Free Access
Issue
RAIRO-Oper. Res.
Volume 55, 2021
Regular articles published in advance of the transition of the journal to Subscribe to Open (S2O). Free supplement sponsored by the Fonds National pour la Science Ouverte
Page(s) S1469 - S1485
DOI https://doi.org/10.1051/ro/2020112
Published online 02 March 2021
  • M. Ben-Daya and M. Hariga, Integrated single vendor single buyer model with stochastic demand and variable lead time. Int. J. Prod. Econ. 92 (2004) 75–80. [Google Scholar]
  • M. Bhattacharyya and S.S. Sana, A mathematical model on eco-friendly manufacturing system under probabilistic demand. RAIRO:OR 53 (2019) 1899–1913. [Google Scholar]
  • L.H. Chen and F.S. Kang, Coordination between vendor and buyer considering trade credit and items of imperfect quality. Int. J. Prod. Econ. 123 (2010) 52–61. [Google Scholar]
  • K.J. Chung and L.E. Cardenas-Barron, The simplified solution procedure for deteriorating items under stock-dependent demand and two-level trade credit in the supply chain management. Appl. Math. Model. 37 (2013) 4653–4660. [Google Scholar]
  • M. Das Roy, An EPQ model with variable production rate and markdown policy for stock and sales price sensitive demand with deterioration. Int. J. Eng. Sc. Math. 7 (2018) 260–268. [Google Scholar]
  • M. Das Roy, A nonlinear EOQ model for time-dependent demand, deterioration, shortages with inflation. Int. J. Manage. Technol. Eng. 8 (2018) 1574–1584. [Google Scholar]
  • M. Das Roy, Integrated supply chain model with setup cost reduction, exponential lead time crashing cost, rework and uncertain demand. Int. J. Res. Eng. Appl. Manage. 5 (2019) 752–757. [Google Scholar]
  • M. Das Roy, Combine effect of quality, setup and ordering cost control in a three-stage multi-item supply chain model with transportation discounts. Int. J. Anal. Exp. Mod. Anal. 12 (2020) 470–479. [Google Scholar]
  • M. Das Roy, Lead-time dependent ordering cost reduction and trade-credit: A supply chain model with stochastic demand and rework. Int. J. Rec. Tech. Eng. 8 (2020) 1–5. [Google Scholar]
  • M. Das Roy and S. Sana, Random sales price-sensitive stochastic demand: An imperfect production model with free repair warranty. J. Adv. Manage. Res. 14 (2017) 408–424. [Google Scholar]
  • M. Das Roy, S. Sana and K. Chaudhuri, A stochastic EPLS model with random price sensitive demand. Int. J. Manage. Sci. Eng. Manage. 5 (2010) 465–472. [Google Scholar]
  • M. Das Roy, S. Sana and K. Chaudhuri, An economic order quantity model of imperfect quality items with partial backlogging. Int. J. Syst. Sci. 42 (2011) 1409–1419. [Google Scholar]
  • M. Das Roy, S. Sana and K. Chaudhuri, An optimal shipment strategy for imperfect items in a stock-out situation. Math. Comput. Model. 54 (2011) 2528–2543. [Google Scholar]
  • M. Das Roy, S. Sana and K. Chaudhuri, An integrated producer–buyer relationship in the environment of EMQ and JIT production systems. Int. J. Prod. Res. 50 (2012) 5597–5614. [Google Scholar]
  • M. Das Roy, S. Sana and K. Chaudhuri, An economic production lot size model for defective items with stochastic demand, backlogging and rework. IMA J. Manage. Math. 25 (2014) 159–183. [Google Scholar]
  • B.K. Dey, S. Pareek, M. Tayyab and B. Sarkar, Autonomation policy to control work-in-process inventory in a smart production system. To appear in: Int. J. Prod. Res. (2020). DOI: 10.1080/00207543.2020.1722325. [Google Scholar]
  • C.H. Glock, Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int. J. Prod. Econ. 136 (2012) 37–44. [Google Scholar]
  • Y.C. Hsiao, A note on integrated single vendor single buyer model with stochastic demand and variable lead time. Int. J. Prod. Econ. 114 (2008) 294–297. [Google Scholar]
  • C.K. Huang, D.M. Tsai, J.C. Wu and K.J. Chung, An optimal integrated vendor–buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments. Int. J. Prod. Econ. 128 (2010) 445–451. [Google Scholar]
  • M.Y. Jaber and I.H. Osman, Coordinating a two-level supply chain with delay in payments and profit sharing. Comput. Ind. Eng. 50 (2006) 385–400. [Google Scholar]
  • U.S. Karmarker, Lot sizes, lead times and in-process inventories. Manage. Sci. 33 (1987) 409–418. [Google Scholar]
  • J.S. Kim and W.C. Benton, Lot size dependent lead times in a Q, R inventory system. Int. J. Prod. Res. 33 (1995) 41–58. [Google Scholar]
  • S.J. Kim and B. Sarkar, Supply chain model with stochastic lead time, trade-credit financing, and transportation discount. To appear in: Math. Prob. Eng. 2017 (2017) 6465912. [Google Scholar]
  • A. Khanna, P. Gautam, B. Sarkar and C.K. Jaggi, Integrated vendor–buyer strategies for imperfect production systems with maintenance and warranty policy. RAIRO:OR 54 (2020) 435–450. [Google Scholar]
  • M. Khouja and A. Mehrez, Economic production lot size model with variable production rate and imperfect quality. J. Oper. Res. Soc. 45 (1994) 1405–1417. [Google Scholar]
  • M. Lashgari, A.A. Taleizadeh and S.S. Sana, An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity. J. Ind. Manage. Opt. 12 (2016) 1091–1119. [Google Scholar]
  • J.Y. Lee, R.K. Cho and S.K. Paik, Supply chain coordination in vendor-managed inventory systems with stockout-cost sharing under limited storage capacity. Eur. J. Oper. Res. 248 (2016) 95–106. [Google Scholar]
  • Y. Li, X. Xu, X. Zhao, J.H.Y. Yeung and F. Ye, Supply chain coordination with controllable lead time and asymmetric information. Eur. J. Oper. Res. 217 (2012) 108–119. [Google Scholar]
  • C.J. Liao and C.H. Shyu, An analytical determination of lead time with normal demand. Int. J.Oper. Prod. Manage. 11 (1991) 72–78. [Google Scholar]
  • Y.J. Lin, An integrated vendor–buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Comput. Ind. Eng. 56 (2009) 1597–1606. [Google Scholar]
  • D.R. Mahapatra, S. Panda and S.S. Sana, Multi-choice and stochastic programming for transportation problem involved in supply of foods and medicines to hospitals with consideration of logistic distribution. RAIRO:OR 54 (2020) 1119–1132. [Google Scholar]
  • M.K. Maiti and M. Maiti, Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm. Eur. J.Oper. Res. 179 (2007) 352–371. [Google Scholar]
  • A.I. Malika and B. Sarkar, Disruption management in a constrained multi-product imperfect production system. J. Manuf. Sys. 56 (2020) 227–240. [Google Scholar]
  • L.Y. Ouyang and H.C. Chang, Lot size reorder point inventory model with controllable lead time and set-up cost. Int. J. Sys. Sci. 33 (2002) 635–642. [Google Scholar]
  • B. Pal, S.S. Sana and K. Chaudhuri, Two-echelon competitive integrated supply chain model with price and credit period dependent demand. Int. J. Syst. Sci. 47 (2016) 995–1007. [Google Scholar]
  • J.C.H. Pan and M.C. Lo, The learning effect on setup cost reduction for mixture inventory models with variable lead time. Asian Pac. J. Oper. Res. 25 (2008) 513–529. [Google Scholar]
  • E. Porteus, Optimal lot sizing, process quality improvement and setup cost reduction. Opers. Res. 34 (1986) 137–144. [Google Scholar]
  • B. Sarkar, Mathematical and analytical approach for the management of defective items in a multi-stage production system. J. Clean. Prod. 218 (2019) 896–919. [Google Scholar]
  • B. Sarkar and I. Moon, Improved quality, setup cost reduction, and variable backorder costs in an imperfect production process. Int. J. Prod. Econ. 155 (2014) 204–213. [Google Scholar]
  • B. Sarkar and M. Sarkar, How does an industry reduce waste and consumed energy within a multi-stage smart sustainable biofuel production system? J. Clean. Prod. 262 (2020) 121–200. [Google Scholar]
  • B. Sarkar, R. Guchhait, M. Sarkar and L.E. Cardenas-Barron, How does an industry manage the optimum cash flow within a smart production system with the carbon footprint and carbon emission under logistics framework? Int. J. Prod. Econ. 213 (2019) 243–257. [Google Scholar]
  • B. Sarkar, R. Guchhait, M. Sarkar, S. Pareek and N. Kim, Impact of safety factors and setup time reduction in a two-echelon supply chain management. Robot. Comput.-Integ. Manuf. 55 (2019) 250–258. [Google Scholar]
  • B.R. Sarker and E.R. Coates, Manufacturing setup cost reduction under variable lead times and finite opportunities for investment. Int. J. Prod. Econ. 49 (1997) 237–247. [Google Scholar]
  • N. Saxena, S.R. Singh and S.S. Sana, A green supply chain model of vendor and buyer for remanufacturing. RAIRO: OR 51 (2017) 1133–1150. [CrossRef] [Google Scholar]
  • N. Saxena, B. Sarkar and S.R. Singh, Selection of remanufacturing/production cycles with an alternative market: a perspective on waste management. J. Clean. Prod. 245 (2020) 118935. [Google Scholar]
  • M. Tayyab, J. Jemai, H. Lim and B. Sarkar, A sustainable development framework for a cleaner multi-item multi-stage textile production system with a process improvement initiative. J. Clean. Prod. 246 (2020) 119055. [Google Scholar]
  • S. Tiwari, S.S. Sana and S. Sarkar, Joint economic lot sizing model with stochastic demand and controllable lead-time by reducing ordering cost and setup cost. Rev. Real Acad. Ciencias Exactas Físicas Nat. Ser. 112 (2018) 1075–1099. [Google Scholar]
  • R. Uthayakumar and S. Priyan, Permissible delay in payments in the two-echelon inventory system with controllable setup cost and lead time under service level constraint. Int. J. Inf. Manage. Sci. 24 (2013) 193–211. [Google Scholar]
  • R. Udayakumar, K.V. Geetha and S.S. Sana, Economic ordering policy for non-instantaneous deteriorating items with price and advertisement dependent demand and permissible delay in payment under inflation. To appear in: Math. Meth. Appl. Sci. (2020) DOI: 10.1002/mma.6594. [Google Scholar]
  • H.M. Wee, J.F. Jong and J.C. Jiang, A note on a single-vendor and multiple buyers production-inventory policy for a deteriorating item. Eur. J. Oper. Res. 180 (2007) 1130–1134. [Google Scholar]
  • J.S. Yang and J.C.H. Pan, Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. Int. J. Prod. Res. 42 (2004) 853–863. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.