Open Access
Issue |
RAIRO-Oper. Res.
Volume 58, Number 5, September-October 2024
|
|
---|---|---|
Page(s) | 4395 - 4436 | |
DOI | https://doi.org/10.1051/ro/2024133 | |
Published online | 14 October 2024 |
- A. Agrawal, D. Garg, R. Sethi and A.K. Shrivastava, Optimum redundancy allocation using spider monkey optimization. Soft Comput. 27 (2023) 15595–15608. [CrossRef] [Google Scholar]
- N. Alikar, S.M. Mousavi, R.A.R. Ghazilla, M. Tavana and E.U. Olugu, Application of the nsga-ii algorithm to a multi-period inventory-redundancy allocation problem in a series-parallel system. Reliab. Eng. Syst. Saf. 160 (2017) 1–10. [CrossRef] [Google Scholar]
- N. Alikar, S.M. Mousavi, R.A.R. Ghazilla, M. Tavana and E.U. Olugu, A bi-objective multi-period series-parallel inventory-redundancy allocation problem with time value of money and inflation considerations. Comput. Ind. Eng. 104 (2017) 51–67. [CrossRef] [Google Scholar]
- M. Al-Salamah, Economic production quantity with the presence of imperfect quality and random machine break-down and repair based on the artificial bee colony heuristic. Appl. Math. Model. 63 (2018) 68–83. [CrossRef] [MathSciNet] [Google Scholar]
- M.A. Ardakan and A.Z. Hamadani, Reliability optimization of series–parallel systems with mixed redundancy strategy in subsystems. Reliab. Eng. Syst. Saf. 130 (2014) 132–139. [CrossRef] [Google Scholar]
- M.A. Ardakan and A.Z. Hamadani, Reliability–redundancy allocation problem with cold-standby redundancy strategy. Simul. Model. Pract. Theory 42 (2014) 107–118. [CrossRef] [Google Scholar]
- A. Banu and S.K. Mondal, An integrated inventory model with warranty dependent credit period under two policies of a manufacturer. Opsearch 55 (2018) 677–702. [Google Scholar]
- J.M. Betts, Minimizing inventory costs for capacity-constrained production using a hybrid simulation model. Procedia Comput. Sci. 29 (2014) 759–768. [CrossRef] [Google Scholar]
- A.S. Bhandari, A. Kumar and M. Ram, Grey wolf optimizer and hybrid pso-gwo for reliability optimization and redundancy allocation problem. Qual. Reliab. Eng. Int. 39 (2023) 905–921. [CrossRef] [Google Scholar]
- A.K. Bhunia, A.A. Shaikh and L.E. Cárdenas-Barrón, A partially integrated production-inventory model with interval valued inventory costs, variable demand and flexible reliability. Appl. Soft Comput. 55 (2017) 491–502. [Google Scholar]
- L.E. Cárdenas-Barrón, On optimal manufacturing batch size with rework process at single-stage production system. Comput. Ind. Eng. 53 (2007) 196–198. [CrossRef] [Google Scholar]
- N. Chakraborty, S. Mondal and M. Maiti, A deteriorating multi-item inventory model with price discount and variable demands via fuzzy logic under resource constraints. Comput. Ind. Eng. 66 (2013) 976–987. [CrossRef] [Google Scholar]
- A. Chambari, J. Sadeghi, F. Bakhtiari and R. Jahangard, A note on a reliability redundancy allocation problem using a tuned parameter genetic algorithm. Opsearch 53 (2016) 426–442. [CrossRef] [MathSciNet] [Google Scholar]
- S. Chiu, Y. Huang, Y. Chiu and T. Chiu, Satisfying multiproduct demand with a fpr-based inventory system featuring expedited rate and scraps. Int. J. Ind. Eng. Comput. 10 (2019) 443–452. [Google Scholar]
- D.W. Coit, Cold-standby redundancy optimization for nonrepairable systems. IIE Trans. 33 (2001) 471–478. [Google Scholar]
- B.C. Das, B. Das and S.K. Mondal, Optimal transportation and business cycles in an integrated production-inventory model with a discrete credit period. Transp. Res. E: Logist. Transp. Rev. 68 (2014) 1–13. [CrossRef] [Google Scholar]
- B.C. Das, B. Das and S.K. Mondal, An integrated production inventory model under interactive fuzzy credit period for deteriorating item with several markets. Appl. Soft Comput. 28 (2015) 453–465. [Google Scholar]
- K. Deb, Multi-objective Optimization Using Evolutionary Algorithms. John Wiley & Sons (2001). [Google Scholar]
- C. Franko, M. Ozkut and C. Kan, Reliability of coherent systems with a single cold standby component. J. Comput. Appl. Math. 281 (2015) 230–238. [CrossRef] [MathSciNet] [Google Scholar]
- H. Garg, Fuzzy multiobjective reliability optimization problem of industrial systems using particle swarm optimization. J. Ind. Math. (2013). [Google Scholar]
- H. Garg and S.P. Sharma, Reliability-redundancy allocation problem of pharmaceutical plant. J. Eng. Sci. Technol. 8 (2013) 190–198. [Google Scholar]
- H. Gholinezhad, A new model for reliability redundancy allocation problem with component mixing. Reliab. Eng. Syst. Saf. 242 (2024) 109815. [CrossRef] [Google Scholar]
- F. Grabski, 6-sm models of renewable cold standby system. In: Semi-Markov Processes: Applications in System Reliability and Maintenance (2015) 99–118. [CrossRef] [Google Scholar]
- P.P. Guilani, P. Azimi, S.T.A. Niaki and S.A.A. Niaki, Redundancy allocation problem of a system with increasing failure rates of components based on weibull distribution: A simulation-based optimization approach. Reliab. Eng. Syst. Saf. 152 (2016) 187–196. [CrossRef] [Google Scholar]
- W. Huang, J. Loman and T. Song, A reliability model of a warm standby configuration with two identical sets of units. Reliab. Eng. Syst. Saf. 133 (2015) 237–245. [CrossRef] [Google Scholar]
- A.M.M. Jamal, B.R. Sarker, and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system. Comput. Ind. Eng. 47 (2004) 77–89. [CrossRef] [Google Scholar]
- H. Kim and P. Kim, Reliability–redundancy allocation problem considering optimal redundancy strategy using parallel genetic algorithm. Reliab. Eng. Syst. Saf. 159 (2017) 153–160. [CrossRef] [Google Scholar]
- S.K. Mahato, L. Sahoo and A.K. Bhunia, Reliability-redundancy optimization problem with interval valued reliabilities of components via genetic algorithm. J. Inf. Comput. Sci. 7 (2012) 284–295. [Google Scholar]
- A. Maji, A.K. Bhunia and S.K. Mondal, Exploring a production-inventory model with optimal reliability of the production in a parallel-series system. J. Ind. Prod. Eng. 37 (2020) 71–86. [Google Scholar]
- A. Maji, A.K. Bhunia and S.K. Mondal, A production-reliability-inventory model for a series-parallel system with mixed strategy considering shortage, warranty period, credit period in crisp and stochastic sense. Opsearch 59 (2022) 862–907. [CrossRef] [MathSciNet] [Google Scholar]
- E.H. Mamdani and S. Assilian, An experiment in linguistic synthesis with a fuzzy logic controller. Int. J. Man-Machine Stud. 7 (1975) 1–13. [CrossRef] [Google Scholar]
- S. Mandal, K. Maity, S. Mondal and M. Maiti, Optimal production inventory policy for defective items with fuzzy time period. Appl. Math. Model. 34 (2010) 810–822. [CrossRef] [MathSciNet] [Google Scholar]
- A.K. Manna, B. Das, J.K. Dey and S.K. Mondal, Multi-item epq model with learning effect on imperfect production over fuzzy-random planning horizon. J. Manag. Anal. 4 (2017) 80–110. [Google Scholar]
- A.K. Manna, J.K. Dey and S.K. Mondal, Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput. Ind. Eng. 104 (2017) 9–22. [Google Scholar]
- A.K. Manna, J.K. Dey and S.K. Mondal, Two layers supply chain in an imperfect production inventory model with two storage facilities under reliability consideration. J. Ind. Prod. Eng. 35 (2018) 57–73. [Google Scholar]
- A.K. Manna, J.K. Dey and S.K. Mondal, Controlling ghg emission from industrial waste perusal of production inventory model with fuzzy pollution parameters. Int. J. Syst. Sci.: Oper. Logist. 6 (2019) 368–393. [Google Scholar]
- S.M. Mousavi, V. Hajipour, S.T.A. Niaki and N. Alikar, Optimizing multi-item multi-period inventory control system with discounted cash flow and inflation: two calibrated meta-heuristic algorithms. Appl. Math. Model. 37 (2013) 2241–2256. [CrossRef] [MathSciNet] [Google Scholar]
- S.M. Mousavi, N. Alikar, S.T.A. Niaki and A. Bahreininejad, Two tuned multi-objective meta-heuristic algorithms for solving a fuzzy multi-state redundancy allocation problem under discount strategies. Appl. Math. Model. 39 (2015) 6968–6989. [CrossRef] [MathSciNet] [Google Scholar]
- A. Mukherjee and A.S. Dhar, Real-time fault-tolerance with hot-standby topology for conditional sum adder. Microelectron. Reliab. 55 (2015) 704–712. [CrossRef] [Google Scholar]
- R. Nath and P.K. Muhuri, A novel evolutionary solution approach for many-objective reliability-redundancy allocation problem based on objective prioritization and constraint optimization. Reliab. Eng. Syst. Saf. 244 (2024) 109835. [CrossRef] [Google Scholar]
- Z. Ouyang, Y. Liu, S.J. Ruan and T. Jiang, An improved particle swarm optimization algorithm for reliability-redundancy allocation problem with mixed redundancy strategy and heterogeneous components. Reliab. Eng. Syst. Saf. 181 (2019) 62–74. [CrossRef] [Google Scholar]
- J. Sadeghi and S.T.A. Niaki, Two parameter tuned multi-objective evolutionary algorithms for a bi-objective vendor managed inventory model with trapezoidal fuzzy demand. Appl. Soft Comput. 30 (2015) 567–576. [CrossRef] [Google Scholar]
- J. Sadeghi, S. Sadeghi and S.T.A. Niaki, A hybrid vendor managed inventory and redundancy allocation optimization problem in supply chain management: An nsga-ii with tuned parameters. Comput. Oper. Res. 41 (2014) 53–64. [CrossRef] [MathSciNet] [Google Scholar]
- A. Salmasnia, E. Ameri and S.T.A. Niaki, A robust loss function approach for a multi-objective redundancy allocation problem. Appl. Math. Model. 40 (2016) 635–645. [CrossRef] [MathSciNet] [Google Scholar]
- T. Takagi and M. Sugeno, Fuzzy identification of systems and its applications to modeling and control. IEEE Trans. Syst. Man. Cybern. (1985) 116–132. [CrossRef] [Google Scholar]
- C.S. Tsou and C.H. Kao, Multi-objective inventory control using electromagnetism-like meta-heuristic. Int. J. Prod. Res. 46 (2008) 3859–3874. [CrossRef] [Google Scholar]
- Y. Tsukamoto, An approach to fuzzy reasoning method. Adv. Fuzzy Set Theory Appl. (1979). [Google Scholar]
- C.E. Wells, Reliability analysis of a single warm-standby system subject to repairable and nonrepairable failures. Eur. J. Oper. Res. 235 (2014) 180–186. [CrossRef] [Google Scholar]
- C. Yang, J. Gao and L. Sun, A multi-objective genetic algorithm for mixed-model assembly line rebalancing. Comput. Ind. Eng. 65 (2013) 109–116. [CrossRef] [Google Scholar]
- T. Zhang and M. Horigome, Availability and reliability of system with dependent components and time-varying failure and repair rates. IEEE Trans. Reliab. 50 (2001) 151–158. [CrossRef] [Google Scholar]
- Z. Zhang, L. Yang, Y. Xu, R. Zhu and Y. Cao, A novel reliability redundancy allocation problem formulation for complex systems. Reliab. Eng. Syst. Saf. 239 (2023) 109471. [CrossRef] [Google Scholar]
- E. Zio and H. Gholinezhad, Redundancy allocation of components with time-dependent failure rates. Mathematics 11 (2023) 3534. [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.