1965.
  • V. L. SMITH, Investment and production, Harvard University Press, Cambridge, Mass., 1961.
  • E. MALINVAUD, Leçons de théorie microéconomique, Dunod, Paris, 1969. [Zbl: 0174.51802]
  • E. MALINVAUD, Notes sur l'étude des procédures de planification, Rev. canad. d'économique, février 1968.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.