Multicriteria scheduling problems: a survey p. 143 V. T'kindt and J.-C. Billaut Published online: 15 August 2002 DOI: https://doi.org/10.1051/ro:2001109 AbstractPDF (236.5 KB)References
Minimizing the Earliness and Tardiness Cost of a Sequence of Tasks on a Single Machine p. 165 Philippe Chrétienne Published online: 15 August 2002 DOI: https://doi.org/10.1051/ro:2001110 AbstractPDF (229.1 KB)References
Resource allocation in a mobile telephone network: A constructive repair algorithm p. 189 Patrice Boizumault, Philippe David and Housni Djellab Published online: 15 August 2002 DOI: https://doi.org/10.1051/ro:2001111 AbstractPDF (209.4 KB)References
Semi-Definite positive Programming Relaxations for Graph Kn-Coloring in Frequency Assignment p. 211 Philippe Meurdesoif and Benoît Rottembourg Published online: 15 August 2002 DOI: https://doi.org/10.1051/ro:2001112 AbstractPDF (194.4 KB)References
Fast simulation for Road Traffic Network p. 229 Roberta Jungblut-Hessel, Brigitte Plateau, William J. Stewart and Bernard Ycart Published online: 15 August 2002 DOI: https://doi.org/10.1051/ro:2001108 AbstractPDF (264.2 KB)References
Extension of Reverse Elimination Method Through a Dynamic Management of the Tabu List p. 251 Saïd Hanafi and Arnaud Fréville Published online: 15 August 2002 DOI: https://doi.org/10.1051/ro:2001113 AbstractPDF (208.1 KB)References
Separable convexification and DCA techniques for capacity and flow assignment problems p. 269 P. Mahey, Thai Q. Phong and H. P.L. Luna Published online: 15 August 2002 DOI: https://doi.org/10.1051/ro:2001114 AbstractPDF (166.5 KB)References
The triangles method to build X-trees from incomplete distance matrices p. 283 Alain Guénoche and Bruno Leclerc Published online: 15 August 2002 DOI: https://doi.org/10.1051/ro:2001115 AbstractPDF (197.2 KB)References