Open Access
Review
Issue
RAIRO-Oper. Res.
Volume 60, Number 3, May-June 2026
Page(s) 1325 - 1355
DOI https://doi.org/10.1051/ro/2026012
Published online 20 May 2026
  • F.Y. Adhisatya, T.J. Ai and D.C. Gong, Economic lot scheduling problem with two imperfect key modules. Proc. Manuf. 4 (2015) 30–37. [Google Scholar]
  • B. Akrami, B. Karimi and S.M. Hosseini, Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case. Appl. Math. Comput. 183 (2006) 634–645. [Google Scholar]
  • A. Alle, J.M. Pinto and L.G. Papageorgiou, The economic lot scheduling problem under performance decay. Ind. Eng. Chem. Res. 43 (2004) 6463–6475. [Google Scholar]
  • M. Bakker, J. Riezebos and R.H. Teunter, Review of inventory systems with deterioration since 2001. Eur. J. Oper. Res. 221 (2012) 275–284. [Google Scholar]
  • A. Banerjee, Simultaneous determination of multiproduct batch and full truckload shipment schedules. Int. J. Prod. Econ. 118 (2009) 111–117. [Google Scholar]
  • A. Banerjee, V.R. Pyreddy and S.L. Kim, Investment policy for multiple product setup reduction under budgetary and capacity constraints. Int. J. Prod. Econ. 45 (1996) 321–327. [Google Scholar]
  • F.G. Beck and C.H. Glock, The impact of batch shipments on the Economic Lot Scheduling Problem. Comput. Ind. Eng. 96 (2016) 126–139. [Google Scholar]
  • F.G. Beck and C.H. Glock, The economic lot scheduling problem: a content analysis. Int. J. Prod. Res. 58 (2020) 3437–3454. [Google Scholar]
  • F.G. Beck, K. Biel and C.H. Glock, Integration of energy aspects into the economic lot scheduling problem. Int. J. Prod. Econ. 209 (2019) 399–410. [Google Scholar]
  • M. Ben-Daya and M. Hariga, Economic lot scheduling problem with imperfect production processes. J. Oper. Res. Soc. 51 (2000) 875–881. [Google Scholar]
  • R. Bollapragada and U. Rao, Single-stage resource allocation and economic lot scheduling on multiple, non identical production lines. Manage. Sci. 45 (1999) 889–904. [Google Scholar]
  • E.E. Bomberger, A dynamic programming approach to a lot size scheduling problem. Manage. Sci. 12 (1966) 778–784. [Google Scholar]
  • K.E. Bourland and C.A. Yano, A comparison of solution approaches for the fixed-sequence economic lot scheduling problem. IIE Trans. 29 (1997) 103–108. [Google Scholar]
  • K.E. Bourland, M.J. Brown and C.A. Yano, The product cycling problem under increasing yield rates. IIE Trans. 29 (1997) 417–422. [Google Scholar]
  • P. Brander and R. Forsberg, Cyclic lot scheduling with sequence-dependent set-ups: a heuristic for disassembly processes. Int. J. Prod. Res. 43 (2005) 295–310. [Google Scholar]
  • J.J. Carreno, Economic lot scheduling for multiple products on parallel identical processors. Manage. Sci. 36 (1990) 348–358. [Google Scholar]
  • J. Casas-Liza, J.M. Pinto and L.G. Papageorgiou, Mixed integer optimization for cyclic scheduling of multiproduct plants under exponential performance decay. Chem. Eng. Res. Design 83 (2005) 1208–1217. [Google Scholar]
  • G.H. Chan and Y. Song, Rotation cycle schedulings for multi-item production systems. Eur. J. Oper. Res. 135 (2001) 361–372. [Google Scholar]
  • H.K. Chan, S.H. Chung and M.K. Lim, Recent research trend of economic-lot scheduling problems. J. Manuf. Technol. Manage. 24 (2013) 465–482. [Google Scholar]
  • C.K. Chan, F. Fang and A. Langevin, Single-vendor multi-buyer supply chain coordination with stochastic demand. Int. J. Prod. Econ. 206 (2018) 110–133. [Google Scholar]
  • Y.J. Chang and M.J. Yao, A genetic algorithm for solving the economic lot scheduling problem with reworks. J. Chin. Inst. Ind. Eng. 26 (2009) 411–425. [Google Scholar]
  • P. Chare and G. Schrader, A model for exponentially decaying inventories. J. Ind. Eng. 15 (1963) 238–243. [Google Scholar]
  • Y.S.P. Chiu, C.C. Huang, M.F. Wu and H.H. Chang, Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate. Econ. Modell. 35 (2013) 112–117. [Google Scholar]
  • Y.S.P. Chiu, H.D. Lin, F.T. Cheng and M.H. Hwang, Optimal common cycle time for a multi-item production system with discontinuous delivery policy and failure in rework. J. Sci. Ind. Res. 72 (2013) 435–440. [Google Scholar]
  • S.W. Chiu, C.T. Tseng, M.F. Wu and P.C. Sung, Multi-item EPQ model with scrap, rework and multi-delivery using common cycle policy. J. Appl. Res. Technol. 12 (2014) 615–622. [Google Scholar]
  • S.W. Chiu, S.W. Chen, C.K. Chang and Y.S.P. Chiu, Optimization of a multi-product intra-supply chain system with failure in rework. PloS One 11 (2016) e0167511. [Google Scholar]
  • Y.P. Chiu, K.W. Chiang, S.W. Chiu and M.S. Song, Simultaneous determination of production and shipment decisions for a multi-product inventory system with a rework process. Adv. Prod. Eng. Manage. 11 (2016) 141. [Google Scholar]
  • Y.S.P. Chiu, Y.T. Hsieh, J.S. Kuo and S.W. Chiu, A delayed differentiation multi-product FPR model with scrap and a multi-delivery policy – I: using single-machine production scheme. International Journal for Engineering Modelling 29 (2016) 37–52. [Google Scholar]
  • Y.P. Chiu, J.S. Kuo, S.W. Chiu and Y.T. Hsieh, Effect of delayed differentiation on a multiproduct vendor–buyer integrated inventory system with rework. Adv. Prod. Eng. Manage. 11 (2016) 333. [Google Scholar]
  • Y.S.P. Chiu, H.D. Lin, M.F. Wu and S.W. Chiu, Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system. Int. J. Ind. Eng. Comput. 9 (2018) 235–248. [Google Scholar]
  • S.W. Chiu, C.H.O.U. Chung-Li, L.I.N. Hong-Dar and M.H. Hwang, Exploration of a multi-product epq-based system with overtime and quality reassurance. Econ. Comput. Econ. Cybern. Stud. Res. 53 (2019) 77–94. [Google Scholar]
  • S.W. Chiu, Y. Huang, Y.S.P. Chiu and T. Chiu, Satisfying multiproduct demand with a FPR-based inventory system featuring expedited rate and scraps. Int. J. Ind. Eng. Comput. 10 (2019) 443–452. [Google Scholar]
  • Y.S.P. Chiu, V. Chiu, Y. Wang and M.H. Hwang, A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance. Int. J. Ind. Eng. Comput. 11 (2020) 509–524. [Google Scholar]
  • Y.S.P. Chiu, C.S. Wu, V. Chiu and P.C. Sung, Determining the optimal cycle length for a multiproduct EMQ problem considering rework and overtime options. J. King Saud Univ.-Eng. Sci. 32 (2020) 265–273. [Google Scholar]
  • Y.S.P. Chiu, V. Chiu, H.D. Lin and T. Chiu, Multiproduct fabrication-shipment decision making incorporating an accelerated rate and ensured product quality. Manage. Prod. Eng. Rev. 12 (2021) 33–44. [Google Scholar]
  • Y.S.P. Chiu, J.H. Jhan, V. Chiu and H.H. Chang, A multi-item manufacturing system with an outsourcer and random defective items. J. Appl. Res. Technol. 19 (2021) 364–378. [Google Scholar]
  • S. Choi and J.S. Noble, An integrated material flow system approach for determining the economic production quantity (EPQ). Int. J. Prod. Res. 38 (2000) 3485–3511. [Google Scholar]
  • M.R. Chowdhury and B.R. Sarker, Manufacturing batch size and ordering policy for products with shelf lives. Int. J. Prod. Res. 39 (2001) 1405–1426. [Google Scholar]
  • M. Das Roy and S.S. Sana, Multi-echelon green supply chain model with random defectives, remanufacturing and rework under setup cost reduction and variable transportation cost. Sādhanā 46 (2021) 211. [Google Scholar]
  • G. Dobson, The economic lot-scheduling problem: achieving feasibility using time-varying lot sizes. Oper. Res. 35 (1987) 764–771. [Google Scholar]
  • G. Dobson and C.A. Yano, Cyclic scheduling to minimize inventory in a batch flow line. Eur. J. Oper. Res. 75 (1994) 441–461. [Google Scholar]
  • S. Eilon, Scheduling for batch production. J. Inst. Prod. Eng. 36 (1957) 549–570. [Google Scholar]
  • M.K. El-Najdawi, A compact heuristic for common cycle lot-size scheduling in multi-stage, multi-product production processes. Int. J. Prod. Econ. 27 (1992) 29–41. [Google Scholar]
  • M. Elhafsi and S.X. Bai, The common cycle economic lot scheduling problem with backorders: benefits of controllable production rates. J. Global Optim. 10 (1997) 283–303. [Google Scholar]
  • S.E. Elmaghraby, The economic lot scheduling problem (ELSP): review and extensions. Manage. Sci. 24 (1978) 587–598. [Google Scholar]
  • D. Erlenkotter, Note – An early classic misplaced: Ford W. Harris’s economic order quantity model of 1915. Manage. Sci. 35 (1989) 898–900. [Google Scholar]
  • D. Erlenkotter, Ford Whitman Harris and the economic order quantity model. Oper. Res. 38 (1990) 937–946. [Google Scholar]
  • D. Erlenkotter, Ford Whitman Harris’s economical lot size model. Int. J. Prod. Econ. 155 (2014) 12–15. [Google Scholar]
  • A. Eynan, The benefits of flexible production rates in the economic lot scheduling problem. IIE Trans. 35 (2003) 1057–1064. [Google Scholar]
  • A. Federgruen and Z. Katalan, The stochastic economic lot scheduling problem: cyclical base-stock policies with idle times. Manage. Sci. 42 (1996) 783–796. [Google Scholar]
  • I. Ferretti, C.H. Glock and S. Zanoni, Integration of power energy aspects into the economic lot scheduling problem. Comput. Ind. Eng. 186 (2023) 109756. [Google Scholar]
  • G. Gallego, An extension to the class of easy economic lot scheduling problems. IIE Trans. 22 (1990) 189–190. [Google Scholar]
  • G. Gallego and I. Moon, Strategic investment to reduce setup times in the economic lot scheduling problem. Nav. Res. Logistics 42 (1995) 773–790. [Google Scholar]
  • G. Gallego and D.X. Shaw, Complexity of the ELSP with general cyclic schedules. IIE Trans. 29 (1997) 109–113. [Google Scholar]
  • S. Ganesan and R. Uthayakumar, An EPQ model for a single-machine multiproduct imperfect production system using a hybrid logarithmic barrier method. Opsearch 60 (2023) 1121–1152. [Google Scholar]
  • B.C. Giri and I. Moon, Note on an economic lot scheduling problem under budgetary and capacity constraints. Int. J. Prod. Econ. 91 (2004) 229–234. [Google Scholar]
  • B.C. Giri, I. Moon and W.Y. Yun, Scheduling economic lot sizes in deteriorating production systems. Nav. Res. Logistics 50 (2003) 650–661. [Google Scholar]
  • A. Goli and M. Alinaghian, A new mathematical model for production and delivery scheduling problem with common cycle in a supply chain with open-shop system. Int. J. Manuf. Technol. Manage. 34 (2020) 174–187. [Google Scholar]
  • A. Goli and S.M.R. Davoodi, Coordination policy for production and delivery scheduling in the closed loop supply chain. Prod. Eng. 12 (2018) 621–631. [Google Scholar]
  • J. Gonçalves and R.C. Leachman, A hybrid heuristic and linear programming approach to multi-product machine scheduling. Eur. J. Oper. Res. 110 (1998) 548–563. [Google Scholar]
  • D. Gupta, On the economic lot scheduling problem with backlogging: the common cycle approach. Oper. Res. Lett. 12 (1992) 101–109. [Google Scholar]
  • J. Hahm and C.A. Yano, The economic lot and delivery scheduling problem: models for nested schedules. IIE Trans. 27 (1995) 126–139. [Google Scholar]
  • J. Hahm and C.A. Yano, The economic lot and delivery scheduling problem: the common cycle case. IIE Trans. 27 (1995) 113–125. [Google Scholar]
  • R. Haji and B. Haji, Optimal batch production for a single machine system with accumulated defectives and random rate of rework. J. Ind. Syst. Eng. 3 (2010) 243–256. [Google Scholar]
  • R. Haji and M. Mansuri, Optimum common cycle for scheduling a single-machine multiproduct system with a budgetary constraint. Prod. Planning Control 6 (1995) 151–156. [Google Scholar]
  • R. Haji, A. Haji, M. Sajadifar and S. Zolfaghari, Lot sizing with non-zero setup times for rework. J. Syst. Sci. Syst. Eng. 17 (2008) 230–240. [Google Scholar]
  • Ç. Haksöz and M. Pinedo, Economic lot scheduling with resources in parallel. Int. J. Prod. Res. 49 (2011) 2625–2641. [Google Scholar]
  • F. Hanssmann, Operations Research in Production and Inventory Control. John Wiley and Sons, New York (1962) 254 p. [Google Scholar]
  • M.A. Hariga, Economic production-ordering quantity models with limited production capacity. Prod. Planning Control 9 (1998) 671–674. [Google Scholar]
  • S.A. Hasheminejad, K. Valipour and H. Khoshnood, Applied real-valued genetic algorithm for an extended model of economic lot, purchase and delivery scheduling problem. Int. Rev. Appl. Sci. Eng. 13 (2021) 197–207. [Google Scholar]
  • J.C. Hennet, A common cycle approach to lot-scheduling in multistage manufacturing systems. Prod. Planning Control 12 (2001) 362–371. [Google Scholar]
  • D.J. Hockstra, Simple policies in the economic lot scheduling problem with zero setup costs. Prod. Planning Control 8 (1997) 25–30. [Google Scholar]
  • M. Holmbom and A. Segerstedt, Economic order quantities in production: from Harris to economic lot scheduling problems. Int. J. Prod. Econ. 155 (2014) 82–90. [Google Scholar]
  • M. Holmbom, A. Segerstedt and E. Van der Sluis, A solution procedure for Economic Lot Scheduling Problems even in high utilisation facilities. Int. J. Prod. Res. 51 (2013) 3765–3777. [Google Scholar]
  • M.A. Hoque and B.G. Kingsman, Synchronization in common cycle lot size scheduling for a multi-product serial supply chain. Int. J. Prod. Econ. 103 (2006) 316–331. [Google Scholar]
  • A. Houshyar, Optimal cycle time in a multi-product single machine with unit load, and storage space considerations. Comput. Ind. 16 (1991) 197–208. [Google Scholar]
  • W.L. Hsu, On the general feasibility test of scheduling lot sizes for several products on one machine. Manage. Sci. 29 (1983) 93–105. [Google Scholar]
  • R.R. Inman, P.C. Jones and G. Gallego, Economic lot scheduling of fully loaded processes with external setups. Nav. Res. Logistics (NRL) 38 (1991) 699–713. [Google Scholar]
  • M. Jenabi, S.F. Ghomi, S.A. Torabi and B. Karimi, Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines. Appl. Math. Comput. 186 (2007) 230–245. [Google Scholar]
  • M.T. Jensen and M. Khouja, An optimal polynomial time algorithm for the common cycle economic lot and delivery scheduling problem. Eur. J. Oper. Res. 156 (2004) 305–311. [Google Scholar]
  • H. Jodlbauer and S. Reitner, Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system. Int. J. Prod. Econ. 136 (2012) 306–317. [CrossRef] [Google Scholar]
  • L.A. Johnson and D.C. Montgomery, Operations Research in Production Planning, Scheduling, and Inventory Control. Wiley (1974). [Google Scholar]
  • M. Khouja, The scheduling of economic lot sizes on volume flexible production systems. Int. J. Prod. Econ. 48 (1997) 73–86. [Google Scholar]
  • M. Khouja, A note on “deliberately slowing down output in a family production context”. Int. J. Prod. Res. 37 (1999) 4067–4077. [Google Scholar]
  • M. Khouja, The economic lot and delivery scheduling problem: common cycle, rework and variable production rate. IIE Trans. 32 (2000) 715–725. [Google Scholar]
  • B.N. Khoury, N.E. Abboud and M.M. Tannous, The common cycle approach to the ELSP problem with insufficient capacity. Int. J. Prod. Econ. 73 (2001) 189–199. [Google Scholar]
  • T. Kim and S.K. Goyal, Composite sourcing policy considering raw-material consumption. Int. J. Logistics Syst. Manage. 11 (2012) 535–549. [Google Scholar]
  • D. Kim, V.A. Mabert and P.A. Pinto, Integrative cycle scheduling approach for a capacitated flexible assembly system. Decis. Sci. 24 (1993) 126–147. [Google Scholar]
  • T. Kim, Y. Hong and S.Y. Chang, Joint economic procurement – production–delivery policy for multiple items in a single-manufacturer, multiple-retailer system. Int. J. Prod. Econ. 103 (2006) 199–208. [Google Scholar]
  • C. Koulamas, Application of ELSP solution techniques to the deterministic robotic scheduling problem. Int. J. Prod. Res. 33 (1995) 2933–2944. [Google Scholar]
  • H.W. Kuo and R.R. Inman, A practical heuristic for the group technology economic lot scheduling problem. Int. J. Prod. Res. 28 (1990) 709–722. [Google Scholar]
  • G.C. Lin, D.E. Kroll and C.J. Lin, Determining a common production cycle time for an economic lot scheduling problem with deteriorating items. Eur. J. Oper. Res. 173 (2006) 669–682. [Google Scholar]
  • M.A.N. Lopez and B.G. Kingsman, The economic lot scheduling problem: theory and practice. Int. J. Prod. Econ. 23 (1991) 147–164. [Google Scholar]
  • W.N. Ma, D.C. Gong and G.C. Lin, An optimal common production cycle time for imperfect production processes with scrap. Math. Comput. Modell. 52 (2010) 724–737. [Google Scholar]
  • R. Mallya, Multi-product scheduling on a single machine: a case study. Omega 20 (1992) 529–534. [Google Scholar]
  • R. Martinelli, F.C.M.Q. Mariano and C.B. Martins, Single machine scheduling in make to order environments: a systematic review. Comput. Ind. Eng. 169 (2022) 108190. [Google Scholar]
  • M. Mohammadi, S.N. Musa and A. Bahreininejad, Optimization of mixed integer nonlinear economic lot scheduling problem with multiple setups and shelf life using metaheuristic algorithms. Adv. Eng. Softw. 78 (2014) 41–51. [Google Scholar]
  • M. Mohammadi, S.N. Musa and A. Bahreininejad, Optimization of economic lot scheduling problem with backordering and shelf-life considerations using calibrated metaheuristic algorithms. Appl. Math. Comput. 251 (2015) 404–422. [Google Scholar]
  • I. Moon, A note of correction on “Multi-product scheduling on a single machine”. Omega 21 (1993) 597–599. [Google Scholar]
  • I. Moon, Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions. Int. J. Prod. Res. 32 (1994) 2795–2801. [Google Scholar]
  • D.H. Moon and D.P. Christy, Determination of optimal production rates on a single facility with dependent mold lifespan. Int. J. Prod. Econ. 54 (1998) 29–40. [Google Scholar]
  • I. Moon, G. Gallego and D. Simchi-Levi, Controllable production rates in a family production context. Int. J. Prod. Res. 29 (1991) 2459–2470. [Google Scholar]
  • I. Moon, J. Hahm and C. Lee, The effect of the stabilization period on the economic lot scheduling problem. IIE Trans. 30 (1998) 1009–1017. [Google Scholar]
  • I. Moon, B.C. Giri and K. Choi, Economic lot scheduling problem with imperfect production processes and setup times. J. Oper. Res. Soc. 53 (2002) 620–629. [Google Scholar]
  • I.K. Moon, B.C. Cha and H.C. Bae, Hybrid genetic algorithm for group technology economic lot scheduling problem. Int. J. Prod. Res. 44 (2006) 4551–4568. [Google Scholar]
  • L. Nafisah, R.A.M. Sinaga, A. Soepardi, M. Salma and I. Irianto, Optimizing multi-item EPQ under defect and rework: a case in the plastic molding industry. OPSI 18 (2025) 201–212. [Google Scholar]
  • M. Najafi, A. Ghodratnama and S.H.R. Pasandideh, Solving a Deterministic Multi-product Single-machine EPQ Model with Partial Backordering, Scrapped Products and Rework. Int. J. Supply Oper. Manage. 5 (2018) 11–27. [Google Scholar]
  • M. Najafi, A. Ghodratnama, S.H.R. Pasandideha and R. Tavakkoli-Moghaddamb, Bi-objective economic production quantity with partial backordering under uncertainty. Trans. A: Basics 37 (2024) 1408. [Google Scholar]
  • A.H. Nobil and A.A. Taleizadeh, A single machine EPQ inventory model for a multi-product imperfect production system with rework process and auction. Int. J. Adv. Logistics 5 (2016) 141–152. [Google Scholar]
  • A.H. Nobil, A.H.A. Sedigh and L.E. Cárdenas-Barrón, A multi-machine multi-product EPQ problem for an imperfect manufacturing system considering utilization and allocation decisions. Expert Syst. App. 56 (2016) 310–319. [Google Scholar]
  • A.H. Nobil, M. Seifbarghy, A.H.A. Sedigh and D. Pishva, Considering discrete delivery ordering and shipment consolidation in a three-echelon supply chain with failure. Int. J. Adv. Oper. Manage. 8 (2016) 247–275. [Google Scholar]
  • A.H. Nobil, E. Nobil and L.E. Cárdenas-Barrón, Some observations to: lot sizing with non-zero setup times for rework. Int. J. Appl. Comput. Math. 3 (2017) 1511–1517. [Google Scholar]
  • A.H. Nobil, A.H.A. Sedigh and L.E. Cárdenas-Barrón, Multi-machine economic production quantity for items with scrapped and rework with shortages and allocation decisions. Sci. Iran.: Trans. E Ind. Eng. 25 (2018) 2331–2346. [Google Scholar]
  • A.H. Nobil, A. Kazemi and A.A. Taleizadeh, Single-machine lot scheduling problem for deteriorating items with negative exponential deterioration rate. RAIRO-Oper. Res. 53 (2019) 1297–1307. [Google Scholar]
  • A.H. Nobil, A.H.A. Sedigh, S. Tiwari and H.M. Wee, An imperfect multi-item single machine production system with shortage, rework, and scrapped considering inspection, dissimilar deficiency levels, and non-zero setup times. Sci. Iran. Trans. E: Ind. Eng. 26 (2019) 557–570. [Google Scholar]
  • A.H. Nobil, A. Kazemi and A.A. Taleizadeh, Economic lot-size problem for a cleaner manufacturing system with warm-up period. RAIRO-Oper. Res. 54 (2020) 1495–1514. [Google Scholar]
  • A.H. Nobil, A.H.A. Sedigh and L.E. Cárdenas-Barrón, A multi-product single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints. Ann. Oper. Res. 286 (2020) 265–301. [Google Scholar]
  • A.H. Nobil, S.T.A. Niaki, S.A.A. Niaki and L.E. Cárdenas-Barrón, An economic production quantity inventory model for multi-product imperfect production system with setup time/cost function. Revista de la Real Academia de Ciencias Exactas, Físicas y Naturales. Serie A Matemáticas 116 (2022) 49. [Google Scholar]
  • E. Nobil, L.E. Cárdenas-Barrón, D. Garza-Núñez, G. Treviño-Garza, A. Céspedes-Mota, I. de Jesús Loera-Hernández, N.R. Smith and A.H. Nobil, Sustainability inventory management model with warm-up process and shortage. Oper. Res. Perspect. 12 (2024) 100297. [Google Scholar]
  • A.H. Nobil, E. Nobil, L.E. Cárdenas-Barrón, D. Garza-Núñez, G. Treviño-Garza, A. Céspedes-Mota, I. de Jesús Loera-Hernández and N.R. Smith, Economic lot scheduling problem under two different rework policies. RAIRO-Oper. Res. 59 (2025) 3749–3776. [Google Scholar]
  • S. Öner and T. Bilgiç, Economic lot scheduling with uncontrolled co-production. Eur. J. Oper. Res. 188 (2008) 793–810. [Google Scholar]
  • J. Ouenniche and F. Boctor, Sequencing, lot sizing and scheduling of several products in job shops: the common cycle approach. Int. J. Prod. Res. 36 (1998) 1125–1140. [Google Scholar]
  • E.A. Pacheco-Velázqueza and L.E. Cárdenas-Barrón, An economic production quantity inventory model with backorders considering the raw material costs. Sci. Iran. Trans. E Ind. Eng. 23 (2016) 736. [Google Scholar]
  • M. Parveen and T.V.V.L.N. Rao, Optimal cycle length and number of inspections in imperfect production processes with investment on setup cost reduction and quality improvement. Int. J. Manuf. Res. 4 (2009) 17–36. [Google Scholar]
  • S.H.R. Pasandideh, S.T.A. Niaki, A.H. Nobil and L.E. Cárdenas-Barrón, A multiproduct single machine economic production quantity model for an imperfect production system under warehouse construction cost. Int. J. Prod. Econ. 169 (2015) 203–214. [Google Scholar]
  • S. Ramani and N. Narayanan, Single facility, multi-item lot sizing under Just-in-Time and “cyclic scheduling for improvement”. Int. J. Prod. Econ. 26 (1992) 333–339. [Google Scholar]
  • J. Rogers, A computational approach to the economic lot scheduling problem. Manage. Sci. 4 (1958) 264–291. [Google Scholar]
  • Ü. Sa˘lam and A. Banerjee, Integrated multiproduct batch production and truck shipment scheduling under different shipping policies. Omega 74 (2018) 70–81. [Google Scholar]
  • E. Sangari, F. Jolai and M.S. Sangari, A novel fuzzy finite-horizon economic lot and delivery scheduling model with sequence-dependent setups. Complex Intell. Syst. 10 (2024) 7009–7031. [Google Scholar]
  • A. Santander-Mercado and M. Jubiz-Diaz, The economic lot scheduling problem: a survey. Int. J. Prod. Res. 54 (2016) 4973–4992. [Google Scholar]
  • M. Sebatjane, A.H. Nobil and E. Nobil, Cross-docking in retail: sustainable EOQ-based models for multi-item inventory systems with imperfect quality and stockouts under carbon cap-and-trade. Clean. Logistics Supply Chain 15 (2025) 100221. [Google Scholar]
  • S. Shafiee-Gol, M.M. Nasiri and A.A. Taleizadeh, Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework. Opsearch 53 (2016) 873–888. [Google Scholar]
  • S. Sharma, Optimal production policy with shelf life including shortages. J. Oper. Res. Soc. 55 (2004) 902–909. [Google Scholar]
  • V.A. Shirodkar, R. Sridharan and V.M. Pillai, Effective allocation of idle time in the group technology economic lot scheduling problem. Int. J. Prod. Res. 49 (2011) 7493–7513. [Google Scholar]
  • E.A. Silver, Deliberately slowing down output in a family production context. Int. J. Prod. Res. 28 (1990) 17–27. [Google Scholar]
  • E.A. Silver, D.F. Pyke and R. Peterson, Inventory Management and Production Planning and Scheduling. Vol. 3. Wiley, New York (1998), p. 30. [Google Scholar]
  • H. Sun, H.C. Huang and W. Jaruphongsa, Genetic algorithms for the multiple-machine economic lot scheduling problem. Int. J. Adv. Manuf. Technol. 43 (2009) 1251–1260. [Google Scholar]
  • A.A. Taleizadeh, A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering. Ann. Oper. Res. 261 (2018) 303–337. [Google Scholar]
  • A.A. Taleizadeh and H.M. Wee, Manufacturing system with immediate rework and partial backordering. Int. J. Adv. Oper. Manage. 7 (2015) 41–62. [Google Scholar]
  • A. Taleizadeh, A.A. Najafi and S.T.A. Niaki, Economic production quantity model with scrapped items and limited production capacity. Sci. Iran. Trans. E: Ind. Eng. 17 (2010) 58–69. [Google Scholar]
  • A.A. Taleizadeh, S.T.A. Niaki and A.A. Najafi, Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint. J. Comput. Appl. Math. 233 (2010) 1834–1849. [Google Scholar]
  • A.A. Taleizadeh, H.M. Wee and S.J. Sadjadi, Multi-product production quantity model with repair failure and partial backordering. Comput. Ind. Eng. 59 (2010) 45–54. [Google Scholar]
  • A.A. Taleizadeh, S.J. Sadjadi and S.T.A. Niaki, Multiproduct EPQ model with single machine, backordering and immediate rework process. Eur. J. Ind. Eng. 5 (2011) 388–411. [CrossRef] [Google Scholar]
  • A.A. Taleizadeh, G.A. Widyadanab, H.M. Wee and J. Biabani, Multi products single machine economic production quantity model with multiple batch size. Int. J. Ind. Eng. Comput. 2 (2011) 213–224. [Google Scholar]
  • A.A. Taleizadeh, L.E. Cárdenas-Barrón, J. Biabani and R. Nikousokhan, Multi products single machine EPQ model with immediate rework process. Int. J. Ind. Eng. Comput. 3 (2012) 93–102. [Google Scholar]
  • A.A. Taleizadeh, S.G. Jalali-Naini, H.M. Wee and T.C. Kuo, An imperfect multi-product production system with rework. Sci. Iran. 20 (2013) 811–823. [Google Scholar]
  • A.A. Taleizadeh, H.M. Wee and S.G. Jalali-Naini, Economic production quantity model with repair failure and limited capacity. Appl. Math. Modell. 37 (2013) 2765–2774. [Google Scholar]
  • A.A. Taleizadeh, L.E. Cárdenas-Barrón and B. Mohammadi, A deterministic multi product single machine EPQ model with backordering, scraped products, rework and interruption in manufacturing process. Int. J. Prod. Econ. 150 (2014) 9–27. [CrossRef] [Google Scholar]
  • A.A. Taleizadeh, M. Yadegari and S.S. Sana, Production models of multiple products using a single machine under quality screening and reworking policies. J. Modell. Manage. 14 (2019) 232–259. [Google Scholar]
  • A.A. Taleizadeh, B. Sarkar and M. Hasani, Delayed payment policy in multi-product single-machine economic production quantity model with repair failure and partial backordering. J. Ind. Manage. Optim. 16 (2020). [Google Scholar]
  • A.A. Taleizadeh, R. Askari and I. Konstantaras, An optimization model for a manufacturing-inventory system with rework process based on failure severity under multiple constraints. Neural Comput. App. 34 (2022) 4221–4264. [Google Scholar]
  • O. Tang and R. Teunter, Economic lot scheduling problem with returns. Prod. Oper. Manage. 15 (2006) 488–497. [Google Scholar]
  • R. Teunter, K. Kaparis and O. Tang, Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing. Eur. J. Oper. Res. 191 (2008) 1241–1253. [Google Scholar]
  • R. Teunter, O. Tang and K. Kaparis, Heuristics for the economic lot scheduling problem with returns. Int. J. Prod. Econ. 118 (2009) 323–330. [Google Scholar]
  • S. Tiwari, W. Ahmed and B. Sarkar, Multi-item sustainable green production system under trade-credit and partial backordering. J. Clean. Prod. 204 (2018) 82–95. [Google Scholar]
  • S. Tiwari, A.H. Nobil and L.E. Cárdenas-Barrón, Note on “Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint”. Int. J. Appl. Comput. Math. 5 (2019) 83. [Google Scholar]
  • S.A. Torabi, B. Karimi and S.F. Ghomi, The common cycle economic lot scheduling in flexible job shops: the finite horizon case. Int. J. Prod. Econ. 97 (2005) 52–65. [Google Scholar]
  • F. Van Den Broecke, H. Van Landeghem and E.H. Aghezzaf, An application of cyclical master production scheduling in a multi-stage, multi-product environment. Prod. Planning Control 16 (2005) 796–809. [Google Scholar]
  • R.R. Vemuganti, D. Dianich, M. Oblak and H. Dabbaghi, Constrained optimal production lot sizes for several products. Am. J. Math. Manage. Sci. 10 (1990) 199–228. [Google Scholar]
  • S. Viswanathan and S.K. Goyal, On “Manufacturing batch size and ordering policy for products with shelf lives”. Int. J. Prod. Res. 40 (2002) 1965–1970. [Google Scholar]
  • B.J. Wagner and D.J. Davis, A search heuristic for the sequence-dependent economic lot scheduling problem. Eur. J. Oper. Res. 141 (2002) 133–146. [Google Scholar]
  • T.M. Whitin, The Theory of Inventory Management. Princeton University Press, Princeton, NJ, USA (1953). [Google Scholar]
  • C. Yan, Y. Liao and A. Banerjee, Multi-product lot scheduling with backordering and shelf-life constraints. Omega 41 (2013) 510–516. [Google Scholar]
  • C.A. Yano, The product cycling problem in systems with uncertain production yields. IEEE Trans. Robot. Autom. 6 (1990) 640–651. [Google Scholar]
  • K.C. Ying, P. Pourhejazy and T.C. Huang, Exploring the development trajectory of single-machine production scheduling. Ann. Oper. Res. (2024) 1–26. [Google Scholar]
  • P.H. Zipkin, Computing optimal lot sizes in the economic lot scheduling problem. Oper. Res. 39 (1991) 56–63. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.