Open Access
Issue
RAIRO-Oper. Res.
Volume 60, Number 3, May-June 2026
Page(s) 1475 - 1485
DOI https://doi.org/10.1051/ro/2026034
Published online 09 June 2026
  • A. Agnetis, J.-C. Billaut, S. Gawiejnowicz, D. Pacciarelli and A. Soukhal, Multiagent Scheduling: Models and Algorithms. Springer-Verlag, Berlin (2014). [Google Scholar]
  • K.R. Baker, Scheduling the production of components at a common facility. IIE Trans. 20 (1988) 32–35. [Google Scholar]
  • K.R. Baker and J.C. Smith, A multiple-criterion model for machine scheduling. J. Sched. 6 (2003) 7–16. [CrossRef] [MathSciNet] [Google Scholar]
  • P. Brucker, Scheduling Algorithms, 3rd edition. Springer, Berlin (2001). [Google Scholar]
  • Z.C. Geng, J.J. Yuan and J.L. Yuan, Scheduling with or without precedence relations on a serial-batch machine to minimize makespan and maximum cost. Appl. Math. Comput. 332 (2018) 1–18. [Google Scholar]
  • A.E. Gerodimos, C.A. Glass and C.N. Potts, Scheduling the production of two-component jobs on a single machine. Eur. J. Oper. Res. 120 (2000) 250–259. [Google Scholar]
  • C. He, Y.X. Lin, and J.J. Yuan, Bicriteria scheduling of minimizing maximum lateness and makespan on a serial-batching machine. FCDS 33 (2008) 369–376. [Google Scholar]
  • C. He, X.M. Wang, Y.X. Lin and Y.D. Mu, An improved algorithm for a bicriteria batching scheduling problem. RAIRO Oper. Res. 47 (2013) 1–8. [Google Scholar]
  • C. He, H. Lin and Y.X. Lin, Bounded serial-batching scheduling for minimizing maximum lateness and makespan. Discrete Optim. 16 (2015) 70–75. [Google Scholar]
  • C. He, H. Lin and L. Li, Unbounded serial-batching scheduling on hierarchical optimization. JORSC 9 (2021) 909–914. [Google Scholar]
  • C. He, H. Lin and L. Li, Hierarchical minimization of two maximum costs on a bounded serial-batching machine. RAIRO Oper. Res. 55 (2021) 135–140. [Google Scholar]
  • C. He, J. Wu, H. Lin, Y. Zhang and Y. Zhao, The unbounded parallel-batching bicriteria scheduling with two-component jobs. JORSC (2024) 1–18. DOI: https://doi.org/10.1007/s40305-024-00545-0. [Google Scholar]
  • C. He, J. Wu, H. Guo, B.R. Sun, H. Lin and Y. Zhang, Bicriteria scheduling with two-component jobs on an unbounded series-batching machine. JORSC (2025), Accepted. [Google Scholar]
  • H. Hoogeveen, Multicriteria scheduling. Eur. J. Oper. Res. 167 (2005) 592–623. [CrossRef] [Google Scholar]
  • J.A. Hoogeveen, Single-machine scheduling to minimize a function of two or three maximum cost criteria. J. Algorithms 21 (1996) 415–433. [Google Scholar]
  • E.L. Lawler, Optimal sequencing of a single machine subject to precedence constraints. Manag. Sci. 19 (1973) 544–546. [Google Scholar]
  • Y.J. Li, Bicriteria fabrication scheduling of two component jobs on a single machine. Oper. Res. 23 (2023) 1–13. [Google Scholar]
  • Y.J. Li, Bounded scheduling two-component jobs simultaneously or hierarchically. RAIRO Oper. Res. 58 (2024) 1115–1130. [Google Scholar]
  • V. T'kindt and J.-C. Billaut, Multicriteria scheduling problems: a survey. RAIRO Oper. Res. 35 (2001) 143–163. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.