Free Access
Issue
RAIRO-Oper. Res.
Volume 55, 2021
Regular articles published in advance of the transition of the journal to Subscribe to Open (S2O). Free supplement sponsored by the Fonds National pour la Science Ouverte
Page(s) S673 - S698
DOI https://doi.org/10.1051/ro/2020007
Published online 02 March 2021
  • S.P. Aggarwal and C.K. Jaggi, Ordering policies of deteriorating items under permissible delay in payments. J. Oper. Res. Soc. 46 (1995) 658–662. [Google Scholar]
  • A. Arkan and S.R. Hejazi, Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period. Comput Indus. Eng. 62 (2012) 56–69. [Google Scholar]
  • A. Banerjee, A joint economic-lot-size model for purchaser and vendor. Deci. Sci. 17 (1986) 292–311. [Google Scholar]
  • M. Ben-Daya and A. Raouf, Inventory models involving lead time as a decision variable. J. Oper. Res. Soc. 45 (1994) 579–582. [Google Scholar]
  • M. Braglia, D. Castellano and D. Song, Distribution-free approach for stochastic Joint-Replenishment Problem with backorders- lost sales mixtures, and controllable major ordering cost and lead times. Comput. Oper. Res. 79 (2017) 161–173. [Google Scholar]
  • M. Braglia, D. Castellano, L. Marrazzini and D. Song, A continuous review, (Q,r) inventory model for a deteriorating item with random demand and positive lead time. Comput. Oper. Res. 109 (2019) 102–121. [Google Scholar]
  • L.H. Chen and F.S. Kang, Coordination between vendor and buyer considering trade-credit and items of imperfect quality. Int. J. Prod. Econ. 123 (2010) 52–61. [Google Scholar]
  • K.J. Chung and T.S. Huang, The optimal retailer’s ordering policies for deteriorating items with limited storage capacity under trade-credit financing. Int. J. Prod. Econ. 106 (2007) 127–145. [Google Scholar]
  • G. Gallego and I. Moon, The distribution free newsboy problem: review and extensions, J. Oper. Res. Soc. 44 (1993) 825–834. [Google Scholar]
  • I. Giannoccaro and P. Pontrandolfo, Supply chain coordination by revenue sharing contracts. Int. J. Prod. Econ. 89 (2004) 131–139. [Google Scholar]
  • B.C. Giri and B. Roy, A single-manufacturer multi-buyer supply chain inventory model with controllable lead time and price-sensitive demand. J. Indus. Prod. Eng. 32 (2015) 516–527. [Google Scholar]
  • C.H. Glock, Lead time reduction strategies in a single-vendor-single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. Int. J. Prod. Econ. 136 (2012) 37–44. [Google Scholar]
  • S.K. Goyal, An integrated inventory model for a single supplier-single customer problem. Int. J. Prod. Res. 15 (1976) 107–111. [Google Scholar]
  • S.K. Goyal, Economic order quantity under conditions of permissible delay in payments. J. Oper. Res. Soc. 36 (1985) 335–338. [Google Scholar]
  • S.K. Goyal, A joint economic-lot-size model for purchaser and vendor: a comment. Deci. Sci. 19 (1988) 236–241. [Google Scholar]
  • D. Ha and S.L. Kim, Implementation of JIT purchasing: an integrated approach. Prod. Plan. Control l8 (1997) 152–157. [Google Scholar]
  • J. Heydari, P. Zaabi-Ahmadi and T.M. Choi, Coordinating supply chains with stochastic demand by crashing lead times. Comput. Oper. Res. 100 (2018) 394–403. [Google Scholar]
  • C.K. Huang, An integrated inventory model under conditions of order processing cost reduction and permissible delay in payments. Appl. Math. Model. 34 (2010) 1352–1359. [Google Scholar]
  • J.K. Jha and K. Shanker, Two-echelon supply chain inventory model with controllable lead time and service level constraint. Comput. Indus. Eng. 57 (2009) 1096–1104. [Google Scholar]
  • J.K. Jha and K. Shanker, Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints. Appl. Math. Model. 37 (2013) 1753–1767. [Google Scholar]
  • E. Katok and D.Y. Wu, Contracting in supply chains: a laboratory investigation. Manage. Sci. 55 (2009) 1953–1968. [Google Scholar]
  • R.S. Kumar and A. Goswami, A continuous review production-inventory system in fuzzy random environment: minmax distribution free procedure, Comp. Ind. Eng. 79 (2015) 65–75. [Google Scholar]
  • S.J. Kim, B. Sarkar and S. Sarkar, An inventory model with backorder price discount and stochastic lead time. DJ J. Eng. Appl. Math. 42 (2019) 34–48. [Google Scholar]
  • B.G. Kingsman, The effect of payment rules on ordering and stockholding in purchasing. J. Oper. Res. Soci. 34 (1983) 1085–1098. [Google Scholar]
  • W.C. Lee, Inventory model involving controllable backorder rate and variable lead time demand with the mixtures of distri- bution. Appl. Math. Comput. 160 (2005) 701–717. [Google Scholar]
  • W.C. Lee, J.W. Wu and J.W. Hsu, Computational algorithm for inventory model with a service level constraint, lead time demand with the mixture of distributions and controllable negative exponential backorder rate. Appl. Math. Comput. 175 (2006) 1125–1138. [Google Scholar]
  • Y. Li, X. Xu and F. Ye, Supply chain coordination model with controllable lead time and service level constraint. Comput. Indus. Eng. 61 (2011) 858–864. [Google Scholar]
  • G. Li, X. Guan, M. Liu and M. Shan, Two-echelon inventory model with service level constraint and controllable lead time sensitive to order quantity. J. Cent. South Univ. 20 (2013) 3324–3333. [Google Scholar]
  • C.J. Liao and C.H. Shyu, An analytical determination of lead time with normal demand. Int. J. Oper. Prod. Manage. 11 (1991) 72–78. [Google Scholar]
  • B.N. Mandal and S. Phaujdar, Some EOQ models under permissible delay in payments. Int. J. Manage. Syst. 5 (1989) 99–108. [Google Scholar]
  • P. Mandal and B.C. Giri, A single-vendor multi-buyer integrated model with controllable lead time and quality improvement through reduction in defective items. Int. J. Syst. Sci. Oper. Logist. 2 (2015) 1–14. [Google Scholar]
  • U. Mishra, An inventory model for Weibull deterioration with stock and price dependent demand. Int. J. Appl. Comput. Math. 3 (2017) 1951–1967. [Google Scholar]
  • U. Mishra and C. K. Tripathy, An inventory model for Weibull deteriorating items with salvage value. Int. J. Logist. Syst. Manage. 22 (2015) 67–76. [Google Scholar]
  • U. Mishra, J. Tijerina-Aguilera, S. Tiwari and L.E. Cárdenas-Barrón, Retailer’s joint ordering, pricing, and preservation technology investment policies for a deteriorating item under permissible delay in payments. Math. Probl. Eng. 2018 (2018) 1–14. [Google Scholar]
  • L.Y. Ouyang and K.S. Wu, Mixture inventory model involving variable lead time with a service level constraint. Comput. Oper. Res. 24 (1997) 875–882. [Google Scholar]
  • L.Y. Ouyang and B.R. Chuang, Mixture of inventory model involving variable lead time and controllable backorder rate. Comput. Indus. Eng. 40 (2001) 339–348. [Google Scholar]
  • L.Y. Ouyang, N.C. Yeh and K.S. Wu, Mixture inventory model with backorders and lost sales for variable lead time. J. Oper. Res. Soc. 47 (1996) 829–832. [Google Scholar]
  • L.Y. Ouyang, K.S. Wu and C.H. Ho, Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time. Int. J. Prod. Econ. 92 (2004) 255–266. [Google Scholar]
  • L.Y. Ouyang, K.S. Wu and C.H. Ho, An integrated vendor-buyer inventory model with quality improvement and lead time reduction. Int. J. Prod. Econ. 108 (2007) 349–358. [Google Scholar]
  • J.C.H. Pan and J.S. Yang, A study of an integrated inventory with controllable lead time. Int. J. Prod. Res. 40 (2002) 1263–1273. [Google Scholar]
  • S. Sarkar and B.C. Giri, Stochastic supply chain model with imperfect production and controllable defective rate. Int. J. Syst. Sci. Oper. Logist. 7 (2018) 133–146. [Google Scholar]
  • S. Sarkar and B.C. Giri, A vendor-buyer integrated inventory system with variable lead time and uncertain market demand. Oper. Res. 20 (2020) 491–515. [Google Scholar]
  • S. Sarkar, B.C. Giri and A.K. Sarkar, A vendor-buyer inventory model with lot-size and production rate dependent lead time under time value of money. RAIRO: OR. 54 (2020) 961–979 [Google Scholar]
  • B. Sarkar, B. Mandal and S. Sarkar, Quality improvement and backorder price discount under controllable lead time in an inventory model. J. Manuf. Syst. 35 (2015) 26–36. [Google Scholar]
  • S. Tiwari, H.M. Wee and S. Sarkar, Lot-sizing policies for defective and deteriorating items with time-dependent demand and trade credit. Euro. J. Indus. Eng. 11 (2017) 683–703. [Google Scholar]
  • Z.K. Weng, Modeling quantity discounts under general price-sensitive demand functions: optimal policies and relationships. Euro. J. Oper. Res. 86 (1995) 300–314. [Google Scholar]
  • K.S. Wu, (Q;r) Inventory model with variable lead time when the amount received is uncertain. J. Inf. Manage. Sci. 11 (2000) 81–94. [Google Scholar]
  • K.S. Wu, L.Y. Ouyang and C.H. Ho, Integrated vendor-buyer inventory system with sub lot sampling inspection policy and controllable lead time. Int. J. Syst. Sci. 38 (2007) 339–350. [Google Scholar]
  • J.S. Yang and J.C. Pan, Just-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investment. Int. J. Prod. Res. 42 (2004) 853–863. [Google Scholar]
  • J.Q. Yang, X.M. Zhang, H. Fu and C. Liu, Inventory competition in a dual-channel supply chain with delivery lead time consideration. Appl. Math. Model. 42 (2017) 675–692. [Google Scholar]
  • C. Zikopoulos, Remanufacturing lot sizing with stochastic lead-time resulting from stochastic quality of returns. Int. J. Prod. Res. 55 (2017) 1565–1587. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.