RAIRO-Oper. Res.
Volume 29, Number 2, 1995
Page(s) 179 - 194
DOI https://doi.org/10.1051/ro/1995290201791
Published online 06 February 2017
  • 1. J. ADAMS, E. BALAS and D. ZAWACK, The shifting bottleneck procedure for job shop scheduling, Management Science, 1988, 34, pp. 391-401. [MR: 938771] [Zbl: 0637.90051] [Google Scholar]
  • 2. J. CARLIER, The one-machine sequencing problem, European Journal of Operational Research, 1982, 11, pp. 42-47. [MR: 671798] [Zbl: 0482.90045] [Google Scholar]
  • 3. C. CHU, A Branch-And-Bound algorithm to minimize Total Tardiness with Different Release Dates, Naval Research Logistics, 1992, 39, pp. 265-283. [MR: 1178859] [Zbl: 0762.90035] [Google Scholar]
  • 4. F. DELLA CROCE, G. MENGA, R. TADEI, M. CAVALOTTO and L. PETRI, Cellular control of manufacturing Systems, European Journal of Operational Research, 1993, 69, pp. 498-509. [Zbl: 0784.90034] [Google Scholar]
  • 5. F. DELLA CROCE, R. TADEI and G. VOLTA, A genetic algorithm for the job shop problem, to appear on Computers and Operations Research, 1994, 8. [Zbl: 0816.90081] [Google Scholar]
  • 6. M. DELL'AMICO and M. TRUBIAN, Applying tabu search to the job shop scheduling problem, Annals of Operations Research, 1993, 41, pp. 231-252. [Zbl: 0771.90056] [Google Scholar]
  • 7. E. FALKENAUER and S. BOUFFOIX, A Genetic Algorithm for Job Shop, Proceedings of the 1991 IEEE International Conference on Robotics and Automation, 1991, pp. 824-829. [Google Scholar]
  • 8. T. D. FRY, R. D. ARMSTRONG and J. H BLACKSTONE, Minimizing Weighted Absolute Deviation in Single Machine Scheduling, IIE Transactions, 1987, 4, vol. 19, pp. 445-450. [Google Scholar]
  • 9. M. R. GAREY and D. S. JOHNSON, Computers and Intractability: A Guide to the Theory of NP-Completeness, Freeman, SanFrancisco, 1979. [MR: 519066] [Zbl: 0411.68039] [Google Scholar]
  • 10. M. R. GAREY, R. E. TARJAN and G. T. WILFGONG, One-processor scheduling with symmetric earliness and tardiness penalties, Mathematics of Operations Research, 1988, 13, pp. 330-348. [MR: 942622] [Zbl: 0671.90033] [Google Scholar]
  • 11. F. GLOVER, Tabu Search, Part I, Orsa Journal on Computing, 1989, 1, 3, pp. 190-206. [Zbl: 0753.90054] [Google Scholar]
  • 12. F. GLOVER, Tabu Search, Part II, Orsa Journal on Computing, 1990, 2, 1, pp. 4-32. [Zbl: 0771.90084] [Google Scholar]
  • 13. D. J. HORROMT, P. B LUH and K. R. PATTIPATI, A practical approach to job shop scheduling problems, IEEE Transactions on Robotics and Automation, 1993, 1, vol 9, pp. 1-13. [Google Scholar]
  • 14. S. LAWRENCE, Resource constrained project scheduling: an experimental investigation of heuristic scheduling techniques, GSIA Carnegie Mellon University, 1984. [Google Scholar]
  • 15. S. R. LAWRENCE and T. E. MORTON, Resource-constrained Multi-project Scheduling with Tardy Costs: Comparing Myopic, Bottleneck and Resource Pricing heuristics, European Journal of Operational Research, 1993, 2, vol. 64, pp. 168-187. [Zbl: 0769.90050] [Google Scholar]
  • 16. M. MINOUX, Mathematical Programming: Theory and Algorithms, Wiley & Sons, 1986. [MR: 868279] [Zbl: 0602.90090] [Google Scholar]
  • 17. T. E. MORTON, S. KEKRE, S. R. LAWRENCE and S. RAJAGOPALAN, SCHED-STAR: A Price Based Shop Scheduling Module, Journal of Manufacturing and Operations Management, 1988, 1, pp. 131-181. [Google Scholar]
  • 18. T. E. MORTON and D. W. PENTICO, Heuristic Scheduling Systems, Wiley & Sons, 1993. [Google Scholar]
  • 19. R. NAKANO and T. YAMADA, Conventional Genetic Algorithm for Job Shop Problems, Proceedings of the 4th International Conference on Genetic Algorithms, San Diego, California, July 13-16, 1991, pp. 474-479. [Google Scholar]
  • 20. E. NOWICKI and C. SMUTNICKI, A fast Taboo Search algorithm for the Job Shop Problem, Internal Report, Polytechnic Institute of Wroclaw, Poland, 1993. [Zbl: 0880.90079] [Google Scholar]
  • 21. S. S. PANWALKER and W. ISKANDER, A Survey of scheduling rules, Operations Research, 1977, 25, pp. 45-61. [MR: 443969] [Zbl: 0369.90054] [Google Scholar]
  • 22. D. A. PIERRE and M. J. LOWE, Mathematical Programming via Augmented Lagrangians, Addison-Wesley, 1975. [Zbl: 0347.90048] [Google Scholar]
  • 23. B. ROY and B. SUSSMANN, Les Problèmes d'Ordonnancement avec Constraintes disjonctives, Note DS n. 9 bis, 1964, SEMA, Montrouge. [Google Scholar]
  • 24. P. J. M. VAN LAARHOVEN, E. H. L. AARTS and J. K. LENSTRA, Job Shop Scheduling by Simulated Annealing, Operations Research, 1992, 40, pp.113-125. [MR: 1152731] [Zbl: 0751.90039] [Google Scholar]
  • 25. F. WERNER and A. WINKLER, Insertion Techniques for the heuristic solution of the Job Shop Problem, Internal Report, Technical University Otto von Guericke, Magdeburg, Germany, 1992. [Zbl: 0833.90073] [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.