Free Access
Issue |
RAIRO-Oper. Res.
Volume 55, Number 2, March-April 2021
|
|
---|---|---|
Page(s) | 1063 - 1076 | |
DOI | https://doi.org/10.1051/ro/2021053 | |
Published online | 06 May 2021 |
- H.K. Alfares and A.M. Ghaithan, EOQ and EPQ production-inventory models with variable holding cost: state-of-the-art review. Arab. J. Sci. Eng. 44 (2019) 1737–1755. [Google Scholar]
- M. Ben-Daya and M. Hariga, Economic lot scheduling problem with imperfect production processes. J. Oper. Res. Soc. 51 (2000) 875–881. [Google Scholar]
- A.K. Bhunia and A.A. Shaikh, A deterministic model for deteriorating items with displayed inventory level dependent demand rate incorporating marketing decisions with transportation cost. Int. J. Ind. Eng. Comput. 2 (2011) 547–562. [Google Scholar]
- A.K. Bhunia and A.A. Shaikh, A deterministic inventory model for deteriorating items with selling price dependent demand and three-parameter Weibull distributed deterioration. Int. J. Ind. Eng. Comput. 5 (2014) 497–510. [Google Scholar]
- A.K. Bhunia and A.A. Shaikh, An application of PSO in a two-warehouse inventory model for deteriorating item under permissible delay in payment with different inventory policies. Appl. Math. Comput. 256 (2015) 831–850. [Google Scholar]
- A.K. Bhunia, A.A. Shaikh and L.E. Cárdenas-Barrón, A partially integrated production-inventory model with interval valued inventory costs, variable demand and flexible reliability. Appl. Soft Comput. 55 (2017) 491–502. [Google Scholar]
- L.E. Cárdenas-Barrón, On optimal batch sizing in a multistage production system with rework consideration. Eur. J. Oper. Res. 196 (2009) 1238–1244. [Google Scholar]
- K.-J. Chung, The integrated inventory model with the transportation cost and two-level trade credit in supply chain management. Comput. Math. Appl. 64 (2012) 2011–2033. [Google Scholar]
- B.C. Das, B. Das and S.K. Mondal, Optimal transportation and business cycles in an integrated production-inventory model with a discrete credit period. Transp. Res. E Logist. Transp. Rev. 68 (2014) 1–13. [Google Scholar]
- A. Diabat, A.A. Taleizadeh and M. Lashgari, A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial back ordering for deteriorating items. J. Manuf. Syst. 45 (2017) 322–342. [Google Scholar]
- S.K. Goyal and L.E. Cárdenas-Barrón, Economic production quantity with imperfect production system. Ind. Eng. J. 34 (2005) 33–36. [Google Scholar]
- P.A. Hayek and M.K. Salameh, Production lot sizing with the reworking of imperfect quality items produced. Prod. Plan. Control 12 (2001) 584–590. [Google Scholar]
- C. Howard and J. Marklund, Evaluation of stock allocation policies in a divergent inventory system with shipment consolidation. Eur. J. Oper. Res. 211 (2011) 298–309. [Google Scholar]
- S. Jain, S. Tiwari, L.E. Cárdenas-Barrón, A.A. Shaikh and S.R. Singh, A fuzzy imperfect production and repair inventory model with time dependent demand, production and repair rates under inflationary conditions. RAIRO:OR 52 (2018) 217–239. [Google Scholar]
- M.A.A. Khan, A.A. Shaikh, G.C. Panda and I. Konstantaras, Two-warehouse inventory model for deteriorating items with partial backlogging and advance payment scheme. RAIRO:OR 53 (2018) 1691–1708. [Google Scholar]
- C. Krishnamoorthi and S. Panayappan, An EPQ model for an imperfect production system with rework and shortages. Int. J. Oper. Res. 17 (2013) 104–124. [Google Scholar]
- R. Levi, R. Roundy, D. Shmoys and M. Sviridenko, A constant approximation algorithm for the one-warehouse multi-retailer problem. Manage. Sci. 54 (2008) 763–776. [Google Scholar]
- R. Li, Y.-L. Chan, C.-T. Chang and L.E. Cárdenas-Barrón, Pricing and lot-sizing policies for perishable products with advance-cash-credit payments by a discounted cash-flow analysis. Int. J. Prod. Econ. 193 (2017) 578–589. [Google Scholar]
- C.-S. Lin, C.-H. Chen and D.E. Kroll, Integrated production-inventory models for imperfect production processes under inspection schedules. Comput. Ind. Eng. 44 (2003) 633–650. [Google Scholar]
- R. Mallick, A.K. Manna and S.K. Mondal, A supply chain model for imperfect production system with stochastic lead time demand. J. Manage. Anal. 5 (2018) 309–333. [Google Scholar]
- A.K. Manna, J.K. Dey and S.K. Mondal, Controlling GHG emission from industrial waste perusal of production inventory model with fuzzy pollution parameters. Int. J. Syst. Sci. Oper. Logist. 6 (2018) 368–393. [Google Scholar]
- A.K. Manna, J.K. Dey and S.K. Mondal, Effect of inspection errors on imperfect production inventory model with warranty and price discount dependent demand rate. RAIRO:OR 54 (2020) 1189–1213. [Google Scholar]
- A.H. Nobil, A.H.A. Sedigh and L.E. Cárdenas-Barrón, A generalized economic order quantity inventory model with shortage: case study of a poultry farmer. Arab. J. Sci. Eng. 44 (2018) 2653–2663. [Google Scholar]
- L.-Y. Ouyang and C.-T. Chang, Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging. Int. J. Prod. Econ. 144 (2013) 610–617. [Google Scholar]
- S. Pal and G.S. Mahapatra, A manufacturing-oriented supply chain model for imperfect quality with inspection errors, stochastic demand under rework and shortages. Comput. Ind. Eng. 106 (2017) 299–314. [Google Scholar]
- M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production process. IIE Trans. 18 (1986) 48–55. [Google Scholar]
- M.K. Salameh and M.Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2010) 59–64. [Google Scholar]
- S.S. Sana, An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201 (2010) 158–170. [Google Scholar]
- S.S. Sana, A production-inventory model of imperfect quality products in a three-layer supply chain. Decis. Support Syst. 50 (2011) 539–547. [Google Scholar]
- B. Sarkar, An inventory model with reliability in an imperfect production process. Appl. Math. Comput. 218 (2012) 4881–4891. [Google Scholar]
- B. Saroglu and E.A. Durmus, Manufacture and testing of air springs used in railway vehicles. Arab. J. Sci. Eng. 44 (2019) 7967–7977. [Google Scholar]
- N.H. Shah, M.Y. Jani and U. Chaudhari, Optimal replenishment time for retailer under partial upstream prepayment and partial downstream overdue payment for quadratic demand. Math. Comput. Model. Dyn. Syst. 24 (2017) 1–11. [Google Scholar]
- A.A. Shaikh, S.C. Das, A.K. Bhunia, G.C. Panda and M.A.A. Khan, A two-warehouse EOQ model with interval-valued inventory cost and advance payment for deteriorating item under particle swarm optimization. Soft Comput. 23 (2019) 13531–13546. [Google Scholar]
- A.A. Shaikh, L.E. Cárdenas-Barrón, A.K. Bhunia and S. Tiwari, An inventory model of a three parameter Weibull distributed deteriorating item with variable demand dependent on price and frequency of advertisement under trade credit. RAIRO: OR 53 (2019) 903–916. [Google Scholar]
- C.C. Sherbrooke, A multi-echelon technique for recoverable item control. Oper. Res. 16 (1968) 122–141. [Google Scholar]
- P. Supakar and S.K. Mahato, Fuzzy-stochastic advance payment inventory model having no shortage and with uniform demand using abc algorithm. Int. J. Appl. Comput. Math. 4 (2018) 107. [Google Scholar]
- A.A. Taleizadeh, Lot-sizing model with advance payment pricing and disruption in supply under planned partial backordering. Int. Trans. Oper. Res. 24 (2017) 783–800. [Google Scholar]
- A.A. Taleizadeh, D.W. Pentico, M.S. Jabalameli and M. Aryanezhad, An economic order quantity model with multiple partial prepayments and partial backordering. Math. Comput. Model. 57 (2013) 311–323. [Google Scholar]
- J.T. Teng, L.E. Cárdenas-Barrón, H.J. Chang, J. Wu and Y. Hu, Inventory lot-size policies for deteriorating items with expiration dates and advance payments. Appl. Math. Model. 40 (2016) 8605–8616. [Google Scholar]
- S. Tiwari, A.H. Nobil and L.E. Cárdenas-Barrón, Note on Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. Int. J. Appl. Comput. Math. 5 (2019) 83. [Google Scholar]
- W. Yang, F.T.S. Chan and V. Kumar, Optimizing replenishment polices using Genetic Algorithm for single-warehouse multi-retailer system. Expert Syst. Appl. 39 (2012) 3081–3086. [Google Scholar]
- J. Yu, B.R. Sarker, Q. Duan and B. Wu, Single-manufacturer, multi-retailer consignment policy for retailers’ generalized demand distributions. J. Oper. Res. Soc. 63 (2012) 1708–1719. [Google Scholar]
- A.X. Zhang, Optimal advance payment scheme involving fixed per-payment costs. Omega 24 (1996) 577–582. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.