Open Access
Issue |
RAIRO-Oper. Res.
Volume 58, Number 3, May-June 2024
|
|
---|---|---|
Page(s) | 2143 - 2166 | |
DOI | https://doi.org/10.1051/ro/2024041 | |
Published online | 24 May 2024 |
- F.F.A. Ahmadian, A. Akbarnezhad, T.H. Rashidi and S.T. Waller, Accounting for transport times in planning off-site shipment of construction materials. J. Constr. Eng. Manage. 142 (2016) 04015050. [CrossRef] [Google Scholar]
- M.A. Bushuev, Delivery performance improvement in two-stage supply chain. Int. J. Prod. Econ. 195 (2018) 66–73. [CrossRef] [Google Scholar]
- M.A. Bushuev and A.L. Guiffrida, Optimal position of supply chain delivery window: concepts and general conditions. Int. J. Prod. Econ. 137 (2012) 226–234. [CrossRef] [Google Scholar]
- Y. Chen, G.E. Okudan and D.R. Riley, Sustainable performance criteria for construction method selection in concrete buildings. Autom. Constr. 19 (2010) 235–244. [CrossRef] [Google Scholar]
- R.K. Cho and Y. Gerchak, Supply chain coordination with downstream operating costs: coordination and investment to improve downstream operating efficiency. Eur. J. Oper. Res. 162 (2005) 762–772. [CrossRef] [Google Scholar]
- N. Comez-Dolgan, L. Moussawi-Haidar and M.Y. Jaber, A buyer-vendor system with untimely delivery costs: traditional coordination vs. vmi with consignment stock. Comput. Ind. Eng. 154 (2021) 19. [Google Scholar]
- E. Ekanayake, G.Q. Shen, M.M. Kumaraswamy and E.K. Owusu, Critical supply chain vulnerabilities affecting supply chain resilience of industrialized construction in Hong Kong. Eng. Constr. Arch. Manage. 28 (2020) 3041–3059. [Google Scholar]
- G.D. Eppen, Note – effects of centralization on expected costs in a multi-location newsboy problem. Manage. Sci. 25 (1979) 413–501. [Google Scholar]
- C.H. Glock, Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int. J. Prod. Econ. 136 (2012) 37–44. [CrossRef] [Google Scholar]
- A.L. Guiffrida and M.Y. Jaber, Managerial and economic impacts of reducing delivery variance in the supply chain. Appl. Math. Model. 32 (2008) 2149–2161. [CrossRef] [MathSciNet] [Google Scholar]
- A.L. Guiffrida and R. Nagi, Cost characterizations of supply chain delivery performance. Int. J. Prod. Econ. 102 (2006) 22–36. [CrossRef] [Google Scholar]
- J. Heydari, Lead time variation control using reliable shipment equipment: an incentive scheme for supply chain coordination. Transp. Res. Part E-Logistics Transp. Rev. 63 (2014) 44–58. [CrossRef] [Google Scholar]
- J. Heydari, P. Zaabi-Ahmadi and T.M. Choi, Coordinating supply chains with stochastic demand by crashing lead times. Comput. Oper. Res. 100 (2018) 394–403. [CrossRef] [MathSciNet] [Google Scholar]
- Y. Hu, Y. Guan and T. Liu, Lead-time hedging and coordination between manufacturing and sales departments using nash and stackelberg games. Eur. J. Oper. Res. 210 (2010) 231–240. [Google Scholar]
- Y.D. Huang, G.A. Widyadana, H.M. Wee and M.F. Blos, Revenue and risk sharing in view of uncertain demand during the pandemics. RAIRO: Oper. Res. 56 (2022) 1807–1821. [CrossRef] [EDP Sciences] [MathSciNet] [Google Scholar]
- L. Jaillon and C.S. Poon, Life cycle design and prefabrication in buildings: a review and case studies in Hong Kong. Autom. Constr. 39 (2014) 195–202. [CrossRef] [Google Scholar]
- M.M. Leng and A. Zhu, Side-payment contracts in two-person nonzero-sum supply chain games: review, discussion and applications. Eur. J. Oper. Res. 196 (2009) 600–618. [CrossRef] [Google Scholar]
- J.P. Leschke and E.N. Weiss, The multi-item setup-reduction investment-allocation problem with continuous investment-cost functions. Manage. Sci. 43 (1997) 890–894. [CrossRef] [Google Scholar]
- X. Li and Q. Wang, Coordination mechanisms of supply chain systems. Eur. J. Oper. Res. 179 (2007) 1–16. [CrossRef] [Google Scholar]
- C.Z. Li, R.Y. Zhong, F. Xue, G. Xu, K. Chen, G.G. Huang and G.Q. Shen, Integrating rfid and bim technologies for mitigating risks and improving schedule performance of prefabricated house construction. J. Cleaner Prod. 165 (2017) 1048–1062. [Google Scholar]
- H. Li, H. Luo, L. Ding and X. Zhang, Sustainable performance of just-in-time (JIT) management in time-dependent batch delivery scheduling of precast construction. J. Cleaner Prod. 193 (2018) 684–701. [Google Scholar]
- C. Liao and C. Shyu, An analytical determination of lead time with normal demand. Int. J. Oper. Prod. Manage. 11 (2009) 72–78. [Google Scholar]
- L.S. Pheng and C.J. Chuan, Just-in-time management of precast concrete components. J. Constr. Eng. Manage. 127 (2001) 494–501. [CrossRef] [Google Scholar]
- G. Polat, Factors affecting the use of precast concrete systems in the united states. J. Constr. Eng. Manage. 134 (2008) 169–178. [CrossRef] [Google Scholar]
- M. Poshdarsup, V.A. González, G.M. Raftery and F. Orozco, Characterization of process variability in construction. J. Constr. Eng. Manage. 140 (2014) 05014009. [CrossRef] [Google Scholar]
- M.D. Roy and S.S. Sana, Production rate and lot size-dependent lead time reduction strategies in a supply chain model with stochastic demand, controllable setup cost and trade-credit financing. RAIRO: Oper. Res. 55 (2020) S1469–S1485. [Google Scholar]
- M.D. Roy and B.R. Sarker, Optimizing a supply chain problem with nonlinear penalty costs for early and late delivery under generalized lead time distribution. Comput. Ind. Eng. 160 (2021) 107536. [CrossRef] [Google Scholar]
- P.A. Rubin and J.R. Carter, Joint optimality in buyer–supplier negotiations. J. Supply Chain Manage. 26 (1990) 20–26. [Google Scholar]
- S. Sarkar, S. Tiwari and B.C. Giri, Impact of uncertain demand and lead-time reduction on two-echelon supply chain. Ann. Oper. Res. 315 (2021) 2027–2055. [Google Scholar]
- L.B. Schwarz and Z.K. Weng, The design of a JIT supply chain: the effect of lead time uncertainty on safety stock. J. Bus. Logistics 21 (2000) 231–253. [Google Scholar]
- E.A. Silver and R. Peterson, Decision Systems for Inventory Management and Production Planning. John Wiley & Sons Inc (1985). [Google Scholar]
- V.W.Y. Tam, I.W.H. Fung, M.C.P. Sing and S.O. Ogunlana, Best practice of prefabrication implementation in the Hong Kong public and private sectors. J. Cleaner Prod. 109 (2015) 216–231. [CrossRef] [Google Scholar]
- Y. Tanai and A.L. Guiffrida, Reducing the cost of untimely supply chain delivery performance for asymmetric laplace distributed delivery. Appl. Math. Model. 39 (2015) 3758–3770. [CrossRef] [MathSciNet] [Google Scholar]
- L. Tao, S. Liu, N. Xie and S.A. Javed, Optimal position of supply chain delivery window with risk-averse suppliers: a CVaR optimization approach. Int. J. Prod. Econ. 232 (2021) 107989. [CrossRef] [Google Scholar]
- L. Xie, J. Ma and M. Goh, Supply chain coordination in the presence of uncertain yield and demand. Int. J. Prod. Res. 59 (2020) 4342–4358. [Google Scholar]
- X. Xu, Y. Zhao and C.Y. Chen, Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects. Ann. Oper. Res. 241 (2016) 225–247. [CrossRef] [MathSciNet] [Google Scholar]
- X.L. Xue, Q.P. Shen and Z.M. Ren, Critical review of collaborative working in construction projects: business environment and human behaviors. J. Manage. Eng. 26 (2010) 196–208. [CrossRef] [Google Scholar]
- Y. Zhai and T.C.E. Cheng, Lead-time quotation and hedging coordination in make-to-order supply chain. Eur. J. Oper. Res. 300 (2022) 449–460. [CrossRef] [Google Scholar]
- Y. Zhai, R.Y. Zhong and G.Q. Huang, Towards operational hedging for logistics uncertainty management in prefabrication construction. Ifac Papersonline 48 (2015) 1128–1133. [CrossRef] [Google Scholar]
- Y. Zhai, R.Y. Zhong, Z. Li and G. Huang, Production lead-time hedging and coordination in prefabricated construction supply chain management. Int. J. Prod. Res. 55 (2017) 3984–4002. [CrossRef] [Google Scholar]
- Y. Zhai, R.Y. Zhong and G.Q. Huang, Buffer space hedging and coordination in prefabricated construction supply chain management. Int. J. Prod. Econ. 200 (2018) 192–206. [CrossRef] [Google Scholar]
- Y. Zhai, K. Chen, J.S.X. Zhou, J. Cao, Z.Y. Lyu, X. Jin, G.Q.P. Shen, W.S. Lu and G.Q. Huang, An internet of things-enabled bim platform for modular integrated construction: a case study in Hong Kong. Adv. Eng. Inf. 42 (2019) 100997. [CrossRef] [Google Scholar]
- Y. Zhai, G.Y. Xu and G.Q. Huang, Buffer space hedging enabled production time variation coordination in prefabricated construction. Comput. Ind. Eng. 137 (2019) 106082. [CrossRef] [Google Scholar]
- Y. Zhai, T.M. Choi, S.J. Shao, S.X. Xu and G.Q. Huang, Spatial-temporal hedging coordination in prefabricated housing production. Int. J. Prod. Econ. 229 (2020) 107792. [CrossRef] [Google Scholar]
- P. Zhang, Y. He and C.M. Shi, Transshipment and coordination in a two-echelon supply chain. RAIRO: Oper. Res. 51 (2017) 729–747. [CrossRef] [EDP Sciences] [MathSciNet] [Google Scholar]
- H.P. Zipkin, Customer-order information, leadtimes, and inventories. Manage. Sci. 41 (1995) 1599–1607. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.