Open Access
Issue
RAIRO-Oper. Res.
Volume 59, Number 5, September-October 2025
Page(s) 2381 - 2404
DOI https://doi.org/10.1051/ro/2025099
Published online 05 September 2025
  • A.A. Arjana, M.M. Miah, M.S. Uddin, A.H.M. Mashud, H.M. Wee, S.S. Sana and H.M. Srivastava, A sustainable economic recycle quantity model for imperfect production system with shortages. J. Risk Finan. Manag. 14 (2021) 173. [Google Scholar]
  • D. Barman and G.C. Mahata, A single-manufacturing multi-retailer integrated inventory model for items with imperfect quality, price sensitive demand and planed back orders. RAIRO–Oper. Res. 55 (2021) 3459–3491. [Google Scholar]
  • P. Biswas and S.R. Schultz, An EPQ model for an imperfect production system with rework, scrap and backorder. Int. J. Ind. Syst. Eng. 37 (2021) 411–431. [Google Scholar]
  • L.E. Cárdenas-Barrón, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput. Ind. Eng. 57 (2009) 1105–1113. [Google Scholar]
  • R. Chakrabarty, T. Roy and K.S. Chaudhuri, A production-inventory model for defective items with shortages incorporating inflation and time value of money. Int. J. Appl. Comput. Math. 3 (2017) 195–212. [Google Scholar]
  • C.K. Chen and C.C. Lo, Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages. Math. Comput. Model. 44 (2006) 319–331. [Google Scholar]
  • C.C. Chiou and L.H.C. Chen, Determining the optimal production policy for a system with imperfect production and shortage. Proc. Appl. Math. Mech. 7 (2007) 2060077–2060078. [Google Scholar]
  • R.R. Choudhury, S.K. Ghosh and K.S. Chaudhuri, The effect of imperfect production in an economic production lot size model. Int. J. Manag. Sci. Eng. Manag. 10 (2015) 288–296. [Google Scholar]
  • S.C. Das, A.M. Zidan, A.K. Manna, A.A. Shaikh and A.K. Bhunia, An application of preservation technology in inventory control system with price dependent demand and partial backlogging. Alex. Eng. J. 59 (2020) 1359–1369. [CrossRef] [Google Scholar]
  • S.K. De and G.C. Mahata, An EPQ model for three-layer supply chain with partial backordering and disruption: triangular dense fuzzy lock set approach. Sādhanā 44 (2019) 177. [Google Scholar]
  • S.K. De and G.C. Mahata, A production inventory supply chain model with partial backordering and disruption under triangular linguistic dense fuzzy lock set approach. Soft Comput. 24 (2020) 5053–5069. [Google Scholar]
  • S.K. De and G.C. Mahata, Solution of an imperfect-quality EOQ model with backorder under fuzzy lock leadership game approach. Int. J. Intell. Syst. (2020). [Google Scholar]
  • C.G. De-la-Cruz-Márquez, L.E. Cárdenas-Barrón and B. Mandal, An inventory model for growing items with imperfect quality when the demand is price sensitive under carbon emissions and shortages. Math. Probl. Eng. 2021 (2021) 6649048. [Google Scholar]
  • M. Dolai and S.K. Mondal, An imperfect production model with shortage and screening constraint under time varying demand. J. Ind. Manag. Optim. 15 (2024) 1183–1202. [Google Scholar]
  • M. Dolai, A. Banu and S.K. Mondal, Analyzing an imperfect production inventory model for green products considering learning effect on screening process under advertisement dependent credit period. J. Ind. Manag. Optim. 19 (2023) 1–29. [Google Scholar]
  • A. Duary, S. Das, M.G. Arif, K.M. Abualnaja, M.A.A. Khan, M. Zakarya and A.A. Shaikh, Advance and delay in payments with the price-discount inventory model for deteriorating items under capacity constraint and partially backlogged shortages. Alex. Eng. J. 61 (2022) 1735–1745. [CrossRef] [Google Scholar]
  • A. Eroglu and G. Ozdemir, An economic order quantity model with defective items and shortages. Int. J. Prod. Econ. 106 (2007) 544–549. [Google Scholar]
  • S. Ganesan and R. Uthayakumar, EPQ models for an imperfect manufacturing system considering warm-up production run, shortages during hybrid maintenance period and partial backordering. Adv. Ind. Manuf. Eng. 1 (2020) 100005. [Google Scholar]
  • P. Gautam, A. Kishore, A. Khanna and C.K. Jaggi, Strategic defect management for a sustainable green supply chain. J. Clean. Prod. 233 (2019) 226–241. [CrossRef] [Google Scholar]
  • P. Gautam, S. Maheshwari, A. Hasan, A. Kausar and C.K. Jaggi, Optimal inventory strategies for an imperfect production system with advertisement and price relevant demand under rework operation for defectives. RAIRO–Oper. Res. 56 (2022) 183–197. [Google Scholar]
  • M. Ghoreishi, G.W. Weber and A. Mirzazadeh, An inventory model for non-instantaneous deteriorating items with partial backlogging, permissible delay in payments, inflation- and selling price-dependent demand and customer returns. Ann. Oper. Res. 226 (2015) 221–238. [CrossRef] [MathSciNet] [Google Scholar]
  • B.C. Giri and B. Dash, Optimal batch shipment policy for an imperfect production system under price-, advertisement- and green-sensitive demand. J. Manag. Anal. 9 (2022) 86–119. [Google Scholar]
  • R. Guchhait, B.K. Dey, S. Bhuniya and B. Sarkar, Investment for process quality improvement and setup cost reduction in an imperfect production process with warranty policy and shortages. RAIRO–Oper. Res. 54 (2020) 251–266. [Google Scholar]
  • L.F. Hsu and J.T. Hsu, Economic production quantity (EPQ) models under an imperfect production process with shortages backordered. Int. J. Syst. Sci. 47 (2016) 852–867. [CrossRef] [Google Scholar]
  • C.W. Kang, M. Ullah, B. Sarkar, I. Hussain and R. Akhtar, Impact of random defective rate on lot size focusing work-in-process inventory in manufacturing system. Int. J. Prod. Res. 55 (2017) 1748–1766. [CrossRef] [Google Scholar]
  • A. Kannan, B. Kishore, B. Sarkar and C.K. Jaggi, Inventory and pricing decision for imperfect quality items with inspection errors, sales returns and partially back-orders under inflation. RAIRO–Oper. Res. 54 (2020) 287–306. [Google Scholar]
  • B. Khara, J.K. Dey and S.K. Mondal, Sustainable recycling in an imperfect production system with acceptance quality level dependent development cost and demand. Comput. Ind. Eng. 142 (2020) 106300. [Google Scholar]
  • U.K. Khedlekar and R.K. Tiwari, Imperfect production model for price sensitive demand with shortage. Reliab. Theory Appl. 13 (2018) 43–54. [Google Scholar]
  • M.-S. Kim, J.-S. Kim, B. Sarkar, M. Sarkar and M.W. Iqbal, An improved way to calculate imperfect items during long-run production in an integrated inventory model with backorders. J. Manuf. Syst. 47 (2018) 153–167. [CrossRef] [Google Scholar]
  • C. Krishnamoorthi and S. Panayappan, An EPQ model for an imperfect production system with rework and shortages. Int. J. Oper. Res. 17 (2013) 104–124. [Google Scholar]
  • H.H. Lee, M.J. Chandra and V.J. Deleveaux, Optimal batch size and investment in multistage production systems with scrap. Prod. Plan. Control 8 (1997) 586–596. [Google Scholar]
  • D. Madhusudan, A. Banu and S.K. Mondal, Imperfect production inventory model for green products considering learning effect on screening process under advertisement dependent credit period. J. Ind. Manag. Optim. (2022). [Google Scholar]
  • G.C. Mahata, S.K. De, K. Bhattacharya and S. Maity, Three-echelon supply chain model in an imperfect production system with inspection error, learning effect, and return policy under fuzzy environment. Int. J. Syst. Sci. Oper. Logist. 10 (2021) 1962427. [Google Scholar]
  • F. Mahato, C. Mahato and G.C. Mahata, Sustainable optimal production policies for an imperfect production system with trade credit under different carbon emission regulations. Environ. Dev. Sustain. 25 (2023) 10073–10099. [CrossRef] [Google Scholar]
  • A.K. Manna, J.K. Dey and S.K. Mondal, Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand. Comput. Ind. Eng. 104 (2017) 9–22. [Google Scholar]
  • U. Mishra, J.Z. Wu and B. Salrkar, A sustainable production-inventory model for a controllable carbon emissions rate under shortages. J. Clean. Prod. 256 (2020) 120268. [CrossRef] [Google Scholar]
  • U. Mishra, J.T. Aguileral, S. Tiwari and L.E. Cardenas Brron, Production inventory model for controllable deterioration rate with shortages. RAIRO–Oper. Res. 55 (2021) S3–S19. [Google Scholar]
  • P. Narang and P.K. De, An imperfect production-inventory model for reworked items with advertisement, time and price dependent demand for non-instantaneous deteriorating item using genetic algorithm. Int. J. Math. Oper. Res. 24 (2023) 53–77. [Google Scholar]
  • A.H. Nobil, A.H.A. Sedigh, S. Tiwari and H.M. Wee, An imperfect multi-item single-machine production system with shortage, rework, and scrap considering inspection, dissimilar deficiency levels, and non-zero setup times. Sci. Iran. 26 (2019) 557–570. [Google Scholar]
  • A.H. Nobil, A.H. Afshar Sedigh and B. Afshar-Nadjafi, Lot-sizing problem for a defective processing system with categorized items, backordering and pricing policy. J. Revenue Pricing Manag. 19 (2021) 255–265. [Google Scholar]
  • R. Ojha, B.D. Sarker and P. Biswas, An optimal batch size for an imperfect production system with quality assurance and rework. Int. J. Prod. Res. 45 (2007) 3191–3214. [Google Scholar]
  • B. Pal and S. Adhikari, Price-sensitive imperfect production inventory model with exponential partial backlogging. Int. J. Syst. Sci. Oper. Logist. 6 (2016) 27–41. [Google Scholar]
  • S. Pal and G.S. Mahapatra, A manufacturing-oriented supply chain model for imperfect quality with inspection errors, stochastic demand under rework and shortages. Comput. Ind. Eng. 106 (2017) 299–314. [Google Scholar]
  • S. Pal, G.S. Mahapatra and G.P. Samanta, A production inventory model for deteriorating item with ramp type demand allowing inflation and shortages under fuzziness. Econ. Model. 46 (2015) 334–345. [CrossRef] [Google Scholar]
  • W.L. Pearn, R.H. Su, M.W. Weng and C.H. Hsu, Optimal production run time for two-stage production system with imperfect processes and allowable shortages. Cent. Eur. J. Oper. Res. 19 (2010) 533–545. [Google Scholar]
  • E.L. Porteus, Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. [Google Scholar]
  • M.A. Rad, F. Khoshalhan and C.H. Glock, Optimal production and distribution policies for a two-stage supply chain with imperfect items and price-and advertisement-sensitive demand: a note. Appl. Math. Model. 57 (2018) 625–632. [Google Scholar]
  • M. Rahaman, S. Alam, R. Haque et al., An economic production quantity model for an imperfect production system with selling price, advertisement frequency and green-level dependent demand. Electron. Commer. Res. (2024). [Google Scholar]
  • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Trans. 18 (1986) 48–55. [Google Scholar]
  • C. Rout, R.S. Kumar, D. Chakraborty and A. Goswami, An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages: a Type-2 fuzzy approach. Opsearch 56 (2019) 657–688. [CrossRef] [MathSciNet] [Google Scholar]
  • C. Rout, D. Chakraborty and D. Goswami, An EPQ model for deteriorating items with imperfect production, two types of inspection errors and rework under complete backordering. Int. Game Theory Rev. 22 (2020) 2040011. [CrossRef] [MathSciNet] [Google Scholar]
  • M.K. Salameh and M.Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. [Google Scholar]
  • L.A. San-José, J. Sicilia, L.E. Cardenas-Barron and M. Gonzalez-de-la-Rosa, A sustainable inventory model for deteriorating items with power demand and full backlogging under a carbon emission tax. Int. J. Prod. Econ. 268 (2024) 109098. [Google Scholar]
  • T. Sekar and R. Uthayakumar, Optimization of an imperfect manufacturing system for deteriorating items with rework and shortage under inflation. Process Integr. Optim. Sustain. 2 (2018) 303–320. [Google Scholar]
  • C.K. Sivashankari and S. Panayappan, Production inventory model with reworking of imperfect production, scrap and shortages. Int. J. Manag. Sci. Eng. Manag. 9 (2014) 9–20. [Google Scholar]
  • C.K. Sivashankari, S. Sathishkumar, S.S. Sana and V. Choudri, Optimal pricing and production lot size policy for sustainable production inventory model for defective items with advertisement and Bertrand’s price-dependent demand. Int. J. Manag. Sci. Eng. Manag. (2024) 1–12. [Google Scholar]
  • C.K. Sivashankari and R. Valarmathi, Optimal pricing and production lot-size policies in imperfect production system with price-sensitive demand, reworking, scrap, and sales return. Oper. Res. Int. J. 23 (2023) 43. [Google Scholar]
  • E.W. Taft, The most economical production lot. Iron Age 101 (1918) 1410–1412. [Google Scholar]
  • A.A. Taleizadeh, A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering. Ann. Oper. Res. 261 (2018) 303–337. [Google Scholar]
  • A.A. Taleizadeh, L. Aliabadi and P. Thaichon, A sustainable inventory system with price-sensitive demand and carbon emissions under partial trade credit and partial backordering. Oper. Res. 22 (2022) 4471–4516. [Google Scholar]
  • A.K. Taleizadeh, M. Sadat, N. Alhoseiny, L.E. Cárdenas-Barrón and A. Amjadian, Optimization of price, lot size and backordered level in an EPQ inventory model with rework process. RAIRO–Oper. Res. (2023). [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.