Free Access
Issue |
RAIRO-Oper. Res.
Volume 25, Number 3, 1991
|
|
---|---|---|
Page(s) | 341 - 358 | |
DOI | https://doi.org/10.1051/ro/1991250303411 | |
Published online | 06 February 2017 |
- 1. C. PRINS, Problèmes d'optimisation de ressources dans les systèmes de télécommunications par satellite utilisant l'A.M.R.T., Doctorat de l'Université Paris-VI, juin 1988. [Google Scholar]
- 2. C. PRINS et J. CARLIER, Resource Optimization in a T.D.M.A./D.S.I. System: the EUTELSAT Approach, 7th Int. Conf. on Digital Satellite Communications (ICDSC-7)Munich, mai, 1986, p. 511-518. [Google Scholar]
- 3. J. CARLIER et C. PRINS, Optimisation des plans de trame dans le système A.M.R.T./C.N.C. d'EUTELSAT, Ann. Télécommun., 1988 43, n° 9-10. [Google Scholar]
- 4. M. R. GAREY et D. S. JOHNSON, Computers and Intractability: a Guide to the Theory of NP-completeness, Freeman, San Francisco, 1979. [MR: 519066] [Zbl: 0411.68039] [Google Scholar]
- 5. S. KIRKPATRICK, C. D. GELATT et M.P. VECCHI, Optimization by Simulated Annealing, Science, 1983, 22, p. 671-680. [Zbl: 1225.90162] [MR: 702485] [Google Scholar]
- 6. D. S. JOHNSON, C. R. ARAGON, L. A. MCGEOCH et C. SCHEVON, Optimization by Simulated Annealing: an Experimental Evaluation, Oper. Res., 1989, 37, p. 865-892. [Zbl: 0698.90065] [Google Scholar]
- 7. R. L. GRAHAM, Bounds on Multiprocessing Time Anomalies, S.I.A.M. J. Appl. Math., 1969, 17, p. 416-429. [MR: 249214] [Zbl: 0188.23101] [Google Scholar]
- 8. M. R. GAREY et R. L. GRAHAM, Bounds for Multiprocessor Scheduling with Resource Constraints, S.I.A.M. J. on Comp., 1975, 4, p. 187-200. [MR: 378769] [Zbl: 0333.68041] [Google Scholar]
- 9. T. INUKAI, An Efficient SS/TDMA Time Slot Assignment Algorithm, I.E.E.E. Trans. Comm., 1979, 27, p. 1449-1455. [MR: 547877] [Google Scholar]
- 10. G. BONGIOVANNI, D. COPPERSMITH et C. K. WONG, An Optimum Time Slot Assignment Algorithm for a SS/TDMA System with Variable Number of Transponders, I.E.E.E. Trans. Comm., 1981, 29, p. 1025-1036. [MR: 613237] [Google Scholar]
- 11. C. A. KING, P. TRUSTY, J. JANKOWSKY, R. DUESING et P. ROACH, INTELSAT TDMA/DSI Burst Time Plan Development, Int. J. Satellite Comm., 1985, 3, p. 35-43. [Google Scholar]
- 12. M. MINOUX et C. BROUDER, Models and Algorithms for Optimal Traffic Assignment in SS/TDMA Switching Systems, Int. J. Satellite Comm., 1987, 5, p. 33-47. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.