Open Access
Issue |
RAIRO-Oper. Res.
Volume 56, Number 6, November-December 2022
|
|
---|---|---|
Page(s) | 4145 - 4180 | |
DOI | https://doi.org/10.1051/ro/2022127 | |
Published online | 05 December 2022 |
- P.L. Abad and C. Jaggi, A joint approach for setting unit price and the length of the credit period for a seller when end demand is price sensitive. Int. J. Prod. Econ. 83 (2003) 115–122. [CrossRef] [Google Scholar]
- S. Aggarwal and C. Jaggi, Ordering policies of deteriorating items under permissible delay in payments. J. Oper. Res. Soc. 658–662 (1995). [Google Scholar]
- S.M. Aljazzar, M.Y. Jaber and S.K. Goyal, Coordination of a two-level supply chain (manufacturer–retailer) with permissible delay in payments. Int. J. Syst. Sci. Oper. Logist. 3 (2016) 176–188. [Google Scholar]
- A. Banerjee, A supplier’s pricing model under a customer’s economic purchasing policy. Omega 14 (1986) 409–414. [CrossRef] [Google Scholar]
- E. Bazan, M.Y. Jaber and S. Zanoni, Carbon emissions and energy effects on a two-level manufacturer-retailer closed-loop supply chain model with remanufacturing subject to different coordination mechanisms. Int. J. Prod. Econ. 183 (2017) 394–408. [CrossRef] [Google Scholar]
- R.L. Bregman, The effect of the timing of disbursements on order quantities. J. Oper. Res. Soc. 43 (1992) 971–977. [CrossRef] [Google Scholar]
- C.R. Carter and L.M. Ellram, Reverse logistics: a review of the literature and framework for future investigation. J. Bus. Logist. 19 (1998) 85. [Google Scholar]
- C.-T. Chang, L.-Y. Ouyang and J.-T. Teng, An EOQ model for deteriorating items under supplier credits linked to ordering quantity. Appl. Math. Model. 27 (2003) 983–996. [CrossRef] [Google Scholar]
- L.-H. Chen and F.-S. Kang, Integrated vendor–buyer cooperative inventory models with variant permissible delay in payments. Eur. J. Oper. Res. 183 (2007) 658–673. [CrossRef] [Google Scholar]
- L.-H. Chen and F.-S. Kang, Integrated inventory models considering permissible delay in payment and variant pricing strategy. Appl. Math. Model. 34 (2010) 36–46. [CrossRef] [MathSciNet] [Google Scholar]
- M.-S. Chern, Q. Pan, J.-T. Teng, Y.-L. Chan and S.-C. Chen, Stackelberg solution in a vendor–buyer supply chain model with permissible delay in payments. Int. J. Prod. Econ. 144 (2013) 397–404. [CrossRef] [Google Scholar]
- M.-S. Chern, Y.-L. Chan, J.-T. Teng and S.K. Goyal, Nash equilibrium solution in a vendor–buyer supply chain model with permissible delay in payments. Comput. Ind. Eng. 70 (2014) 116–123. [CrossRef] [Google Scholar]
- R. Dekker, M. Fleischmann, K. Inderfurth and L.N. van Wassenhove, Reverse logistics: quantitative models for closed-loop supply chains. Springer Science & Business Media (2013). [Google Scholar]
- Y. Duan, J. Huo, Y. Zhang and J. Zhang, Two level supply chain coordination with delay in payments for fixed lifetime products. Comput. Ind. Eng. 63 (2012) 456–463. [CrossRef] [Google Scholar]
- A. Diabat, A.A. Taleizadeh and M. Lashgari, A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial backordering for deteriorating items. J. Manuf. Syst. 45 (2017) 322–342. [CrossRef] [Google Scholar]
- F. Goodarzian, H. Hosseini-Nasab, J. Muñuzuri and M.B. Fakhrzad, A multi-objective pharmaceutical supply chain network based on a robust fuzzy model: A comparison of meta-heuristics. Appl. Soft Comput. 92 (2020) 106331. [CrossRef] [Google Scholar]
- F. Goodarzian, S.F. Wamba, K. Mathiyazhagan and A. Taghipour, A new bi-objective green medicine supply chain network design under fuzzy environment: Hybrid metaheuristic algorithms. Comput. Ind. Eng. (2021) 107535. [CrossRef] [Google Scholar]
- F. Goodarzian, V. Kumar and P. Ghasemi, A set of efficient heuristics and meta-heuristics to solve a multi-objective pharmaceutical supply chain network. Comput. Ind. Eng. 158 (2021) 107389. [CrossRef] [Google Scholar]
- F. Goodarzian, A.A. Taleizadeh, P. Ghasemi and A. Abraham, An integrated sustainable medical supply chain network during COVID-19. Eng. Appl. Artif. Intell. 100 (2021) 104188. [CrossRef] [Google Scholar]
- S.K. Goyal, An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 15 (1977) 107–111. [Google Scholar]
- S.K. Goyal, Economic order quantity under conditions of permissible delay in payments. J. Oper. Res. Soc. (1985) 335–338. [CrossRef] [Google Scholar]
- S. Hemapriya and R. Uthayakumar, Two echelon supply chain with permissible delay in payments under exponential lead time involving investment for quality improvement and ordering cost reduction. Int. J. Serv. Oper. Manag. 36 (2020) 271–302. [Google Scholar]
- J. Heydari, M. Rastegar and C.H. Glock, A two-level delay in payments contract for supply chain coordination: The case of credit-dependent demand. Int. J. Prod. Econ. 191 (2017) 26–36. [CrossRef] [Google Scholar]
- M. Izadikhah and R. Farzipoor Saen, Developing a linear stochastic two-stage data envelopment analysis model for evaluating sustainability of supply chains: a case study in welding industry. Ann. Oper. Res. (2021) 1–21. [Google Scholar]
- M. Izadikhah, E. Azadi, M. Azadi, R. Farzipoor Saen and M. Toloo, Developing a new chance constrained NDEA model to measure performance of sustainable supply chains. Ann. Oper. Res. (2020) 1–29. [Google Scholar]
- M. Izadikhah, M. Azadi, M. Toloo and F.K. Hussain, Sustainably resilient supply chains evaluation in public transport: A fuzzy chance-constrained two-stage DEA approach. Appl. Soft Comput. 113 (2021) 107879. [CrossRef] [Google Scholar]
- M.Y. Jaber and I.H. Osman, Coordinating a two-level supply chain with delay in payments and profit sharing. Comput. Ind. Eng. 50 (2006) 385–400. [Google Scholar]
- A. Jamal, B. Sarker and S. Wang, An ordering policy for deteriorating items with allowable shortage and permissible delay in payment. J. Oper. Res. Soc. 48 (1997) 826–833. [CrossRef] [Google Scholar]
- A. Korugan and S.M. Gupta, A multi-echelon inventory system with returns. Comput. Ind. Eng. 35 (1998) 145–148. [CrossRef] [Google Scholar]
- M. Lashgari, A.A. Taleizadeh and A. Ahmadi, Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain. Ann. Oper. Res. 238 (2016) 329–354. [Google Scholar]
- H.-S. Lau and A.H.-L. Lau, The effect of cost disbursement timings in inventory control. J. Oper. Res. Soc. 44 (1993) 739–740. [CrossRef] [Google Scholar]
- J.J. Liao, K.N. Huang, K.J. Chung, S.D. Lin, S.T. Chuang and H.M. Srivastava, Optimal ordering policy in an economic order quantity (EOQ) model for non-instantaneous deteriorating items with defective quality and permissible delay in payments. Revista de la Real Academia de Ciencias Exactas, Fsicas y Naturales. Serie A. Matemáticas 114 (2020) 1–26. [CrossRef] [Google Scholar]
- S. Mitra, Analysis of a two-echelon inventory system with returns. Omega 37 (2009) 106–115. [CrossRef] [Google Scholar]
- S. Nahmiasj and H. Rivera, A deterministic model for a repairable item inventory system with a finite repair rate. Int. J. Prod. Res. 17 (1979) 215–221. [CrossRef] [Google Scholar]
- L.-Y. Ouyang, C.-H. Ho and C.-H. Su, Optimal strategy for an integrated system with variable production rate when the freight rate and trade credit are both linked to the order quantity. Int. J. Prod. Econ. 115 (2008) 151–162. [Google Scholar]
- M. Salameh, N. Abboud, A. El-Kassar and R. Ghattas, Continuous review inventory model with delay in payments. Int. J. Prod. Econ. 85 (2003) 91–95. [CrossRef] [Google Scholar]
- S. Sarmah, D. Acharya and S. Goyal, Coordination and profit sharing between a manufacturer and a buyer with target profit under credit option. Eur. J. Oper. Res. 182 (2007) 1469–1478. [CrossRef] [Google Scholar]
- D.A. Schrady, A deterministic inventory model for reparable items. Nav. Res. Logist. 14 (1967) 391–398. [CrossRef] [Google Scholar]
- A.A. Taleizadeh, I. Shokr, I. Konstantaras and M. VafaeiNejad, Stock replenishment policies for a vendor-managed inventory in a retailing system. J. Retail. Consum. Serv. 55 (2020) 102137. [CrossRef] [Google Scholar]
- J.-T. Teng, K.-R. Lou and L. Wang, Optimal trade credit and lot size policies in economic production quantity models with learning curve production costs. Int. J. Prod. Econ. 155 (2014) 318–323. [CrossRef] [Google Scholar]
- I. Wangsa, Greenhouse gas penalty and incentive policies for a joint economic lot size model with industrial and transport emissions. Int. J. Ind. Eng. Comput. 8 (2017) 453–480. [Google Scholar]
- J. Wu and Y.-L. Chan, Lot-sizing policies for deteriorating items with expiration dates and partial trade credit to credit-risk customers. Int. J. Prod. Econ. 155 (2014) 292–301. [CrossRef] [Google Scholar]
- X.-L. Wu and J.-C. Zhou, Retailer’s Optimal Ordering Decision with Trade Credit Financing. Paper presented at the Proceedings of the 5th International Asia Conference on Industrial Engineering and Management Innovation (IEMI2014) (2015). [Google Scholar]
- Q. Zhang, M. Dong, J. Luo and A. Segerstedt, Supply chain coordination with trade credit and quantity discount incorporating default risk. Int. J. Prod. Econ. 153 (2014) 352–360. [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.