Open Access
Issue
RAIRO-Oper. Res.
Volume 59, Number 6, November-December 2025
Page(s) 3749 - 3776
DOI https://doi.org/10.1051/ro/2025020
Published online 19 December 2025
  • O.G. Alsawafy and S.Z. Selim, Discrete production workstation with two types of imperfect items: determining the optimal promise time. Int. J. Syst. Sci. Oper. Logistics 10 (2023) 2180689. [Google Scholar]
  • L.E. Cárdenas-Barrón, On optimal manufacturing batch size with rework process at single-stage production system. Comput. Ind. Eng. 53 (2007) 196–198. [CrossRef] [Google Scholar]
  • L.E. Cárdenas-Barrón, Optimal manufacturing batch size with rework in a single-stage production system – a simple derivation. Comput. Ind. Eng. 55 (2008) 758–765. [Google Scholar]
  • L.E. Cárdenas-Barrón, Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Comput. Ind. Eng. 57 (2009) 1105–1113. [Google Scholar]
  • S. Das, M.A.A. Khan, E.E. Mahmoud, A.H. Abdel-Aty, K.M. Abualnaja and A.A. Shaikh, A production inventory model with partial trade credit policy and reliability. Alexandria Eng. J. 60 (2021) 1325–1338. [CrossRef] [Google Scholar]
  • S. Ganesan and R. Uthayakumar, An EPQ model for a single-machine multiproduct imperfect production system using a hybrid logarithmic barrier method. OPSEARCH 60 (2023) 1121–1152. [Google Scholar]
  • J. García-Laguna, L.A. San-José, L.E. Cárdenas-Barrón and J. Sicilia, The integrality of the lot size in the basic EOQ and EPQ models: applications to other production-inventory models. Appl. Math. Comput. 216 (2010) 1660–1672. [MathSciNet] [Google Scholar]
  • R. Haji and B. Haji, Optimal batch production for a single machine system with accumulated defectives and random rate of rework. J. Ind. Syst. Eng. 3 (2010) 243–256. [Google Scholar]
  • R. Haji and M. Mansuri, Optimum common cycle for scheduling a single-machine multiproduct system with a budgetary constraint. Prod. Planning Control 6 (1995) 151–156. [Google Scholar]
  • R. Haji, A. Haji, M. Sajadifar and S. Zolfaghari, Lot sizing with non-zero setup times for rework. J. Syst. Sci. Syst. Eng. 17 (2008) 230–240. [Google Scholar]
  • F. Hanssmann, Operations Research in Production and Inventory Control. Wiley (1962). [Google Scholar]
  • W.L. Hsu, On the general feasibility test of scheduling lot sizes for several products on one machine. Manage. Sci. 29 (1983) 93–105. [Google Scholar]
  • A.M.M. Jamal, B.R. Sarker and S. Mondal, Optimal manufacturing batch size with rework process at a single-stage production system. Comput. Ind. Eng. 47 (2004) 77–89. [CrossRef] [Google Scholar]
  • L.A. Johnson and D.C. Montgomery, Operations Research in Production Planning, Scheduling, and Inventory Control. Wiley (1974). [Google Scholar]
  • M. Khouja, The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate. IIE Trans. 32 (2000) 715–725. [Google Scholar]
  • W.N. Ma, D.C. Gong and G.C. Lin, An optimal common production cycle time for imperfect production processes with scrap. Math. Comput. Model. 52 (2010) 724–737. [Google Scholar]
  • S. Nahmias and T.L. Olsen, Production and Operations Analysis. Waveland Press (2015). [Google Scholar]
  • A.H. Nobil and A.A. Taleizadeh, A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auction. Int. J. Adv. Logistics 5 (2016) 141–152. [Google Scholar]
  • A.H. Nobil, A.H.A. Sedigh and L.E. Cárdenas-Barrón, A multi-machine multi-product EPQ problem for an imperfect manufacturing system considering utilization and allocation decisions. Expert Syst. App. 56 (2016) 310–319. [Google Scholar]
  • A.H. Nobil, M. Seifbarghy, A.H.A. Sedigh and D. Pishva, Considering discrete delivery ordering and shipment consolidation in a three-echelon supply chain with failure. Int. J. Adv. Oper. Manage. 8 (2016) 247–275. [Google Scholar]
  • A.H. Nobil, E. Nobil and L.E. Cárdenas-Barrón, Some observations to: lot sizing with non-zero setup times for rework. Int. J. Appl. Comput. Math. 3 (2017) 1511–1517. [Google Scholar]
  • A.H. Nobil, A.H. Afshar Sedigh and L.E. Cárdenas-Barrón, Multi-machine economic production quantity for items with scrapped and rework with shortages and allocation decisions. Sci. Iran. 25 (2018) 2331–2346. [Google Scholar]
  • A.H. Nobil, A.H. Afshar Sedigh, S. Tiwari and H.M. Wee, An imperfect multi-item single-machine production system with shortage, rework, and scrap considering inspection, dissimilar deficiency levels, and non-zero setup times. Sci. Iran. 26 (2019) 557–570. [Google Scholar]
  • A.H. Nobil, A. Kazemi and A.A. Taleizadeh, Single-machine lot scheduling problem for deteriorating items with negative exponential deterioration rate. RAIRO-Oper. Res. 53 (2019) 1297–1307. [Google Scholar]
  • A.H. Nobil, A.H.A. Sedigh and L.E. Cárdenas-Barrón, A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints. Ann. Oper. Res. 286 (2020) 265–301. [Google Scholar]
  • A.H. Nobil, A.H.A. Sedigh and L.E. Cárdenas-Barrón, Reorder point for the EOQ inventory model with imperfect quality items. Ain Shams Eng. J. 11 (2020) 1339–1343. [Google Scholar]
  • A.H. Nobil, S.T.A. Niaki, S.A.A. Niaki and L.E. Cárdenas-Barrón, An economic production quantity inventory model for multi-product imperfect production system with setup time/cost function. Revista de la Real Academia de Ciencias Exactas, Físicas y Naturales. Serie A. Matemáticas 116 (2022) 1–23. [Google Scholar]
  • A.H. Nobil, E. Nobil, A.H.A. Sedigh, L.E. Cárdenas-Barrón, D. Garza-Núñez, G. Treviño-Garza, A. Céspedes-Mota, I. de Jesús Loera-Hernández and N.R. Smith, Economic production quantity models for an imperfect manufacturing system with strict inspection. Ain Shams Eng. J. 15 (2024) 102714. [Google Scholar]
  • E. Nobil, L.E. Cárdenas-Barrón, D. Garza-Núñez, G. Treviño-Garza, A. Céspedes-Mota, I. de Jesús Loera-Hernández, N.R. Smith and A.H. Nobil, Sustainability inventory management model with warm-up process and shortage. Oper. Res. Perspect. 12 (2024) 100297. [Google Scholar]
  • S.H.R. Pasandideh, S.T.A. Niaki, A.H. Nobil and L.E. Cárdenas-Barrón, A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost. Int. J. Prod. Econ. 169 (2015) 203–214. [Google Scholar]
  • E.L. Porteus, Optimal lot sizing, process quality improvement and setup cost reduction. Oper. Res. 34 (1986) 137–144. [Google Scholar]
  • J. Rogers, A computational approach to the economic lot scheduling problem. Manage. Sci. 4 (1958) 264–291. [Google Scholar]
  • M.J. Rosenblatt and H.L. Lee, Economic production cycles with imperfect production processes. IIE Trans. 18 (1986) 48–55. [Google Scholar]
  • M.K. Salameh and M.Y. Jaber, Economic production quantity model for items with imperfect quality. Int. J. Prod. Econ. 64 (2000) 59–64. [Google Scholar]
  • B. Sarkar, L.E. Cárdenas-Barrón, M. Sarkar and M.L. Singgih, An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J. Manuf. Syst. 33 (2014) 423–435. [Google Scholar]
  • A. Santander-Mercado and M. Jubiz-Diaz, The economic lot scheduling problem: a survey. Int. J. Prod. Res. 54 (2016) 4973–4992. [Google Scholar]
  • S. Shafiee-Gol, M.M. Nasiri and A.A. Taleizadeh, Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework. OPSEARCH 53 (2016) 873–888. [Google Scholar]
  • N. Slack and A. Brandon-Jones, Essentials of Operations Management. Pearson UK (2018). [Google Scholar]
  • A.A. Taleizadeh, A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering. Ann. Oper. Res. 261 (2018) 303–337. [Google Scholar]
  • A. Taleizadeh, A.A. Najafi and S.T. Akhavan Niaki, Economic production quantity model with scrapped items and limited production capacity. Sci. Iran. 17 (2010) 58–69. [Google Scholar]
  • A.A. Taleizadeh, S.T.A. Niaki and A.A. Najafi, Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. J. Comput. Appl. Math. 233 (2010) 1834–1849. [Google Scholar]
  • A.A. Taleizadeh, H.M. Wee and S.J. Sadjadi, Multi-product production quantity model with repair failure and partial backordering. Comput. Ind. Eng. 59 (2010) 45–54. [Google Scholar]
  • A.A. Taleizadeh, S.J. Sadjadi and S.T.A. Niaki, Multiproduct EPQ model with single machine, backordering and immediate rework process. Eur. J. Ind. Eng. 5 (2011) 388–411. [CrossRef] [Google Scholar]
  • A.A. Taleizadeh, G.A. Widyadanab, H. Wee and J. Biabanid, Multi products single machine economic production quantity model with multiple batch size. Int. J. Ind. Eng. Comput. 2 (2011) 213–224. [Google Scholar]
  • A. Taleizadeh, L. Cárdenas-Barrón, J. Biabani and R. Nikousokhan, Multi products single machine EPQ model with immediate rework process. Int. J. Ind. Eng. Comput. 3 (2012) 93–102. [Google Scholar]
  • A.A. Taleizadeh, S.G. Jalali-Naini, H.M. Wee and T.C. Kuo, An imperfect multi-product production system with rework. Sci. Iran. 20 (2013) 811–823. [Google Scholar]
  • A.A. Taleizadeh, H.M. Wee and S.G. Jalali-Naini, Economic production quantity model with repair failure and limited capacity. Appl. Math. Model. 37 (2013) 2765–2774. [Google Scholar]
  • A.A. Taleizadeh, L.E. Cárdenas-Barrón and B. Mohammadi, A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process. Int. J. Prod. Econ. 150 (2014) 9–27. [CrossRef] [Google Scholar]
  • A.A. Taleizadeh, M. Yadegari and S.S. Sana, Production models of multiple products using a single machine under quality screening and reworking policies. J. Model. Manage. 14 (2019) 232–259. [Google Scholar]
  • A.A. Taleizadeh, R. Askari and I. Konstantaras, An optimization model for a manufacturing-inventory system with rework process based on failure severity under multiple constraints. Neural Comput. App. 34 (2022) 4221–4264. [Google Scholar]
  • S. Tiwari, A.H. Nobil, and L.E. Cárdenas-Barrón, Note on “Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint”. Int. J. Appl. Comput. Math. 5 (2019) 1–4. [CrossRef] [Google Scholar]
  • M.F. Wu, Y.S. Chiu and P.C. Sung, Optimization of a multi-product EPQ model with scrap and an improved multi-delivery policy. J. Eng. Res. 2 (2014) 1–16. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.