Free Access
Issue
RAIRO-Oper. Res.
Volume 55, Number 3, May-June 2021
Page(s) 1291 - 1324
DOI https://doi.org/10.1051/ro/2021058
Published online 01 June 2021
  • S.P. Aggarwal and C.K. Jaggi, Ordering policies of deteriorating items under permissible delay in payments. J. Oper. Res. Soc. 46 (1995) 658–662. [Google Scholar]
  • A. Banu and S.K. Mondal, Analyzing an inventory model with two-level trade credit period including the effect of customers’ credit on the demand function using q-fuzzy number. Oper. Res. Int. J. 20 (2020) 1559–1587. [Google Scholar]
  • A. Banu and S.K. Mondal, An integrated inventory model with warranty dependent credit period under two policies of a manufacturer. Opsearch 55 (2018) 677–702. [Google Scholar]
  • K.J. Chung and L.E. Cárdenas-Barrón, The simplified solution procedure for deteriorating items under stock-dependent demand and two-level trade credit in the supply chain management. Appl. Math. Model. 37 (2013) 4653–4660. [Google Scholar]
  • B.C. Das, B. Das and S.K. Mondal, Integrated supply chain model for a deteriorating item with procurement cost dependent credit period. Comput. Ind. Eng. 64 (2013) 788–796. [Google Scholar]
  • B.C. Das, B. Das and S.K. Mondal, Optimal transportation and business cycles in an integrated production inventory model with a discrete credit period. Transport. Res. E-Log. 68 (2014) 1–13. [Google Scholar]
  • B.C. Das, B. Das and S.K. Mondal, An integrated production inventory model under interactive fuzzy credit period for deteriorating item with several markets. Appl. Soft. Comput. 28 (2015) 435–465. [Google Scholar]
  • C.Y. Dye and L.Y. Ouyang, A particle swarm optimization for solving joint pricing and lot-sizing problem with flactuating demand and trade credit financing. Comput. Ind. Eng. 60 (2011) 127–137. [Google Scholar]
  • B.C. Giri and T. Dohi, Inspection scheduling for imperfect production process under free repair warranty contract. Eur. J. Oper. Res. 183 (2007) 238–252. [Google Scholar]
  • S.K. Goyal, Economic order quanity under conditions of permissible delay in payments. J. Oper. Res. Soc. 36 (1985) 335–338. [Google Scholar]
  • S.K. Goyal and A. Gunasekaran, An integrated production-inventorymarketing model for deteriorating items. Comput. Ind. Eng. 28 (1995) 755–762. [Google Scholar]
  • F.W. Harris, Operations and Cost, Factory Management Series. A.W. Shaw Co. (1915). [Google Scholar]
  • K.L. Hou, An EPQ model with setup cost and process quality as functions of capital expenditure. Appl. Math. Model. 31 (2007) 10–17. [Google Scholar]
  • Y.F. Huang, Optimal retailer’s ordering policies in the EOQ model under trade credit financing. J. Oper. Res. Soc. 54 (2003) 1011–1015. [Google Scholar]
  • M. Karimi-Nasab and K. Sabri-Laghaie, Developing approximate algorithms for EPQ problem with process compressibility and random error in production inspection. Int. J. Prod. Res. 52 (2014) 2388–2421. [Google Scholar]
  • N. Kazemi, S.H. Abdul-Rashid, E. Shekarian, E. Bottani and R. Montanari, A fuzzy lot-sizing problem with two-stage composite human learning. Int. J. Prod. Res. 54 (2016) 5010–5025. [Google Scholar]
  • M. Khan, M.Y. Jaber, A.L. Guiffrida and S. Zolfaghari, A review of the extensions of a modified EOQ model for imperfect quality items. Int. J. Prod. Econ. 132 (2011) 1–12. [Google Scholar]
  • J.J. Liao, An EOQ model with non-instantaneous receipt and exponentially deteriorating items under two-level trade credit. Int. J. Prod. Econ. 113 (2008) 852–861. [Google Scholar]
  • P. Mandal and B.C. Giri, A two-warehouse integrated inventory model with imperfect production process under stock-dependent demand and quantity discount offer. Int. J. Syst. Sci. 6 (2019) 15–26. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput. Ind. Eng. 104 (2017) 9–22. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Two layers green supply chain imperfect productioninventory model under bi-level credit period. Tekhne 15 (2017) 124–142. [Google Scholar]
  • A.K. Manna, B. Das and S. Tiwari, Impact of carbon emission on imperfect production inventory system with advance payment base free transportation. RAIRO: OR 54 (2020) 1103–1117. [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Effect of inspection errors on imperfect production inventory model with warranty and price discount dependent demand rate. RAIRO: OR 54 (2020) 1189–1213. [Google Scholar]
  • S. Panja and S.K. Mondal, Analyzing a four-layer green supply chain imperfect production inventory model for green products under type-2 fuzzy credit period. Comput. Ind. Eng. 129 (2019) 435–453. [Google Scholar]
  • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Trans. 18 (1986) 48–55. [Google Scholar]
  • M.K. Salameh and M.Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. [Google Scholar]
  • S.S. Sana, An economic production lot size model in an imperfect production system. Eur. J. Oper. Res. 201 (2010) 158–170. [Google Scholar]
  • E.A. Silver and R. Peterson, Decision Systems for Inventory Management and Production Planning, 2nd edition. Wiley, New York (1985). [Google Scholar]
  • N.H. Shah and L.E. Cardenas-Barron, Retailer’s decision for ordering and credit policies for deteriorating items when a supplier offers order-linked credit period or cash discount. Appl. Math. Comput. 259 (2015) 569–573. [Google Scholar]
  • E. Shekarian, C.H. Glock, S.M.P. Amiri and K. Schwindl, Optimal manufacturing lot size for a single-stage production system with rework in a fuzzy environment. J. Intell. Fuzy. Syst. 27 (2014) 3067–3080. [Google Scholar]
  • E. Shekarian, M.Y. Jaber, N. Kazemi and E. Ehsani, A fuzzifed version of the economic production quantity (EPQ) model with backorders and rework for a single-stage system. Eur. J. Ind. Eng. 8 (2014) 291–324. [Google Scholar]
  • E. Shekarian, E.U. Olugu, S.H. Abdul-Rashid and N. Kazemi, Analyzing optimization techniques in inventory models: the case of fuzzy economic order quantity problems. In: Proceedings of Conference on Industrial Engineering and Operations Management, Kuala Lumpur, Malaysia, March 8–10 (2016) 1229–1240. [Google Scholar]
  • E. Shekarian, N. Kazemi, S.H. Abdul-Rashid and E.U. Olugu, Fuzzy inventory models: a comprehensive review. Appl. Soft. Comput. 55 (2017) 588–621. [Google Scholar]
  • A.A. Taleizadeh, H.M. Wee and F. Jolai, Revisiting a fuzzy rough economic order quantity model for deteriorating items considering quantity discount and prepayment. Math. Comput. Model. 57 (2013) 1466–1479. [Google Scholar]
  • Y.C. Taso, Determination of production run time and warranty length under system maintenance and trade credits. Int. J. Syst. Sci. 43 (2012) 2312–2360. [Google Scholar]
  • J.T. Teng, On the economic order quantity under conditions of permissible delay in payments. J. Oper. Res. Soc. 53 (2002) 915–918. [Google Scholar]
  • H.J. Zimmermann, Fuzzy Set Theory and Its Applications, 2nd revised edition. Kluwer Academic Publishers, Dordrecht, The Netherlands (1991). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.