Open Access
Issue |
RAIRO-Oper. Res.
Volume 59, Number 4, July-August 2025
|
|
---|---|---|
Page(s) | 1959 - 1980 | |
DOI | https://doi.org/10.1051/ro/2025079 | |
Published online | 29 July 2025 |
- B.C. Archibald, Continuous review (s, S) policies with lost sales. Manage. Sci. 27 (1981) 1171–1177. [Google Scholar]
- K. Azoury and P.H. Brill, An application of the system-point method to inventory models under continuous review. J. Appl. Probab. 23 (1986) 778–789. [Google Scholar]
- K. Azoury and P.H. Brill, Analysis of net inventory in continuous review models with random lead time. Eur. J. Oper. Res. 59 (1992) 383–392. [Google Scholar]
- K.S. Azoury, J. Miyaoka and V. Udayabhanu, Steady state analysis of continuous review inventory systems: a level crossing approach. J. Supply Chain Oper. Manage. 10 (2012) 66–86. [Google Scholar]
- O. Baron, O. Berman and D. Perry, Continuous review inventory models for perishable items ordered in batches. Math. Methods Oper. Res. 72 (2010) 217–247. [Google Scholar]
- Y. Barron, P. Perry and W. Stadje, A jump-fluid production-inventory model with a double band control. Probab. Eng. Inf. Sci. 28 (2014) 313–333. [Google Scholar]
- O. Baron, O. Berman and D. Perry, Continuous review inventory models for perishable items with leadtimes. Probab. Eng. Inf. Sci. 34 (2020) 317–342. [Google Scholar]
- M. Bijvank and I.F.A. Vis, Lost-sales inventory theory: a review. Eur. J. Oper. Res. 215 (2011) 1–13. [Google Scholar]
- P.H. Brill, System point theory in exponential queues. PhD thesis, University of Toronto (1975). [Google Scholar]
- P.H. Brill, Level Crossing Methods in Stochastic Models, 2nd edition. Springer International Publishing (2017). [Google Scholar]
- P.H. Brill and K.S. Azoury, Analysis of net inventory in continuous review models with random lead time. Eur. J. Oper. Res. 59 (1992) 383–392. [Google Scholar]
- P.H. Brill, M.L. Huang and M. Hlynka, Note on an ≺s, S≻ inventory system with decay. IAENG Int. J. Appl. Math. 39 (2009) 171–174. [Google Scholar]
- D.J. Buchanan and R.F. Love, A (Q, R) inventory model with lost sales and Erlang distributed lead times. Nav. Res. Logistics Q. 32 (1985) 605–611. [Google Scholar]
- K. Govindan, Vendor-managed inventory: a review based on dimensions. Int. J. Prod. Res. 51 (2013) 3808–3835. [Google Scholar]
- S.K. Goyal and B.C. Giri, Recent trends in modeling of deteriorating inventory. Eur. J. Oper. Res. 134 (2001) 1–16. [Google Scholar]
- G. Hadley and T.M. Whitin, Analysis of Inventory Systems. Prentice-Hall, Englewood Cliffs, New York (1963). [Google Scholar]
- F.W. Harris, How many parts to make at once. Factory Mag. Manage. 10 (1913) 135–136, 152. [Google Scholar]
- J. Miyaoka and K.S. Azoury, Optimal and simple approximate solutions to a production-inventory system with two production rates. Int. J. Prod. Res. 62 (2024) 4165–4180. [Google Scholar]
- E. Mohebbi, Supply interruptions in a lost-sales inventory system with random lead time. Comput. Oper. Res. 30 (2003) 411–426. [Google Scholar]
- E. Mohebbi, A replenishment model for the supply-uncertainty problem. Int. J. Prod. Econ. 87 (2004) 25–37. [Google Scholar]
- E. Mohebbi, A production-inventory model with randomly changing environmental conditions. Eur. J. Oper. Res. 174 (2006) 539–552. [Google Scholar]
- E. Mohebbi, A note on a production control model for a facility with limited storage capacity in a random environment. Eur. J. Oper. Res. 190 (2008) 562–570. [Google Scholar]
- E. Mohebbi and D. Hao, When supplier’s availability affects the replenishment lead time-an extension of the supply-interruption problem. Eur. J. Oper. Res. 175 (2006) 992–1008. [Google Scholar]
- E. Mohebbi and D. Hao, An inventory model with non-resuming randomly interruptible lead time. Int. J. Prod. Econ. 114 (2008) 755–768. [Google Scholar]
- E. Mohebbi and M.J.M. Posner, A continuous-review inventory system with lost sales and variable lead time. Nav. Res. Logistics 45 (1998) 259–278. [Google Scholar]
- E. Mohebbi and M.J.M. Posner, Sole versus dual sourcing in a continuous-review inventory system with lost sales. Comput. Ind. Eng. 34 (1998) 321–336. [Google Scholar]
- E. Mohebbi and M.J.M. Posner, A lost-sales continuous-review inventory system with emergency ordering. Int. J. Prod. Econ. 58 (1999) 93–112. [Google Scholar]
- E. Mohebbi and M.J.M. Posner, Multiple replenishment orders in a continuous-review inventory system with lost sales. Oper. Res. Lett. 30 (2002) 117–129. [Google Scholar]
- S. Nahmias, Perishable inventory theory: a review. Oper. Res. 30 (1982) 680–708. [Google Scholar]
- A.D. Polyanin and A.V. Manzhirov, Handbook of Integral Equations, 2nd edition. Chapman and Hall/CRC, 2008. [Google Scholar]
- K. Preethi, A. Shophia Lawrence and B. Sivakumar, Lost sales obsolescence inventory systems with positive lead time: a system-point level-crossing approach. Probab. Eng. Inf. Sci. 37 (2023) 778–800. [Google Scholar]
- F. Raafat, Survey of literature on continuously deteriorating inventory models. J. Oper. Res. Soc. 42 (1991) 27–37. [Google Scholar]
- I. Sahin, On the stationary analysis of continuous review (s, S) inventory systems with constant lead times. Oper. Res. 27 (1979) 717–729. [Google Scholar]
- S.K. Srinivasan, General analysis of s − S inventory systems with random lead times and unit demands. J. Math. Phys. Sci. 13 (1979) 107–129. [Google Scholar]
- H.C. Tijms and H. Groenevelt, Simple approximations for the reorder point in periodic and continuous review (s, S) inventory systems with service level constraints. Eur. J. Oper. Res. 17 (1984) 175–190. [Google Scholar]
- K. Yan, Fluid models for production-inventory systems. PhD thesis, Department of Statistics and Operations Research, University of North Carolina, Chapel Hill, NC 27599 (2007). [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.