Open Access
Issue |
RAIRO-Oper. Res.
Volume 55, Number 4, July-August 2021
|
|
---|---|---|
Page(s) | 2439 - 2468 | |
DOI | https://doi.org/10.1051/ro/2021113 | |
Published online | 25 August 2021 |
- S.P. Aggarwal and C.K. Jaggi, Ordering policies of deteriorating items under permissible delay in payments. J. Oper. Res. Soc. 46 (1995) 658–662. [Google Scholar]
- B. Ahmad and L. Benkherouf, On an optimal replenishment policy for inventory models for non-instantaneous deteriorating items with stock dependent demand and partial backlogging. RAIRO:OR 54 (2020) 69–79. [CrossRef] [Google Scholar]
- S.M. Ali and K. Nakade, Scenario-based supply chain disruptions management framework: a quantitative approach. Innov. Supply Chain Manage. 8 (2014) 81–91. [CrossRef] [Google Scholar]
- K.M. Björk, An analytical solution to a fuzzy economic order quantity problem. Int. J. Approximate Reasoning 50 (2009) 485–493. [CrossRef] [Google Scholar]
- M. Braglia and L. Zavanella, Modelling an industrial strategy for inventory management in supply chains: the “Consignment Stock’’ case. Int. J. Prod. Res. 41 (2003) 3793–3808. [CrossRef] [Google Scholar]
- S. Bylka, The consignment stock of inventories under buyer’s warehouse space limitation. Int. J. Prod. Res. 58 (2020) 912–930. [CrossRef] [Google Scholar]
- A. Chakraborty, T. Maiti and B.C. Giri, Consignment stock policy in a closed-loop supply chain. RAIRO:OR 55 (2021) S1913–S1934. [CrossRef] [Google Scholar]
- N. Çömez-Dolgan, L. Moussawi-Haidar and M.Y. Jaber, A buyer–vendor system with untimely delivery costs: traditional coordination vs. VMI with consignment stock. Comput. Ind. Eng. 154 (2021) 107009. [CrossRef] [Google Scholar]
- S. Ebrahimi, S.M. Hosseini-Motlagh and M. Nematollahi, Proposing a delay in payment contract for coordinating a two-echelon periodic review supply chain with stochastic promotional effort dependent demand. Int. J. Mach. Learn. Cybern. 10 (2019) 1037–1050. [CrossRef] [Google Scholar]
- M. Ganesh Kumar and R. Uthayakumar, Modelling on vendor-managed inventory policies with equal and unequal shipments under GHG emission-trading scheme. Int. J. Prod. Res. 57 (2019) 3362–3381. [CrossRef] [Google Scholar]
- B. Ganguly, B. Sarkar, M. Sarkar, S. Pareek and M. Omair, Influence of controllable lead time, premium price, and unequal shipments under environmental effects in a supply chain management. RAIRO:OR 53 (2019) 1427–1451. [CrossRef] [Google Scholar]
- A. Gharaei, M. Karimi and S.A.H. Shekarabi, An integrated multi-product, multi-buyer supply chain under penalty, green, and quality control polices and a vendor managed inventory with consignment stock agreement: the outer approximation with equality relaxation and augmented penalty algorithm. Appl. Math. Modell. 69 (2019) 223–254. [CrossRef] [Google Scholar]
- B.C. Giri and M. Masanta, A closed-loop supply chain model with uncertain return and learning-forgetting effect in production under consignment stock policy. Oper. Res. 20 (2020) 1–29. DOI: 10.1007/s12351-020-00571-9. [Google Scholar]
- B.C. Giri, A. Chakraborty and T. Maiti, Effectiveness of consignment stock policy in a three-level supply chain. Oper. Res. 17 (2017) 39–66. [Google Scholar]
- R.M. Hill, The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem. Int. J. Prod. Res. 37 (1999) 2463–2475. [CrossRef] [Google Scholar]
- Q. Huang and J. Chen, A note on “Modelling an industrial strategy for inventory management in supply chains: the ‘Consignment Stock’ case”. Int. J. Prod. Res. 47 (2009) 6469–6475. [CrossRef] [Google Scholar]
- R. Jamshidi, S.F. Ghomi and B. Karimi, Flexible supply chain optimization with controllable lead time and shipping option. Appl. Soft Comput. 30 (2015) 26–35. [CrossRef] [Google Scholar]
- J.K. Jha and K. Shanker, Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints. Appl. Math. Model. 37 (2013) 1753–1767. [CrossRef] [Google Scholar]
- B. Karthick and R. Uthayakumar, Optimizing an imperfect production model with varying setup cost, price discount, and lead time under fuzzy demand. Process Integr. Optim. Sustain. 5 (2021) 13–29. [CrossRef] [Google Scholar]
- B. Karthick and R. Uthayakumar, A multi-item sustainable manufacturing model with discrete setup cost and carbon emission reduction under deterministic and trapezoidal fuzzy demand. Process Integr. Optim. Sustain. 5 (2021) 1–39. DOI: 10.1007/s41660-021-00159-6. [CrossRef] [Google Scholar]
- N. Kazemi, E. Ehsani and M.Y. Jaber, An inventory model with backorders with fuzzy parameters and decision variables. Int. J. Approximate Reasoning 51 (2010) 964–972. [CrossRef] [Google Scholar]
- L.Y. Ouyang and J.S. Yao, A minimax distribution free procedure for mixed inventory model involving variable lead time with fuzzy demand. Comput. Oper. Res. 29 (2002) 471–487. [CrossRef] [Google Scholar]
- S. Rani, R. Ali and A. Agarwal, Fuzzy inventory model for deteriorating items in a green supply chain with carbon concerned demand. Opsearch 56 (2019) 91–122. [CrossRef] [MathSciNet] [Google Scholar]
- B. Sarkar, An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production. Appl. Math. Comput. 218 (2012) 8295–8308. [Google Scholar]
- S.K. Sardar and B. Sarkar, How does advanced technology solve unreliability under supply chain management using game policy? Mathematics 8 (2020) 1191. [CrossRef] [Google Scholar]
- B. Sarkar, B. Mandal and S. Sarkar, Quality improvement and backorder price discount under controllable lead time in an inventory model. J. Manuf. Syst. 35 (2015) 26–36. [Google Scholar]
- B. Sarkar, A. Majumder, M. Sarkar, N. Kim and M. Ullah, Effects of variable production rate on quality of products in a single-vendor multi-buyer supply chain management. Int. J. Adv. Manuf. Technol. 99 (2018) 567–581. [Google Scholar]
- B. Sarkar, C. Zhang, A. Majumder, M. Sarkar and Y.W. Seo, A distribution free newsvendor model with consignment policy and retailer’s royalty reduction. Int. J. Prod. Res. 56 (2018) 5025–5044. [CrossRef] [Google Scholar]
- B. Sarkar, M. Omair and N. Kim, A cooperative advertising collaboration policy in supply chain management under uncertain conditions. Appl. Soft Comput. 88 (2020) 105948. [CrossRef] [Google Scholar]
- B. Sarkar, B.K. Dey, M. Sarkar, S. Hur, B. Mandal and V. Dhaka, Optimal replenishment decision for retailers with variable demand for deteriorating products under a trade-credit policy. RAIRO:OR 54 (2020) 1685–1701. [Google Scholar]
- S.K. Sardar, B. Sarkar and B. Kim, Integrating machine learning, radio frequency identification, and consignment policy for reducing unreliability in smart supply chain management. Processes 9 (2021) 247. [CrossRef] [Google Scholar]
- S. Shabani, A. Mirzazadeh and E. Sharifi, A two-warehouse inventory model with fuzzy deterioration rate and fuzzy demand rate under conditionally permissible delay in payment. J. Ind. Prod. Eng. 33 (2016) 134–142. [Google Scholar]
- A.K. Sharma, S. Tiwari, V.S.S. Yadavalli and C.K. Jaggi, Optimal trade credit and replenishment policies for non-instantaneous deteriorating items. RAIRO:OR 54 (2020) 1793–1826. [Google Scholar]
- D. Shin, R. Guchhait, B. Sarkar and M. Mittal, Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model. RAIRO:OR 50 (2016) 921–934. [CrossRef] [Google Scholar]
- C. Srinivas and C.S.P. Rao, Optimization of supply chains for single-vendor–multibuyer consignment stock policy with genetic algorithm. Int. J. Adv. Manuf. Technol. 48 (2010) 407–420. [CrossRef] [Google Scholar]
- G. Valentini and L. Zavanella, The consignment stock of inventories: industrial case and performance analysis. Int. J. Prod. Econ. 81 (2003) 215–224. [Google Scholar]
- H. Yi and B.R. Sarker, An optimal consignment stock production and replenishment policy with controllable lead time. Int. J. Prod. Res. 51 (2013) 6316–6335. [CrossRef] [Google Scholar]
- H.F. Yu and W.K. Hsu, An integrated inventory model with immediate return for defective items under unequal-sized shipments. J. Ind. Prod. Eng. 34 (2017) 70–77. [Google Scholar]
- S.K. Zahran, M.Y. Jaber and S. Zanoni, The consignment stock case for a vendor and a buyer with delay-in-payments. Comput. Ind. Eng. 98 (2016) 333–349. [CrossRef] [Google Scholar]
- L. Zavanella and S. Zanoni, A one-vendor multi-buyer integrated production-inventory model: the “Consignment Stock” case. Int. J. Prod. Econ. 118 (2009) 225–232. [CrossRef] [Google Scholar]
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.