The Citing articles tool gives a list of articles citing the current article. The citing articles come from EDP Sciences database, as well as other publishers participating in CrossRef Cited-by Linking Program. You can set up your personal account to receive an email alert each time this article is cited by a new article (see the menu on the right-hand side of the abstract page).
This article has been cited by the following article(s):
Synchronizing production and delivery in flow shops with time-of-use electricity pricing
Humyun Fuad Rahman, Tom Servranckx, Ripon K. Chakrabortty, Mario Vanhoucke and Sondoss El Sawah Annals of Operations Research 345(1) 371 (2025) https://doi.org/10.1007/s10479-024-06430-6
A cooperative adaptive genetic algorithm for reentrant hybrid flow shop scheduling with sequence-dependent setup time and limited buffers
A critical review of planning and scheduling in steel-making and continuous casting in the steel industry
Myungho Lee, Kyungduk Moon, Kangbok Lee, Juntaek Hong and Michael Pinedo Journal of the Operational Research Society 75(8) 1421 (2024) https://doi.org/10.1080/01605682.2023.2265416
An iterated greedy matheuristic for scheduling in steelmaking-continuous casting process
Juntaek Hong, Kyungduk Moon, Kangbok Lee, Kwansoo Lee and Michael L. Pinedo International Journal of Production Research 60(2) 623 (2022) https://doi.org/10.1080/00207543.2021.1975839
Heuristics for the Hybrid Flow Shop Scheduling Problem with Sequence-Dependent Setup times
Liao Yong, Li Zhantao, Li Xiang, Peng Chenfeng and Gabriel Luque Mathematical Problems in Engineering 2022 1 (2022) https://doi.org/10.1155/2022/8682203
Unrelated parallel machines scheduling with dependent setup times in textile industry
A. Berthier, A. Yalaoui, H. Chehade, F. Yalaoui, L. Amodeo and C. Bouillot Computers & Industrial Engineering 174 108736 (2022) https://doi.org/10.1016/j.cie.2022.108736
Nested Bi-level metaheuristic algorithms for cellular manufacturing systems considering workers’ interest
Bardia Behnia, Babak Shirazi, Iraj Mahdavi and Mohammad Mahdi Paydar RAIRO - Operations Research 55 S167 (2021) https://doi.org/10.1051/ro/2019075
An Efficient Augmented Lagrange Multiplier Method for Steelmaking and Continuous Casting Production Scheduling