An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains
School of Computing and Information Technology, Wollongong University, NSW 2522 Wollongong Australia
* Corresponding author: reza@uow.edu.au
Received:
19
February
2018
Accepted:
11
January
2019
In this paper, an innovative four-layer heuristic is presented for scheduling multi-mode projects under multiple resource constraints. For this purpose, a biased-random sampling technique, a local search, a decomposition method, and an evolutionary search mechanism, each in a separate layer, are combined, with each layer passing its output to the next layer for improvement. The procedure has been designed based on the fact that what makes the scheduling of multi-mode projects hard to solve is a massive search space of modes compounded with the starting times of activities. That is why the procedure is aimed at balancing exploration versus exploitation in searching a massive search space. On the one hand, it exploits promising areas further and, on the other hand, it searches unexplored areas for expanding its range. Since the first layer provides an initial solution, and each of the other three layers can either improve the result of its previous layer or keep it unchanged, solutions never deteriorate and hence promising areas are exploited. Moreover, unexplored areas are searched effectively because each layer explores solution space differently than its previous layer. Based on whether or not an improvement each layer can make to the result of its previous layer, the effect of the corresponding layer on the performance of the procedure has been measured.
Mathematics Subject Classification: 90B50 / 90B35 / 90B40 / 90.08 / 68R05
Key words: Multi-mode recourse-constrained projects / Scheduling / heuristics / combinatorial optimization
© EDP Sciences, ROADEF, SMAI 2019
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.