Issue |
RAIRO-Oper. Res.
Volume 55, Number 4, July-August 2021
|
|
---|---|---|
Page(s) | 2439 - 2468 | |
DOI | https://doi.org/10.1051/ro/2021113 | |
Published online | 25 August 2021 |
A single-consignor multi-consignee multi-item model with permissible payment delay, delayed shipment and variable lead time under consignment stock policy
1
Department of Mathematics, The Gandhigram Rural Institute (Deemed to be University), Gandhigram 624302, Tamil Nadu, India.
* Corresponding author: karthickbalasubramani96@gmail.com
Received:
8
July
2020
Accepted:
25
July
2021
This article proposes a two-level fuzzy supply chain inventory model, in which a single consignor delivers multiple items to the multiple consignees with the consignment stock agreement. The lead time is incorporated into the model and is considered a variable for obtaining optimal replenishment decisions. In addition, crashing cost is employed to reduce the lead time duration. This article investigates four different cases under controllable lead time to analyze the best strategy, focusing on two delays such as delay-in-payments and delay-in-shipment. In all four cases, all associated inventory costs are treated as a trapezoidal fuzzy number, and a signed distance method is employed to defuzzify the fuzzy inventory cost. An efficient optimization technique is adopted to find the optimal solution for the supply chain. Four numerical experiments are conducted to illustrate the four cases. Any one of these experimental results will provide the best solution for the ideal performance of the business under controllable lead time in the consignment stock policy. Finally, the managerial insights, conclusion and future direction of this model are provided.
Mathematics Subject Classification: 90B05
Key words: Consignment stock / controllable lead time / delay in shipment / delay in payment / fuzzy cost
© The authors. Published by EDP Sciences, ROADEF, SMAI 2021
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.